Planning application

Twyn Hywel Energy Park Land North-West Of Caerphilly

Decided Caerphilly 26/0395/COND Condition Discharge

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Discharge condition 26 (SI stability) of planning consent 25/0342/NCC(Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

As published by the council, reference 26/0395/COND

Application record

Reference
26/0395/COND
Type
Condition Discharge
Status
Decided
Decision
Decide Cond Discharge case
Received
4 Jun 2026
Validated
5 Jun 2026
Decided
31 Jul 2026
Ward
Nelson
Decision by
Delegated

Site history

Applications at this address on the Caerphilly register

This site has had 21 applications since 2025: 2 approved, 0 refused.

  • 26/0561/NMA Awaiting decision

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Seek approval of a non material amendment to planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor) to vary the wording of condition 37 (PROW) to include the below wording: Following the application of the micro-siting protocol (condition 39), if the location of turbine 7 (as shown on ES Figure 4.1a: Infrastructure Layout) would mean that the blades of turbine 7 oversail the public right of way (GELI/BWY117E/1) then no blades can be erected on turbine 7 until the public right of way has been diverted to ensure the blades do not oversail

    Submitted 20 Aug 2026 Amendments
  • 26/0524/COND Awaiting decision

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 06 (CEMP) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Submitted 30 Jul 2026 Conditions
  • 26/0279/COND Decided

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 22 (Borrow pits) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 29 Jun 2026 Conditions
  • 26/0107/COND Decided

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 25 (Hydrogeological) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 17 Apr 2026 Conditions
  • 26/0062/COND Awaiting decision

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 28 (TV interference) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Submitted 26 Jan 2026 Conditions
  • 26/0041/COND Awaiting decision

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge conditions 14 (Condition Highway Survey) and 15 (Highway damage remediation scheme) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Submitted 15 Jan 2026 Conditions
  • 26/0018/COND Decided

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 39 (Micrositing) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 22 Apr 2026 Conditions
  • 25/0870/COND Decided

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 38 (Arb Assessment) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 17 Apr 2026 Conditions
  • 25/0871/COND Awaiting decision

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 38 (Arb Assessment) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)

    Submitted 10 Dec 2025 Conditions
  • 25/0839/NMA Awaiting decision

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Seek approval of a non material amendment to planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to vary the wording of condition 18 (Habitat Management Plan) to change the trigger point

    Submitted 27 Nov 2025 Amendments

Timeline

Dates from the published record

  1. 4 Jun 2026

    Received by Caerphilly

  2. 5 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. 31 Jul 2026

    Decision issued: Decide Cond Discharge case

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

794 applications on PlanIndex · across 123 councils · 92% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Applicant on file, registered in Cardiff

19 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

  • DELEGATED REPORT Delegated Report · 31 Jul 2026
  • DECISION Decision · 31 Jul 2026
  • MINING REMEDIATION COMMENTS Consultee Comment · 24 Jun 2026
  • ENVIRONMENTAL HEALTH MANAGER COMMENTS Consultee Comment · 10 Jun 2026
  • 25.0342.NCC S73 DECISION Decision · 04 Jun 2026
  • APPLICATION FORM Application Form · 04 Jun 2026
  • GROUND INVESTIGATION REPORT SUMMARY TABLE Report · 04 Jun 2026
  • DETAILS LETTER Correspondence · 04 Jun 2026
  • SITE LOCATION PLAN OS Extract · 04 Jun 2026
  • COVERING LETTER Correspondence · 04 Jun 2026

Trade members open them from here.

Open the documents

After the decision

Caerphilly has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Caerphilly

  • 26/0575/COND Awaiting decision

    Ascona Retail Ltd - Shell Service Station Newbridge By-pass Crumlin Newport NP11 4QJ

    Discharge conditions 03 (NRW contamination) and 07 (NRW decommissioning) of planning consent 23/0440/FULL (Demolish existing petrol filling station and car sales facilities and replace with new petrol filling station including new underground tanks, canopy, shop, food and drink sales pod, jet wash and associated facilities)

    1 Sep 2026 Conditions
  • 26/0570/COND Awaiting decision

    Unit 5 & Unit 6 To 7 Blackwood Gate Retail Park Blackwood NP12 2FS

    Discharge condition 07 (Waste) of planning consent 26/0260/FULL (Refurbish Unit 5 and Unit 6/7 including external amalgamation works to create 1 no. retail unit for continued use within Class A1, erect a rear extension, relocated customer entrance/exit, new condenser plant, new trolley shelters, and all associated works)

    27 Aug 2026 Conditions
  • 26/0569/COND Awaiting decision

    Unit 5 & Unit 6 To 7 Blackwood Gate Retail Park Blackwood NP12 2FS

    Discharge condition 6 (Plant/Machinery) of planning consent 26/0260/FULL (Refurbish Unit 5 and Unit 6/7 including external amalgamation works to create 1 no. retail unit for continued use within Class A1, erect a rear extension, relocated customer entrance/exit, new condenser plant, new trolley shelters, and all associated works)

    27 Aug 2026 Conditions
  • 26/0571/COND Awaiting decision

    Unit 5 & Unit 6 To 7 Blackwood Gate Retail Park Blackwood NP12 2FS

    Discharge condition 8 (Trolley Shelter) of planning consent 26/0260/FULL (Refurbish Unit 5 and Unit 6/7 including external amalgamation works to create 1 no. retail unit for continued use within Class A1, erect a rear extension, relocated customer entrance/exit, new condenser plant, new trolley shelters, and all associated works)

    27 Aug 2026 Conditions
  • 26/0441/COND Decided

    Land At Former Rosecarn Woodland Drive Newbridge Newport NP11 5FQ

    Discharge conditions 03 (Materials-samples/details), 04 (Boundary treatment - implement variable), 05 (Landscaping - standard), 06 (Tree/Hedgerow Protection) and 15 (Driveway materials) of planning consent 26/0210/FULL (Erect two bedroom detached bungalow, detached garage and associated works)

    29 Jun 2026 Conditions