Twyn Hywel Energy Park Land North-West Of Caerphilly

Awaiting decision Caerphilly 26/0561/NMA Non-Material Amendments

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Seek approval of a non material amendment to planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor) to vary the wording of condition 37 (PROW) to include the below wording: Following the application of the micro-siting protocol (condition 39), if the location of turbine 7 (as shown on ES Figure 4.1a: Infrastructure Layout) would mean that the blades of turbine 7 oversail the public right of way (GELI/BWY117E/1) then no blades can be erected on turbine 7 until the public right of way has been diverted to ensure the blades do not oversail

As published by the council, reference 26/0561/NMA

Application record

Reference
26/0561/NMA
Type
Non-Material Amendments
Status
Awaiting decision
Received
20 Aug 2026
Validated
21 Aug 2026
Ward
Nelson
Decision by
Delegated

Site history

Applications at this address on the Caerphilly register

This site has had 21 applications since 2025: 2 approved, 0 refused.

  • 26/0524/COND Awaiting decision

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 06 (CEMP) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Submitted 30 Jul 2026 Conditions
  • 26/0395/COND Decided

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 26 (SI stability) of planning consent 25/0342/NCC(Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 31 Jul 2026 Conditions
  • 26/0279/COND Decided

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 22 (Borrow pits) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 29 Jun 2026 Conditions
  • 26/0107/COND Decided

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 25 (Hydrogeological) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 17 Apr 2026 Conditions
  • 26/0062/COND Awaiting decision

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 28 (TV interference) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Submitted 26 Jan 2026 Conditions
  • 26/0041/COND Awaiting decision

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge conditions 14 (Condition Highway Survey) and 15 (Highway damage remediation scheme) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Submitted 15 Jan 2026 Conditions
  • 26/0018/COND Decided

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 39 (Micrositing) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 22 Apr 2026 Conditions
  • 25/0870/COND Decided

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 38 (Arb Assessment) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 17 Apr 2026 Conditions
  • 25/0871/COND Awaiting decision

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 38 (Arb Assessment) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)

    Submitted 10 Dec 2025 Conditions
  • 25/0839/NMA Awaiting decision

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Seek approval of a non material amendment to planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to vary the wording of condition 18 (Habitat Management Plan) to change the trigger point

    Submitted 27 Nov 2025 Amendments

Timeline

Dates from the published record

  1. 20 Aug 2026

    Received by Caerphilly

  2. 21 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 30 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 16 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Caerphilly took a median of 55 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

794 applications on PlanIndex · across 123 councils · 92% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Applicant on file, registered in Cardiff

19 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

  • COVERING LETTER Correspondence · 20 Aug 2026
  • APPLICATION FORM Correspondence · 20 Aug 2026
  • DECISION NOTICE 25/0342/NCC Correspondence · 20 Aug 2026
  • SITE LOCATION PLAN OS Extract · 20 Aug 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Caerphilly for determination, against a statutory target of eight weeks. Over the last year Caerphilly decided amendment applications in a median of 25 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

In Caerphilly

  • 26/0547/NMA Awaiting decision

    The Meadows Farm Village Retreat The Meadows Gypsy Lane Groeswen Cardiff CF15 7UN

    Seek approval of a non material amendment to planning consent 25/0632/NCC (Vary conditions 04 (Cafe and coffee shop use restriction) and 05 (Hours General) of planning consent 24/0557/NCC (Vary Condition 4 & 5 of planning consent 22/0713/RET to amend opening hours)) to amend the initial wording of Conditions 8, 10 and 11 to require the details required by these conditions to be submitted, only to the Local Planning Authority within 9 months of the date of this permission, i.e. by the 17 September 2026 (rather than the currently stated 3 months)

    17 Aug 2026 Amendments
  • 26/0228/NMA Granted

    Ffos Caerffili Park Lane Caerphilly

    Seek approval of a non-material amendment to planning consent 23/0273/FULL to permit the construction of structural frame to north of existing building

    31 Mar 2026 Amendments
  • 26/0529/NMA Granted

    187 - 189 High Street Blackwood NP12 1AA

    Seek approval of a non-material amendment to planning consent 25/0106/COU (Change the use of commercial ground floor space and lower ground floor commercial storage to part commercial and part residential for two new dwellings and alterations to shop front) to change lower ground floor flat to a 1 Bed flat and increase the room sizes for both ground floor and lower ground floor flats

    31 Jul 2026 Amendments
  • 26/0477/NMA Granted

    Unit 6 To 7 Blackwood Gate Retail Park Blackwood NP12 2FS

    Seek approval of a non-material amendment planning permission 26/0260/FULL (Refurbish Unit 5 and Unit 6/7 including external amalgamation works to create 1 no. retail unit for continued use within Class A1, erect a rear extension, relocated customer entrance/exit, new condenser plant, new trolley shelters, and all associated works) to amend the wording of Condition 09

    16 Jul 2026 Amendments
  • 26/0527/NMA Awaiting decision

    Land At Grid Ref 318897 198815 Syr Dafydd Avenue Oakdale Blackwood NP12 0LA

    Seek approval of a non-material amendment to planning consent 23/0302/FULL (Erect detached residential dwelling with garage outbuilding, access track and associated landscaping) to amend site layout plan to reflect new curtilage of Penrhiw-bengi Farm and relocate proposed trees from western to northern boundary of site