Planning application
Land Off Winterstoke Road Weston-super-Mare
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction to provide 45no. build to rent residential units with associated parking, landscaping and access via Bridge Road
As published by the council, reference 26/P/0124/FUL
Application record
- Reference
- 26/P/0124/FUL
- Type
- Full Application
- Status
- Registered
- Received
- 21 Jan 2026
- Validated
- 5 Feb 2026
- Ward
- Weston-super-Mare South Ward
- Parish
- Weston-super-Mare
Timeline
Dates from the published record
-
21 Jan 2026
Received by Bristol, City of
-
5 Feb 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Bristol, City of took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
PPML Consulting Ltd Agent, registered in Brighton
Active · incorporated 2004 · Brighton
15 applications on PlanIndex · across 10 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
137 documents on file for this application
- SUPPLEMENTARY PLANNING STATEMENT - NPPF AUGUST 2026
- WESSEX WATER COMMENT 13/08/26
- APARTMENT LAYOUT (WHEELCHAIR) 1B2P
- APARTMENT LAYOUT (WHEELCHAIR) 2B4P
- HTDM COMMENTS
- HOUSING OCCUPATIONAL THERAPIST COMMENT
- CRIME PREVENTION TEAM COMMENTS
- SITE ACCESS PLAN
- RESPONSE TO HOUSING OCCUPATIONAL THERAPIST COMMENTS
- PROPOSED FIRST FLOOR PLAN
- PROPOSED SECOND FLOOR PLAN
- PROPOSED THIRD FLOOR PLAN
- APARTMENT LAYOUT (WHEELCHAIR) 1B2P
- APARTMENT LAYOUT (WHEELCHAIR) 2B4P
- APARTMENT SCHEDULE OF STORAGE AREAS
- PROPOSED GROUND FLOOR PLAN
- SOLAR STUDY - EXISTING
- SOLAR STUDY - PREVIOUS BUILDING
- SOLAR STUDY - PROPOSED
- RESPONSE TO CRIME PREVENTION COMMENTS 21/05/26
- PROPOSED FIRST FLOOR PLAN
- PROPOSED SECOND FLOOR PLAN
- PROPOSED THIRD FLOOR PLAN
- PROPOSED FOURTH FLOOR PLAN
- APARTMENT SCHEDULE OF STORAGE AREAS
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY
- HTDM COMMENTS
- PROPOSED SITE PLAN
- PROPOSED SOUTH ELEVATION
- PROPOSED WEST ELEVATION
- PROPOSED EAST ELEVATION-SECTION-AA-BB
- PROPOSED NORTH ELEVATION
- PROPOSED STREET ELEVATION
- PROPOSED EAST ELEVATION-BUILDING 1
- SOLAR STUDY - PROPOSED
- SOLAR STUDY - PREVIOUS BUILDING
- SOLAR STUDY - EXISTING
- SITE SECTION CC - BUILDING 1
- SITE SECTION BB - BUILDING 2
- SITE SECTION AA - BUILDING 1
- RESPONSE TO PLANNING OFFICER COMMENTS
- RESPONSE TO URBAN DESIGN OFFICER COMMENTS
- SWEPT PATH ANALYSIS REFUSE VEHICLE
- SWEPT PATH ANALYSIS EMERGENCY VEHICLE & LARGE CAR
- URBAN DESIGN OFFICER
- STAGE 1 ROAD SAFETY AUDIT
- RESPONSE TO CRIME PREVENTION COMMENTS 20/03/26
- PROPOSED SITE PLAN
- PROPOSED GROUND FLOOR PLAN
- UNDER-CROFT CAR PARK - WALL TREATMENT
- HARD SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN
- SITE ACCESS PLAN
- ROAD SAFETY AUDIT RESPONSE
- NATIONAL GAS SUBMISSION COMMENT 30/04/26
- PARKS AND OPEN SPACE COMMENT 29/04/26
- RESPONSE TO URBAN DESIGN OFFICER COMMENTS DATED 03/10/2025
- SCHEDULE OF ACCOMMODATION
- PROPOSED FIRST FLOOR PLAN
- PROPOSED SECOND FLOOR PLAN
- PROPOSED THIRD FLOOR PLAN
- PROPOSED FOURTH FLOOR PLAN
- ENVIRONMENTAL PROTECTION
- WESSEX WATER OBJECTION
- ENVIRONMENT AGENCY COMMENTS
- HTDM COMMENTS
- EDUCATION
- ECONOMIC DEVELOPMENT COMMENT 16/03/26
- RESPONSE TO CRIME PREVENTION COMMENTS 03/03/26
- CRIME PREVENTION TEAM COMMENTS
- INTERNAL DRAINAGE BOARD COMMENTS
- LLFA COMMENTS
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY [REDACTED]
- PROPOSED EAST ELEVATION-SECTION-AA-BB
- ENVIRONMENT AGENCY?S RESPONSE
- SEQUENTIAL TEST ADDENDUM
- HIGHWAY ELECTRICAL & ITS
- ECOLOGY OFFICER
- BUILD TO RENT - PRIVATE AFFORDABLE HOUSING STATEMENT
- CRIME PREVENTION TEAM COMMENTS
- HEALTH AND SAFETY EXECUTIVE
- HEALTH AND SAFETY EXECUTIVE - REVOCATION OF HAZARDOUS SUBSTANCES CONSENT
- PROPOSED SITE PLAN
- PROPOSED GROUND FLOOR PLAN
- PROPOSED FIRST FLOOR PLAN
- PROPOSED SECOND FLOOR PLAN
- PROPOSED THIRD FLOOR PLAN
- PROPOSED FOURTH FLOOR PLAN
- APARTMENT LAYOUT (WHEELCHAIR) 1B2P
- APARTMENT LAYOUT (WHEELCHAIR) 2B4P
- SUPERSEDED AFFORDABLE HOUSING
- HIGHWAY ELECTRICAL & ITS
- FIRE HYDRANT REQUIREMENTS
- AVON FIRE & RESCUE - LETTER OF INTEREST
- PRESS ADVERT LIST FOR 19/02/26
- ACCESSIBLE HOUSING STATEMENT
- APPLICATION FORM
- SITE LOCATION PLAN
- PROPOSED GROUND FLOOR PLAN
- PROPOSED FIRST FLOOR PLAN
- PROPOSED SECOND FLOOR PLAN
- PROPOSED THIRD FLOOR PLAN
- PROPOSED FOURTH FLOOR PLAN
- PROPOSED SOUTH ELEVATION
- PROPOSED WEST ELEVATION
- PROPOSED EAST ELEVATION-SECTION-AA-BB
- PROPOSED NORTH ELEVATION
- PROPOSED STREET ELEVATION
- PROPOSED EAST ELEVATION-BUILDING 1
- SOLAR STUDY - PROPOSED
- SOLAR STUDY - EXISTING
- TOPOGRAPHICAL SURVEY
- DRAINAGE STRATEGY LAYOUT
- HARD SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN
- PROPOSED SITE PLAN
- AIR QUALITY ASSESSMENT
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY
- PHASE I GEO-ENVIRONMENTAL REPORT PART 1 JANUARY 2026
- PHASE I GEO-ENVIRONMENTAL REPORT PART 2 JANUARY 2026
- ARCHAEOLOGICAL DESK BASED ASSESSMENT
- ENERGY STATEMENT P02
- TRANSPORT STATEMENT AND APPENDICES PART 1
- TRANSPORT STATEMENT AND APPENDICES PART 2
- TRANSPORT STATEMENT AND APPENDICES PART 3
- TRANSPORT STATEMENT AND APPENDICES PART 4
- TRAVEL PLAN AND APPENDICES
- LIGHTING DESIGN CONSIDERATIONS & ENVIRONMENTAL REPORT
- DESIGN ACCESS STATEMENT ISSUE 3
- CIL FORM 1 - ADDITIONAL INFORMATION
- NOISE IMPACT ASSESMENT
- CONSTRUCTION LOGISTICS PLAN AND APPENDICES
- PRELIMINARY ECOLOGICAL APPRAISAL
- PLANNING STATEMENT
- COVERING LETTER FROM AGENT
- BIO DIVERSITY NET GAIN REPORT
- BIODIVERSITY NET GAIN STATUTORY METRIC
- FLOOD RISK ASSESSMENT SEQUENTIAL AND EXCEPTION TEST
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Bristol, City of for determination, against a statutory target of eight weeks. Over the last year Bristol, City of decided full applications in a median of 81 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Bristol, City of
-
26/P/0622/FUL Granted
Elmfield Cottage Bristol Road Churchill BS25 5NL
Proposed erection of 2no. detached dwelling and creation of associated access.
-
26/P/1380/FUL Granted
Moon And Sixpence 15 The Beach Clevedon BS21 7QU
Extend existing terrace and form new timber balustrading.
-
26/P/1031/FUL Refused
17 Hill Road Clevedon BS21 7NE
Proposed vehicle entrance and new driveway to Woodspring House from existing pedestrian access position to serve parking and turning area at lower ground floor level of the garden. Demolition of a small section of boundary wall and reduced height for small distance to create required visibility and opening for vehicle access, re-use of stone to construct supporting side retaining stone walls and re-use of the few stone steps remaining as entrance threshold for historic reasons. Relocation of cycle/bin/recycling store within driveway area. Removal of sloping tree and new planting.
-
26/P/0108/FUL Granted
Veterinary Surgery 5 Lower Queens Road Clevedon BS21 6LX
Erection of 2no. dwellinghouses. Erection of a two-storey rear extension to existing building to facilitate the change of use of the first floor from a commercial use (Class E) to 1no. self-contained flat
-
26/P/0044/FUL Granted
1 - 3 New Bristol Road Weston-super-Mare BS22 6AD
Retrospective planning application for the proposed erection of a single storey extension to the existing sales building, to be occupied by Greggs PLC, and associated works.