Planning application
Thatchers Cider Company Ltd Myrtle Farm Station Road Sandford BS25 5RA
Works: Extension Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of an extension to the existing Jubilee packaging facility included covered parking area. Demolition of existing structures and the erection of the Roy Hunt building, the Stores building, and the Biomass/Chemical Store building. External works including internal road realignment, service pipes, car parking and landscaping
As published by the council, reference 22/P/3027/FUL
Application record
- Reference
- 22/P/3027/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Approve
- Received
- 19 Dec 2022
- Validated
- 27 Jan 2023
- Decided
- 20 Apr 2023
- Ward
- Banwell And Winscombe
- Parish
- Winscombe And Sandford
- Decision by
- Delegated Decision
- Postcode
- BS25 5RA
Site history
Applications at this address on the Bristol, City of register
This site has had 2 applications since 2020: 2 approved, 0 refused.
-
20/P/2619/FUL Granted
Thatchers Cider Company Ltd Myrtle Farm Station Road Sandford BS25 5RA
Demolition of some older warehouses and office structures to be replaced by an extension to an existing modern warehouse and the erection of a new building referred to as 'The Thatched Barn' to provide meeting facilities. Other works include extension to car park with vehicle access and landscaping. The application is accompanied by an Environmental Impact Assessment Screening Report.
Timeline
Dates from the published record
-
19 Dec 2022
Received by Bristol, City of
-
27 Jan 2023
Validated
Checked as complete and ready for consideration.
-
20 Apr 2023
Decision issued: Approve
-
28 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a surveying firm registered in Bristol
14 applications on PlanIndex · across 2 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
58 documents on file for this application
- DECISION (AOC) APPROVE FOR CONDITION 7 - 23/P/3027/FUL
- DECISION (AOC) APPROVE FOR CONDITION 6 - 23/P/0949/AOC
- DECISION (FUL) APPROVE
- NORTH SOMERSET OFFICER REPORT
- EIA SCREENING OPINION
- CONSULTEE RESPONSE
- HABITATS REGULATIONS ASSESSMENT
- THATCHERS JUBILEE EXT_ADDENDUM
- THATCHERS JUBILEE EXTENSION SHRA SCREENING
- THATCHERS JUBILLE EXTERIORLIGHTING REPORT
- EXTERIOR LIGHTING GROUND FLOOR
- CAMBIUM ? PLANTING SCHEDULE & SPECIFICATION
- LANDSCAPE PROPOSALS ? SHEET 1 OF 2
- LANDSCAPE PROPOSALS ? SHEET 2 OF 2
- PROPOSED BLOCK PLAN
- 22.03.23 LANDSCAPE OFFICER COMMENT
- 20.03.23 NATURAL ENGLAND COMMENTS
- 06.03.23 - HIGHWAYS & TRANSPORT
- 03.03.23 ECOLOGY COMMENTS
- WINSCOMBE AND SANDFORD PARISH COUNCIL COMMENTS.
- PROPOSED JUBILEE ELEVATIONS
- 23.02.23 AVON AND SOMERSET POLICE COMMENTS
- 24.02.23 ECONOMY TEAM RESPONSE
- 20/02/2023 - FLOOD RISK MANAGEMENT TEAM COMMENTS
- EXISTING BLOCK PLAN
- SITE LOCATION PLAN
- PROPOSED NEW BUILDINGS 2023? PLAN FOR MANAGEMENT OF PESTCONTROL.
- 06.02.23 - ENVIRONMENTAL PROTECTION TEAM.
- 16.02.23 - AASW LETTER OF RESPONSE.
- ENERGY AND SUSTAINABILITY STATEMENT - APPENDIX A - BRUKL REPORT
- 06.02.23 - ENVIRONMENTAL PROTECTION TEAM COMMENTS.
- 09.02.23 WESTON MERCURY
- TRANSPORT STATEMENT
- ENERGY AND SUSTAINABILITY STATEMENT
- NOISE IMPACT ASSESSMENT
- DRAWING ISSUE SHEET 500-52
- PROPOSED ROY HUNT & STORES BUILDING - PLANS
- PROPOSED ROY HUNT & STORES BUILDING - ELEVATIONS
- PROPOSED BIOMASS & CHEMICAL STORES - PLANS & ELEVATIONS
- APPLICATIONFORMREDACTED
- EXISTING BLOCK PLAN
- EXISTING JUBILEE FLOORPLAN
- EXISTING JUBILEE ELEVATIONS
- EXISTING NORTHFIELD BUILDINGS FLOORPLANS
- EXISTING NORTHFIELD BUILDINGS ELEVATIONS
- PROPOSED JUBILEE BUILDING FLOORPLAN
- PROPOSED JUBILEE BUILDING ELEVATIONS
- SOFTWORKS KEY PLAN
- TREE SURVEY AND REMOVAL
- LANDSCAPE MAINTENANCE & MANAGEMENT PLAN
- FLOOD RISK ASSESSMENT - PART 2 OF 5
- FLOOD RISK ASSESSMENT - PART 3 OF 5
- FLOOD RISK ASSESSMENT - PART 4 OF 5
- FLOOD RISK ASSESSMENT - PART 5 OF 5
- FLOOD RISK ASSESSMENT - PART 1 OF 5
- DESIGN AND ACCESS STATEMENT
- DRAWING ISSUE SHEET 500-52
- ECOLOGICAL IMPACT ASSESSMENT
Trade members open them from here.
Open the documentsWhat this grant of permission means
Bristol, City of granted permission on 20 April 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Myrtle Farm Station Road Sandford BS25 5RA
Listed building consent for the like-for-like replacement of 4no. windows to the front elevation alongside existing glazed porch.
Refused Heritage and listed buildings Extension Windows or glazing 25 docsSmall domestic -
Thatchers Cider Company Ltd Myrtle Farm Station Road Sandford Winscombe BS25 5RA
84% historically approved · decision due ~20 Mar
Proposed erection of a new warehousing facility known as The John Thatcher Cider Barn. External works to include; internal road realignment, modified access onto Nye Road, creation of a distribution yard, vehicular parking, external lighting and landscaping works.
Awaiting decision Full applications 77 docs -
Thatchers Cider Company Ltd Myrtle Farm Station Road Sandford Winscombe BS25 5RA
84% historically approved · decision due ~20 Mar
Proposed erection of a new warehousing facility known as The John Thatcher Cider Barn. External works to include; internal road realignment, modified access onto Nye Road, creation of a distribution yard, vehicular parking, external lighting and landscaping works.
Awaiting decision Full applications 77 docs -
Land At Myrtle Farm Station Road Sandford BS25 5RA
Discharge of condition No 3 on application 16/P/0069/F
Granted Conditions -
Thatchers Cider Company Ltd Myrtle Farm Station Road Sandford Winscombe BS25 5RA
Screening Opinion request to determine as to whether proposed development is EIA development. Works proposed; erection of a new warehousing facility known as the John Thatcher Cider Barn. External works to include; internal road realignment, modified access onto Nye Road, creation of a distribution yard, vehicular parking, external lighting and landscaping works THIS IS NOT A PLANNING APPLICATION
Decided Outline 10 docs -
Thatchers Cider Company Ltd Myrtle Farm Station Road Sandford BS25 5RA
Demolition of some older warehouses and office structures to be replaced by an extension to an existing modern warehouse and the erection of a new building referred to as 'The Thatched Barn' to provide meeting facilities. Other works include extension to car park with vehicle access and landscaping. The application is accompanied by an Environmental Impact Assessment Screening Report.
Granted Full applications Extension Demolition 121 docs
Other full applications
In Bristol, City of
-
26/P/0955/FUL Granted
Unit 2 Initial House Langford Road Weston-super-Mare BS23 3PQ
Retrospective change of use of Unit 2 from B1 (Use Class E)/B8 storage for use as a garage service centre (Use Class B2).
-
26/P/1454/FUL Granted
Unit 27 Portishead Business Park Old Mill Road Portishead BS20 7BX
Temporary change of use, for a defined trial period of five years, of an existing warehouse (Use Class B8) to a small indoor sports/recreation facility (padel court). Installation of glazed entrance behind the existing roller shutters
-
26/P/1249/FUL Granted
47 Corondale Road Weston-super-Mare BS22 8PY
Proposed erection of 1.5 storey dwelling house in the rear garden area.
-
26/P/1407/FUL Granted
37 Orchard Street Weston-super-Mare BS23 1RH
Proposed infill extension of internal courtyard and reconfiguration to form Deli and Storage Area.
-
26/P/1334/FUL Granted
Building To NE Of Open Acres Backwell Hill Backwell BS48 3EJ
Change of use of part of a building from workshop into 4no. units of short-term visitor accommodation (Class C1) and associated building operations (all retrospective)