Skip to content
PlanIndex Get alerts
Menu

Planning application

Patricks Fold 36 Scotch Street, Armagh, BT61 7HB

Awaiting decision Armagh City, Banbridge and Craigavon LA08/2026/0918/LBC Listed Building Consent

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed Window Repairs and Selective Replacement of Timber Sashes at Patrick’s Fold, Former Bank of Ireland Building (HB15/18/003)

As published by the council, reference LA08/2026/0918/LBC

Application record

Reference
LA08/2026/0918/LBC
Type
Listed Building Consent
Status
Consultation Open
Received
24 Aug 2026
Validated
24 Aug 2026
Ward
Demesne
Postcode
BT61 7HB

Timeline

Dates from the published record

  1. 24 Aug 2026

    Received by Armagh City, Banbridge and Craigavon

  2. 2 Sep 2026

    Added to PlanIndex

  3. 21 Sep 2026

    Status changed to Consultation Open

    Previously Valid.

  4. Decision

    Awaiting decision

    Decision expected by 19 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Armagh City, Banbridge and Craigavon took a median of 118 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Whittaker & Watt Architects Agent, an architecture practice registered in Newtownabbey

Active · incorporated 2012 · Newtownabbey

30 applications on PlanIndex · across 10 councils · 96% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Armagh City, Banbridge and Craigavon for determination, against a statutory target of eight weeks. Over the last year Armagh City, Banbridge and Craigavon decided heritage and listed building applications in a median of 80 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 20 Dobbin Street, Armagh, BT61 7QQ

    LA08/2024/0898/LBC Submitted 6 Aug 2024 100 yards away

    Restoration, renovation and internal and external alterations to the existing dwelling including replacement of existing rainwater goods and construction of new external concrete steps and landing to facilitate a new raised finished floor level to the rear of the building to match the existing floor level to the front of the property

    Granted Heritage and listed buildings 13 docs
    Domestic
  • 20 Dobbin Street, Armagh, BT61 7QQ

    LA08/2024/0897/F Submitted 6 Aug 2024 100 yards away

    Restoration, renovation and internal and external alterations to the existing dwelling including replacement of existing rainwater goods and construction of new external concrete steps and landing to facilitate a new raised finished floor level to the rear of the building to match the existing floor level to the front of the property

    Granted Full applications 15 docs
    Domestic
  • Immediately adjacent to and south of (to rear of) nos.12 to 16A Abbey Lane, Armagh, BT61 7DW, with access via alleyway between 16A and 18 Abbey Lane

    LA08/2025/0232/F Submitted 21 Feb 2025 150 yards away

    97% historically approved · decision due ~23 May

    Extension (addition of 3rd floor), alterations and change of use from storage building (Use Class B4) (adjacent to and south-west of 12 Abbey Lane) to provide 1no. 1-bedroom apartment (Use Class C1(a)) on second and third floors with bin storage on ground floor. Extension (addition of 2nd and 3rd floors), alterations and conversion of vacant building (5 metres south of 16A Abbey Lane) to provide 2no. 2-storey 2-bedroom town houses

    Awaiting decision Full applications Extension 22 docs
  • 20 Thomas Street, Armagh, BT61 7PX

    LA08/2024/0113/F Submitted 31 Jan 2024 150 yards away

    Erection of extension to first and second floor living accommodation to form new two bedroom apartment and a one bedroom apartment. Refurbishment and alterations and extension of existing ground floor retail unit to form new ground floor retail shop frontage.

    Granted Full applications Extension 23 docs
  • The Mall Shopping Centre The Mall West, Armagh, BT61 7AJ (north northeast elevation facing The Mall West)

    LA08/2026/0138/A Submitted 30 Jan 2026 150 yards away

    Recessed totem signage, replacement of existing recessed signage with new recessed totem signage advertising retail tenants

    Granted Advertising 14 docs
  • 2 Mallview Terrace, Corporation, Armagh, BT61 9AN

    LA08/2025/1444/F Submitted 20 Nov 2025 150 yards away

    97% historically approved · decision due ~29 Jan

    Erection of extensions and alterations to existing office building including all other associated site works

    Awaiting decision Full applications Extension 10 docs

In Armagh City, Banbridge and Craigavon

  • LA08/2026/1052/LBC Awaiting decision

    23 Moyallan Road, Ballymacanallen, Portadown, Craigavon BT63 5JX

    Demolition of single storey rear extension and replacement with two storey rear extension to include ground floor kitchen extension and first floor dressing room, and associated siteworks.

    Received 25 Sep, published by the council 12 Oct 2026 Heritage and listed buildings
  • 4 Drumnavaddy Road, Dromore, BT25 1JT

    Change of use of existing school house to a dwelling to include alterations and extension of existing building.

    Received 14 Apr, published by the council 29 Jul 2026 Heritage and listed buildings
  • LA08/2026/1015/LBC Awaiting decision

    41 Lower Lisdrumchor Road, Glenanne, Armagh, BT60 2HT

    Proposed single storey extension to the side of an existing Grade B1 listed building with site works and associated landscaping.

    Received 14 Sep, published by the council 28 Sep 2026 Heritage and listed buildings
  • Tdi House 90 Market Street, Tandragee, Craigavon, BT62 2BW

    Erection of 2 no. shop signs (replacing existing signage)

    Received 29 Jan, published by the council 29 Jul 2026 Heritage and listed buildings
  • LA08/2026/0675/LBC Withdrawn

    Danske Bank 74-76 Scotch Street, Armagh, BT61 7DH

    External redecoration works and essential repairs to chimney render and roof covering. Replacement of timber single glazed sliding sash fittings with new security glazed and safety glazed pre-finished hardwood double glazed sliding sash fittings.

    Received 23 Jun, published by the council 29 Jul 2026 Heritage and listed buildings