Skip to content
PlanIndex Get alerts
Menu

Planning application

Immediately adjacent to and south of (to rear of) nos.12 to 16A Abbey Lane, Armagh, BT61 7DW, with access via alleyway between 16A and 18 Abbey Lane

Awaiting decision Armagh City, Banbridge and Craigavon LA08/2025/0232/F Full

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Extension (addition of 3rd floor), alterations and change of use from storage building (Use Class B4) (adjacent to and south-west of 12 Abbey Lane) to provide 1no. 1-bedroom apartment (Use Class C1(a)) on second and third floors with bin storage on ground floor. Extension (addition of 2nd and 3rd floors), alterations and conversion of vacant building (5 metres south of 16A Abbey Lane) to provide 2no. 2-storey 2-bedroom town houses

As published by the council, reference LA08/2025/0232/F

Application record

Reference
LA08/2025/0232/F
Type
Full
Status
Consultation Open
Received
21 Feb 2025
Validated
28 Mar 2025
Ward
Demesne
Postcode
BT61 7DW

Timeline

Dates from the published record

  1. 21 Feb 2025

    Received by Armagh City, Banbridge and Craigavon

  2. 28 Mar 2025

    Validated

    Checked as complete and ready for consideration.

  3. 7 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 23 May 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Armagh City, Banbridge and Craigavon took a median of 105 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Armagh City, Banbridge and Craigavon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 20 Thomas Street, Armagh, BT61 7PX

    LA08/2024/0113/F Submitted 31 Jan 2024 39m away

    Erection of extension to first and second floor living accommodation to form new two bedroom apartment and a one bedroom apartment. Refurbishment and alterations and extension of existing ground floor retail unit to form new ground floor retail shop frontage.

    Granted Full applications Extension 23 docs
  • 36 & 36B Thomas Street, Armagh, BT61 7QB

    LA08/2024/1312/F Submitted 7 Nov 2024 44m away

    Erection of two apartments to the rear of existing building

    Withdrawn Full applications New dwelling 19 docs
    Several homes
  • 43 Thomas Street, Armagh, BT61 7QB

    LA08/2026/0199/F Submitted 23 Feb 2026 62m away

    Change of use from retail premises to a console/gaming and entertainment centre (sui generis use class). Includes installation of gaming consoles, seating areas and a reception desk

    Granted Full applications 16 docs
  • Lands adjacent and to the rear of No's 35-37 Thomas Street, Armagh, BT61 7QB, with access off Thomas Street.

    LA08/2026/0017/DCA Submitted 8 Jan 2026 73m away

    100% historically approved · decision due ~5 Mar

    Demolition of rear building, which is of concrete block construction , metal doors, boarded up windows, corrugated metal roof and PVC rainwater goods. Demolition of a rear concrete wall with a lean-to metal roof is also proposed as part of the application.

    Awaiting decision Heritage and listed buildings Demolition Windows or glazing 8 docs
  • No’s 35-37 Thomas Street (and lands immediately adjacent and west / to the rear of No’s 35-37 Thomas Street), Armagh, BT61 7QB, with access off Thomas Street.

    LA08/2025/1548/O Submitted 17 Dec 2025 73m away

    76% historically approved · decision due ~5 Mar

    Site for 12 apartments, involving the demolition of existing rear structures and associated site works

    Awaiting decision Outline New dwelling Demolition 24 docs
    Major scheme
  • St Malachys Primary School, 11 Chapel Lane, Armagh, BT61 7EG

    LA08/2026/0735/DC Submitted 3 Jul 2026 114m away

    Discharge of Condition 02 of LA08/2026/0639/S54 which reads: The demolition consent is granted subject to the implementation of the redevelopment scheme allowed and granted full planning permission under application LA08/2023/1665/F. Until evidence of funding for the scheme is evident and a letter of confirmation is submitted to and approved in writing by the Council, demolition of the buildings and structures on site shall not commence.

    Decided Conditions Demolition 5 docs

In Armagh City, Banbridge and Craigavon

  • 156a Navan Fort Road, Killylea, Armagh, BT60 4PY

    Extension and alterations to dwelling, erection of retaining walling and fencing, and associated site works

    11 Jul 2026 Full applications
  • Lands 25m North-West of No.120 Hanslough Road, Middletown, BT60 4JJ

    Erection of Replacement Agricultural Building to provide agricultural machinery storage building and associated works

    8 Dec 2025 Full applications
  • Lands 50m South of 51 Corran Road, Clady More, Armagh BT60 2EU (with access onto Vestry Road).

    Erection of dwelling and garage - change of house type to dwelling & garage approved under planning application Ref: LA08/2017/1219/RM

    27 Apr 2026 Full applications
  • Site located approximately 31m north-east of 12 Boggle Hill, Gilford, Craigavon, BT63 6AF

    Erection of dwelling and garage with associated site works (Amended plans)

    10 Nov 2025 Full applications
  • Lands approximately 14 metres southwest of No.70 Foxwood Hall, Lurgan, BT66 7XS and 18 metres east of No.25 Pines Court, Lurgan, Craigavon BT66 7BZ

    Erection of 2 no. single storey dwellings with sunrooms (with garage for site 192), solar panels and associated landscaping and siteworks (change of house type to replace 2 no. single storey dwellings without sunrooms on sites 192 and 193 to that approved under LA08/2019/1419/F).

    10 Jun 2026 Full applications