Planning application
4 Drumnavaddy Road, Dromore, BT25 1JT
Works: Extension Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use of existing school house to a dwelling to include alterations and extension of existing building.
As published by the council, reference LA08/2026/0428/LBC
Application record
- Reference
- LA08/2026/0428/LBC
- Type
- Listed Building Consent
- Status
- Determined
- Decision
- Granted
- Received
- 14 Apr 2026
- Validated
- 14 Apr 2026
- Decided
- 15 Sep 2026
- Ward
- Donaghcloney
- Postcode
- BT25 1JT
Site history
Applications at this address on the Armagh City, Banbridge and Craigavon register
This site has had 2 applications since 2026: 2 approved, 0 refused.
-
LA08/2026/0427/F Granted
4 Drumnavaddy Road, Dromore, BT25 1JT
Change of use of existing school house to a dwelling to include alterations and extension of existing building.
Timeline
Dates from the published record
-
14 Apr 2026
Received by Armagh City, Banbridge and Craigavon
-
29 Jul 2026
Added to PlanIndex
-
15 Sep 2026
Decision issued: Granted
Who's behind it
Company information only, from the register and Companies House
Mcadam Stewart Architects Agent, an architecture practice registered in Banbridge
Active · incorporated 2003 · Banbridge
80 applications on PlanIndex · across 8 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
32 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Armagh City, Banbridge and Craigavon granted permission on 15 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
4 Drumnavaddy Road, Dromore, BT25 1JT
Change of use of existing school house to a dwelling to include alterations and extension of existing building.
Granted Full applications Extension 35 docsDomestic
Other heritage and listed building applications
In Armagh City, Banbridge and Craigavon
-
LA08/2026/1052/LBC Awaiting decision
23 Moyallan Road, Ballymacanallen, Portadown, Craigavon BT63 5JX
Demolition of single storey rear extension and replacement with two storey rear extension to include ground floor kitchen extension and first floor dressing room, and associated siteworks.
-
LA08/2026/1015/LBC Awaiting decision
41 Lower Lisdrumchor Road, Glenanne, Armagh, BT60 2HT
Proposed single storey extension to the side of an existing Grade B1 listed building with site works and associated landscaping.
-
LA08/2026/0113/LBC Granted
Tdi House 90 Market Street, Tandragee, Craigavon, BT62 2BW
Erection of 2 no. shop signs (replacing existing signage)
-
LA08/2026/0675/LBC Withdrawn
Danske Bank 74-76 Scotch Street, Armagh, BT61 7DH
External redecoration works and essential repairs to chimney render and roof covering. Replacement of timber single glazed sliding sash fittings with new security glazed and safety glazed pre-finished hardwood double glazed sliding sash fittings.
-
LA08/2026/0923/LBC Granted
Middletown Market House, 6-8 Main Street, Middletown, Armagh, BT60 4JF
Proposed Internal works to building to include replacing all existing fluorescent lighting to low energy LED units throughout the building.