Skip to content
PlanIndex Get alerts
Menu

Planning application

Existing telecommunications site 4.0m East of British Telecom Telephone Exchange Building Pound Street Newtownards BT23 4nX

Granted Ards and North Down LA06/2026/0374/F Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

The removal and replacement of the existing headframe and support poles of telecommunication tower. 4No. existing 0.3m dishes, 1No. existing 0.6m dish and 3No. existing antennas to be relocated onto new headframe and the installation of 3No. proposed antennas. The internal upgrade of the existing equipment cabin and ancillary development thereto.

As published by the council, reference LA06/2026/0374/F

Application record

Reference
LA06/2026/0374/F
Type
Full
Status
Determined
Decision
Granted
Received
30 Apr 2026
Validated
30 Apr 2026
Decided
27 Aug 2026
Ward
Conway Square
Postcode
BT23 4NX

Timeline

Dates from the published record

  1. 30 Apr 2026

    Received by Ards and North Down

  2. 29 Jul 2026

    Added to PlanIndex

  3. 27 Aug 2026

    Decision issued: Granted

Who's behind it

Company information only, from the register and Companies House

WHP Telecoms Ltd Agent, a telecoms contractor registered in Warrington

Active · incorporated 1998 · Warrington

1,149 applications on PlanIndex · across 173 councils · 69% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Ards and North Down granted permission on 27 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Gable Wall of No. 53 South Street Newtownards BT23 4JU

    LA06/2026/0311/A Submitted 13 Apr 2026 56m away

    1no. Digital sign

    Granted Advertising 14 docs
  • Boyd Rice Solicitors 6 Mill Street, Newtownards, BT23 4LU

    LA06/2025/0540/F Submitted 19 Jun 2025 110m away

    99% historically approved · decision due ~19 Aug

    Non-compliance of Condition No. 03 of Planning Approval LA06/2024/0290/F to allow use at first floor as office accomodation (amended proposal)

    Awaiting decision Full applications 10 docs
  • Cordners,13 Conway Square, Newtownards, BT23 4DA

    LA06/2026/0780/DC Submitted 25 Aug 2026 147m away

    100% historically approved · decision due ~20 Oct

    Discharge of Condition 2 of previously approved application LA06/2025/1089/F which states:- No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by Ards and North Down Borough Council (ANDBC) in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: • The identification and evaluation of archaeological remains within the site; • Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; • Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and •Preparation of the digital, documentary and material archive for deposition. Reason: As required by Section 61 of the Planning Act (Northern Ireland) to ensure that archaeological remains within the application site are properly identified, and protected or appropriately recorded. Archaeological Impact assessment and Programme of Works proposed development works at Cordners, 13 Conway Square, Newtownards BT23 4DA

    Awaiting decision Conditions 3 docs
  • Cordners, 13 Conway Square & 4 Lower Mary Street, Newtownards, BT23 4DA

    LA06/2025/1089/F Submitted 2 Dec 2025 148m away

    Replacement of fire damaged shop unit, raise roof level to rear of no 13, raise roof ridge level and facade alterations to no 4.

    Granted Full applications 35 docs
  • 71-79 South Street, Newtownards, BT23 4JU

    LA06/2025/0462/F Submitted 30 May 2025 149m away

    Demolition of existing terraces and replacement with a social housing development comprising 9no. residential units (8no. semi-detached and 1no. detached) with associated access to rear (via existing lane onto John Street), parking, landscaping and ancillary development including sewage treatment plant (Amended plans)

    Granted Full applications Demolition 64 docs
  • Vacant land to the rear 58 South Street, Newtownards

    LA06/2024/0318/F Submitted 4 Apr 2024 186m away

    Erection of 5 new dwellings (1 Detached and 4 Semi Detached houses) Variation of Condition 4 of planning approval LA06/2017/0836/F – concerning Verification Report (Full proposal description available on the NI Planning Portal)

    Withdrawn Full applications New dwelling 7 docs
    Several homes

In Ards and North Down

  • LA06/2026/0824/F Awaiting decision

    Mental Health Outpatients Centre Ards Community Hospital Church Street Newtownards BT23 4AS

    Installation of storage container on concrete slab for secure file storage, with covered canopy to existing mental health unit.

    Received 9 Sep, published by the council 14 Sep 2026 Full applications
  • 2 Glenview Road, Holywood, BT18 0PU

    Single-storey extension to rear and side

    Received 10 Aug, published by the council 14 Aug 2026 Full applications
  • Lands at 111 Quarry Heights and 24 North Road, Newtownards, BT23 7AN

    Housing development comprising 22no. units - retention of units in non-compliance with condition 18 of LA06/2023/2222/F regarding long-term management / maintenance of communal open space.

    Received 6 Aug, published by the council 14 Aug 2026 Full applications
  • 51 Donaghadee Road, Bangor BT20 4QY

    Roofspace conversion (inc. rear dormer, rooflights and gable window)

    Received 6 Aug, published by the council 14 Aug 2026 Full applications
  • 20 Sandringham Drive, Bangor, BT20 5NA

    Demolition of garage; Single-storey rear extension; Garage to rear; Alterations to access; Patio to side.

    Received 3 Aug, published by the council 7 Aug 2026 Full applications