Planning application
LA06/2026/0211/F
34 Whiteways, Newtownards, BT23 4UW
Proposal
Alterations to front elevation/porch, rear dormer (with juliet balcony) and changes to materials.
As published by the council, reference LA06/2026/0211/F
Timeline
Dates from the published record
-
11 Mar 2026
Received by Ards and North Down
-
22 Apr 2026
Decision issued: Granted
-
29 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
LA06/2026/0156/F Granted
7 Falcon Heights, Newtownards, BT23 4GF
Garage conversion to create bedroom/shower room and erection of rear/side fence.
-
LA06/2026/0513/F Awaiting decision
10 Blackwood Green, Newtownards, BT23 4XR
Single story rear extension.
-
LA06/2026/0206/DC Awaiting decision
Rear of 30 Mountain Road, Newtownards, BT23 4UL
Discharge of Condition 6 of Approval - LA06/2019/0820/F which reads: "A Final Construction Method Statement (FCMS) must be submitted to Council and approved in writing prior to commencement of any works on site, to include ground preparation or vegetation clearance. This shall reflect all the mitigation and avoidance measures outlined in the Outline Construction Method Statement prepared by Blackstaff Ecology on behalf of the applicant. The approved FCMS shall be adhered to and implemented throughout the construction period in accordance with the approved details, unless otherwise agreed in writing with the Council. Reason: To ensure that the appointed contractor undertaking the work is fully appraised of all the risks associated with the proposal and to provide effective 9 mitigation ensuring there are no adverse impacts on the integrity of any European site"
-
LA06/2026/0530/F Granted
Land 20m to the rear of 89B Mountain Road, Newtownards, BT23 4UL
1 no dwelling (two storey, four bedroom detached)
Other full applications applications
In Ards and North Down
-
LA06/2025/1155/F Granted
389 Old Holywood Road Holywood BT18 9QH
Two-storey and single-storey extensions to front
-
LA06/2025/0902/F Granted
9-15 Crawfords Farm Grove, Bangor, BT19 1PL
Retention of 5 dwellings, access and parking, and erection of new dwelling (Change of house type to approval LA06/2017/0877/RM) (Amended Plans)
-
LA06/2025/1089/F Granted
Cordners, 13 Conway Square & 4 Lower Mary Street, Newtownards, BT23 4DA
Replacement of fire damaged shop unit, raise roof level to rear of no 13, raise roof ridge level and facade alterations to no 4.
-
LA06/2026/0451/F Granted
18a Old Seahill Road, Holywood, BT18 0EG
Front and side extension (including front balcony, elevational changes and use of garage to habitable room)
-
LA06/2026/0179/F Granted
21 Cambourne Park Newtownards BT23 4WE
Extension of domestic curtilage and erection of fence (retrospective)