Rear of 30 Mountain Road, Newtownards, BT23 4UL

Awaiting decision Ards and North Down LA06/2026/0206/DC Discharge of Condition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of Condition 6 of Approval - LA06/2019/0820/F which reads: "A Final Construction Method Statement (FCMS) must be submitted to Council and approved in writing prior to commencement of any works on site, to include ground preparation or vegetation clearance. This shall reflect all the mitigation and avoidance measures outlined in the Outline Construction Method Statement prepared by Blackstaff Ecology on behalf of the applicant. The approved FCMS shall be adhered to and implemented throughout the construction period in accordance with the approved details, unless otherwise agreed in writing with the Council. Reason: To ensure that the appointed contractor undertaking the work is fully appraised of all the risks associated with the proposal and to provide effective mitigation ensuring there are no adverse impacts on the integrity of any European site"

As published by the council, reference LA06/2026/0206/DC

Application record

Reference
LA06/2026/0206/DC
Type
Discharge of Condition
Status
Consultation Open
Received
9 Mar 2026
Validated
9 Mar 2026
Ward
Glen
Postcode
BT23 4UL

Timeline

Dates from the published record

  1. 9 Mar 2026

    Received by Ards and North Down

  2. 29 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 4 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Ards and North Down took a median of 81 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Mark McIntyre Architect Agent, an architecture practice

8 applications on PlanIndex · across 3 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Ards and North Down for determination, against a statutory target of eight weeks. Over the last year Ards and North Down decided condition discharge and variation applications in a median of 61 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land 20m to the rear of 89B Mountain Road, Newtownards, BT23 4UL

    LA06/2026/0530/F Submitted 13 Jun 2026 300 yards away

    1 no dwelling (two storey, four bedroom detached)

    Granted Full applications 23 docs
    Domestic
  • 4 Tullynagardy Park Newtownards BT23 4ZA

    LA06/2022/1126/F Submitted 9 Nov 2022 400 yards away

    Single storey side extension

    Granted Full applications Extension 14 docs
    Small domestic
  • Lands SW of 10 Golden Glen Road, Newtownards, BT23 4YT

    LA06/2025/1042/DC Submitted 21 Nov 2025 0.3 miles away

    Discharge Condition 8 (LA06/2022/1250/F) No development shall be commenced until the agreement of NIW has been secured in relation to safeguarding of NIW Infrastructure (Critical NI public watermain/s) traversing the site

    Granted Conditions 7 docs
  • Lands SW of 10 Golden Glen Road Newtownards BT23 4YT

    LA06/2026/0245/DC Submitted 25 Mar 2026 0.3 miles away

    Discharge of Condition 7 of Planning approval LA06/2022/1250/F - No development shall take place-on-site until the method of sewage disposal has been agreed in writing with Northern Ireland Water or a Consent to discharge has been granted under the terms of the Water (Northern Ireland) Order 1999 by the relevant authority. Evidence of this consent shall be submitted to the Council prior to the commencement of any development

    Granted Conditions 7 docs
  • 7-9 Golden Glen Road Newtownards BT23 4YT

    LA06/2023/1458/F Submitted 9 Feb 2023 0.3 miles away

    Change of use from office and stables to dwelling

    Granted Full applications 22 docs
    Domestic
  • 9 Golden Glen Road, Newtownards, BT23 4YT

    LA06/2026/0192/F Submitted 5 Mar 2026 0.3 miles away

    Raised terrace to side; detached garage to front

    Granted Full applications 14 docs

In Ards and North Down

  • LA06/2026/0884/DC Awaiting decision

    Vacant site North of Balloo Road, West of Bangor Grammar sports pitches and to the rear of nos 1-13 Rowan Glen, Balloo Road, Bangor, BT19 7UU

    Discharge of Condiition 10 of previously approved application LA06/2022/0873/F which states - Prior to the construction of the drainage network, the applicant shall submit a Drainage Assessment, compliant with Policy FLD 3 & Annex D of PPS 15, to be agreed in writing with the Council, which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, agreed under Article 161 under the Water and Sewerage Services Act (Northern Ireland) 2016, in a 1 in 100 year event. Reason: In order to safeguard against surface water flood risk

    Received 25 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0887/DC Awaiting decision

    Former Juvenile Justice Services Centre site (169 Rathgael Road) and surrounding lands which lie to the north of the Rathgael Road and west of the Rathgael Road/Balloo Road/Newtownards Road roundabout junction Bangor

    Discharge of Condition 9 of previously approved application LA06/2016/0596/F which states - Prior to the occupation of the proposed development, the applicant shall provide to the Council, for approval, a Verification Report. This report must demonstrate that all the measures outlined in Section 10 of the RPS report entitled Proposed Residential Development, Rathgael Road, Bangor, Remedial Strategy referenced IBR0736 and bearing the Council date stamp 17th June 2016 have been fully implemented. The Verification Report shall demonstrate the successful completion of the remediation works and that the site is now fit for end-use. It must demonstrate that the identified potential pollutant linkages are effectively broken. The Verification Report shall be in accordance with current best practice and guidance as outlined by the Environment Agency. In particular, this Verification Report must demonstrate: a) Full Details of the installation and depths of the clean cover barriers have been confirmed as per layout. b) All fuel transfer lines and all associated pipework have been traced and removed in accordance with PPG 2 Above Ground Oil Storage Tanks. All remaining soils (or base and side-walls of all excavations) have been sampled and proven suitable for the proposed end-use. c) The hotspots of heavy metal and hydrocarbon contamination have been removed by excavation to a depth of 0.5m below the depth of the exceedance. All remaining soils (or base and side-walls of all excavations) have been sampled and demonstrably proven suitable for the proposed end-use. d) All imported soil brought on to the site has been accompanied by traceability documentation and has been demonstrably proven to be suitable for the end use. Reason: In the interests of living conditions of residents of the proposed development. Remedial Verification Report

    Received 25 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0879/DC Awaiting decision

    Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, BT20 5ED

    Discharge of Condition 6 of previously approved application LA06/2021/1477/F which states - Prior to the construction of the drainage network, a Drainage Assessment, compliant with FLD 3 & Annex D of PPS 15, shall be submitted to and agreed in writing by the Council which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, in a 1 in 100 year event with an additional allowance for climate change. Reason: To safeguard against flood risk to the development and from the development to elsewhere. Drainage Assessment produced by Design ID ref 19053-DID-ZZ-XX-RP-0002

    Received 23 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0878/DC Awaiting decision

    Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, T20 5ED

    Discharge of Condition 5 of previously approved application LA06/2021/1477/F which states - No development shall take place on-site until the method of sewage disposal has been agreed in writing with Northern Ireland Water (NIW) or a consent to discharge has been granted under the terms of the Water (NI) Order 1999. Reason: To ensure there will be no adverse impact on the environment. NI Water agreement

    Received 23 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0873/DC Awaiting decision

    Lands South of 37-77 Court Street and 1-11 Canal Row, situated within Bawn Wall and bounded by the canal, Newtowards

    Discharge of Condition 15 of previously approved application LA06/2023/2434/F which states - On completion of the remediation and prior to the occupation of any dwelling hereby approved, the applicant shall provide to the Council, for approval in writing, a Verification Report. This report shall demonstrate that the remediation measures outlined in the report titled; ‘Contaminated Land Assessment (Phase 1 PRA, Phase 2 GQRA and Outline Remediation Strategy) Lands within the Bawn Wall, Newtownards, referenced P3098-1 and dated November 2023, have been fully implemented. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use and include details of: • Capping system • The methodology and programme of the capping system • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer • Photographs of the clean material being used and placed on the source area, also showing depths being placed • Records and photographs showing the depth of the capping system as required • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use. Reason: Protection of human health. VERIFICATION REPORT FOR PHASE 5 (UNITS 1-6 AND 34-41)

    Received 23 Sep, published by the council 1 Oct 2026 Conditions