Skip to content
PlanIndex Get alerts
Menu

Planning application

LA06/2025/0771/F

11 The Square, Comber, BT23 5DX

Awaiting decision Ards and North Down Full

Proposal

Two storey extension to the side of existing retail unit

As published by the council, reference LA06/2025/0771/F

Timeline

Dates from the published record

  1. 2 Sep 2025

    Received by Ards and North Down

  2. 29 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Ards and North Down for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 11b The Square, Comber, BT23 5DX

    Two-storey extension to front (replacing utility room), alterations to finishes and windows,

    22 Dec 2025 52m away Full applications
  • Comber Pharmacy, 4 The Square, Comber, BT23 5DT

    2 Digital signs

    23 Apr 2026 80m away Advertising
  • 25 Bridge Street, Comber, BT23 5AT

    Material change of use from photographic studio to residential dwelling including single storey extension to the rear

    28 Jan 2026 158m away Full applications
  • 20 Bridge Street Link, Comber, BT23 5YH

    1x illuminated Shop sign

    11 Mar 2026 174m away Advertising
  • Lands to the rear of 23-61 Castle Street, Comber, BT23 5EA

    Discharge of Condition 6 of previously approved application LA06/2021/1220/F which states - Prior to the occupation of the proposed development, a Verification Report shall be submitted to and agreed in writing by the Council. This report shall demonstrate that the remediation measures outlined in the Pentland Macdonald report; Contamination Assessment and remediation strategy, Castle Lane, Comber referenced PM19- 1137 and dated December 20219 have been implemented. The Verification Report shall demonstrate the successful completion of remediation works and that the site is now fit for end-use (Residential with Plant Uptake). It must demonstrate that the identified potential pollutant linkages are effectively broken. The Verification Report shall be in accordance with current guidance and best practice. In particular, this Verification Report must demonstrate that: • The final site layout including areas of hardstandlng, gardens and soft landscaped areas are as specified in the Site Plan Proposed Drawing No. 03A. • The emplacement of capping layers across gardens and landscaped areas is as specified: In garden areas- 1m capping layer comprising a capillary break layer of a minimum of 300mm of granular material; overlain by 700mm of clean subsoil and topsoil and in soft landscaped areas- the emplacement of a 0.5m thick capping layer of glean gravel/ subsoil topsoil. All material used in the capping layers must be demonstrably proven suitable for use. • Gas protection measures have been installed in line with a Characteristic Situation 2 scenario which attain a gas protection score of 3.5 (Table 4, B88485) and shall include two or more of the following measures: • Concrete floor slabs; • A proprietary gas resistant membrane installed across the entire footprint of the buildings; • A passively ventilated under floor void. The verification of the gas protection measures shall follow CIRIA C735 Good Practice on the testing and verification of protection systems for buildings against hazardous ground gases. Information Submitted: Verification Report

    11 Jun 2026 247m away Conditions
  • Lands to the rear of Nos. 23-61 Castle Street, Comber, BT23 5EA

    Discharge Condition 5 of LA06/2021/1220/F, which states: "A programme of post-excavation analysis, preparation of an archaeological report, dissemination of results and preparation of the excavation archive shall be undertaken in accordance with the programme of archaeological work approved under condition 3. These measures shall be implemented and a final archaeological report shall be submitted to and agreed in writing with the Council within 12 months of the completion of archaeological site works, or as otherwise agreed in writing with the Council."

    29 Jan 2026 249m away Conditions

In Ards and North Down

  • 389 Old Holywood Road Holywood BT18 9QH

    Two-storey and single-storey extensions to front

    29 Dec 2025 Full applications
  • 9-15 Crawfords Farm Grove, Bangor, BT19 1PL

    Retention of 5 dwellings, access and parking, and erection of new dwelling (Change of house type to approval LA06/2017/0877/RM) (Amended Plans)

    13 Oct 2025 Full applications
  • Cordners, 13 Conway Square & 4 Lower Mary Street, Newtownards, BT23 4DA

    Replacement of fire damaged shop unit, raise roof level to rear of no 13, raise roof ridge level and facade alterations to no 4.

    2 Dec 2025 Full applications
  • 18a Old Seahill Road, Holywood, BT18 0EG

    Front and side extension (including front balcony, elevational changes and use of garage to habitable room)

    25 May 2026 Full applications
  • 21 Cambourne Park Newtownards BT23 4WE

    Extension of domestic curtilage and erection of fence (retrospective)

    2 Mar 2026 Full applications