Planning application
Lands at and to the rear of 18 – 52 Main Street (Reeds Rain to TK Maxx), 2 – 34 King Street, 5 -17 Southwell Road, 5 – 41 Queen’s Parade, Marine Gardens car park, the Esplande Gardens, and area around McKee Clock
Works: Demolition
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Discharge of conditions 16, 38 and 44 of Planning Approval LA06/2023/1500/F which read: Condition16 - No development, including ground preparation or vegetation clearance, shall take place, with the exception of the establishment of the two site compounds and any archaeological works required under conditions 17 and 18 as shown on phasing drawing No. 58C bearing the date stamp 30 June 2022 and any archaeological works required under conditions 17 and 18 below, until a final Construction and Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Council. This shall reflect all of the mitigation and avoidance measures detailed in the outline CEMP and the Ecological Impact Assessment. The approved CEMP shall be implemented in accordance with the approved details and all works on site shall conform to the approved CEMP, unless otherwise agreed in writing by the Council. The CEMP shall include the following: a) Construction methodology and timings of works; b) Pollution Prevention Plan; including suitable buffers between the location of all construction works, storage of excavated spoil and construction materials, any refuelling, storage of oil/fuel, concrete mixing and washing areas and any watercourses or surface drains present on or adjacent to the site; c) Site Drainage Management Plan; including Sustainable Drainage Systems (SuDS), foul water disposal and silt management measures; d) Water Quality Monitoring Plan; e) Environmental Emergency Plan; f) Details of appropriate mitigation measures to protect hedgehogs; g) Details of updated Japanese knotweed surveys to be carried out and any necessary mitigation and/or management measures required; h) Details of the appointment of an Ecological Clerk of Works (ECoW) and their roles and responsibilities i) A Construction Event Management Plan and Construction Site Traffic Management Plan. Condition 38 - Prior to the commencement of development, a dust management plan shall be submitted to and agreed in writing by the Council. This shall outline the site-specific dust mitigation measures to be employed during demolition and construction phases to minimise the generation and movement of dust from the proposed development to surrounding areas. Condition 44 - Prior to the commencement of any works on site with the exception of the establishment of the two site compounds as shown on Drawing No. 58C bearing the date stamp 30 June 2022 and any archaeological works required under conditions 17 and 18 above, an inspection shall be undertaken to review the site conditions and the potential for any re-occurrence of Japanese knotweed. If Japanese knotweed or other invasive species are found, necessary action shall be taken prior to works commencing on site. Details of these inspections and any action required shall be included in the final Construction Environmental Management Plan (CEMP) referred to in condition16 above. The development shall be carried out in accordance with the approved details.
As published by the council, reference LA06/2024/0498/DC
Application record
- Reference
- LA06/2024/0498/DC
- Type
- Discharge of Condition
- Status
- Determined
- Decision
- Condition Discharged
- Received
- 6 Jun 2024
- Validated
- 11 Jun 2024
- Decided
- 24 Sep 2024
- Ward
- Harbour
Timeline
Dates from the published record
-
6 Jun 2024
Received by Ards and North Down
-
11 Jun 2024
Validated
Checked as complete and ready for consideration.
-
24 Sep 2024
Decision issued: Condition Discharged
-
27 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
Lands at and to the rear of 18 – 52 Main Street (Reeds Rain to TK Maxx), 2 – 34 King Street, 5 -17 Southwell Road, 5 – 41 Queen’s Parade, Marine Gardens car park, the Esplande Gardens, and area around McKee Clock, Bangor
96% historically approved · decision due ~31 Jul
Discharge of condition 12 of Planning Approval LA06/2024/0559/F which states ‘The proposed kiosks and shelters indicated as S1-S5 and K1-K4 on Drawing No. 64A shall not exceed 4.25m in height when measured from finished floor level. The internal floor space of the kiosks shall not exceed 20sqm and the footprint of the shelters hereby approved shall not exceed 32sqm. Details of the design and finishes shall be submitted to and approved in writing by the Council prior to commencement of construction of the kiosks and shelters. The development shall be carried out in accordance with the details as subsequently approved.’
Awaiting decision Conditions 4 docs -
Lands at and to the rear of 18 – 52 Main Street (Reeds Rain to TK Maxx), 2 – 34 King Street, 5 -17 Southwell Road, 5 – 41 Queen’s Parade, Marine Gardens car park, the Esplanade Gardens, and area around McKee Clock, Queen's Parade, Bangor, BT20 3BJ
96% historically approved · decision due ~17 Dec
Discharge of Condition 11 of Planning Approval LA06/2024/0559/F which states 'The two pavilion buildings indicated as B1 and B2 on drawing No. 64A, shall be single storey and shall have a maximum ridge height of 6.5m in height when measured from finished floor level and a maximum internal floor space of 200sqm. Details of the design and finishes shall be submitted to and approved in writing by the Council prior to commencement of construction of either of the pavilion buildings. The development shall be carried out in accordance with the details as subsequently approved’
Awaiting decision Conditions Roofing 9 docsSmall domestic -
Lands at and to the rear of 18 – 52 Main Street (Reeds Rain to TK Maxx), 2 – 34 King Street, 5 -17 Southwell Road, 5 – 41 Queen’s Parade, Marine Gardens car park, the Esplande Gardens, and area around McKee Clock
Non Material Change to the planning approval LA06/2020/0097/F: Update to the landscape design for Marine Gardens to remove water feature, update to the description of development to remove reference to a water feature, amendments to footprint/roof plan of pavilion buildings, other minor landscaping design changes, updates to relevant drawing references within Conditions 2, 3, 4, 5, 6, 9, 10, 11, 12, 16, 43, 44, 45, 49, 54, 56 and 57 of LA06/2020/0097/F
Granted Amendments 40 docs -
Lands at and to the rear of 18 – 52 Main Street (Reeds Rain to TK Maxx), 2 – 34 King Street, 5 -17 Southwell Road, 5 – 41 Queen’s Parade, Marine Gardens car park, the Esplande Gardens, and area around McKee Clock, Bangor, BT20 3BJ
Demolition of existing buildings at 5-12 and 35-41 Queen's Parade, 22-30 Main Street (formerly B & M Bargains), 34-36 Main Street (Oxfam and Hospice shops), 6-34 King Street and 5-17 Southwell Road; minor extension and elevational changes to 40-42 Main Street (Caffe Nero); creation of new means of escape and installation of rooflights to 20 Main Street (Halifax); creation of new bin storage and basement access together with minor facade works to 48 Main Street (TK Maxx); erection of a mixed use development comprising culture and leisure facilities (class D), a 66 bedroom hotel, retail units, food and beverage outlets, offices (class B1- (a)), 137 residential units comprising 113 apartments in 3 blocks and 12 duplex apartments along King Street, creation of a new vehicular access onto Southwell Road to serve undercroft car park comprising 217 spaces together with 14 courtyard spaces and 24 on street, creation of new vehicular access onto King Street to serve residential parking, minor modifications to the Main Street and King Street junction and creation of a two-way street along Southwell Road from the junction with Primrose Street, creation of a new service vehicle access onto Main Street, creation of new public squares and courtyards including new pedestrian access points; and the redevelopment of Marine Gardens Car Park including partial demolition of sea-wall to create a public realm space comprising gardens and lawns, play areas, events spaces, covered shelters, 4 kiosks and 2 pavilions (housing food and beverage operators), together with other ancillary development: Variation of condition No. 2 of LA06/2020/0097/F - Amended phasing of development Variation of condition No. 3 of LA06/2020/0097/F - Minor landscape layout amendments to public realm Variation of condition No. 6 of LA06/2020/0097/F - Minor amendments to hard and soft landscaping within public realm Variation of condition No. 14 of LA06/2020/0097/F - Amendment to drawing references showing plant rooms Variation of condition No. 16 of LA06/2020/0097/F - Amendment to reflect updated drawing reference Variation of condition No. 43 of LA06/2020/0097/F - Amended drainage proposals Variation of condition No. 44 of LA06/2020/0097/F - Amendment to reflect updated drawing reference Variation of condition No. 45 of LA06/2020/0097/F - Amendment to reflect updated drawing reference Variation of condition Nos. of 48, 49, 54 and 56 of LA06/2020/0097/F - Amended phasing of roadworks Variation of condition No. 57 of LA06/2020/0097/F - Amendment to reflect updated drawing reference (UPDATED WORDING FOR CONDITION No. 43) THE FULL PROPOSAL DESCRIPTION CAN BE VIEWED ON THE NIPP IN THE DOCUMENT ENTITLED "FULL PROPOSAL DESCRIPTION'
Granted Full applications New dwelling Extension +2 112 docsMajor scheme -
Approx. 46m northwest of 12 Queen's Parade, Marine Gardens, Queen's Parade, Bangor, BT20 3BJ
Erection of art installation with associated lighting and site works within proposed public realm associated with Queen's Parade redevelopment (planning permission reference LA06/2024/0559/F)
Granted Full applications 19 docs -
10-12 & 6-8 Main Street, Bangor BT20 5AG
Sub-division of units 10-12 & 6-8 Main Street, Bangor. Unit 10-12 change of use from cafe/restaurant (Sui-generis) to bookmakers (Sui-generis) at ground floor only with minor shopfront alterations. Retention of unit 6-8 as cafe/restaurant (Sui-generis).
Granted Full applications Windows or glazing 13 docs
Other conditions applications
In Ards and North Down
-
LA06/2026/0705/DC Decided
3 (The Square) Portaferry Road Cloughey BT22 1HR And lands adjoining 5,7 and 9 Portaferry Road, BT22 1HP and 2,12,18 and 22 Mill Lane Cloughey, BT22 1HT
Discharge of Condition 6 of previously approved application LA06/2019/0634/F which states:- The development herby permitted shall not be commenced until a Street Lighting scheme design has been submitted and approved by DFI Street Lighting Section Documents relating to Street Lighting Scheme Design that have been submitted to and Approved by the DFI Street Lighting Section
-
LA06/2026/0760/DC Decided
Lands to rear of 38 High Street Donaghadee with access adjacent to 11-13 New Street Donaghadee
Discharge of Condition 7 of previously approved application LA06/2017/0959/F which states:- No development shall take place until full details of all proposed tree and shrub planting and a programme of works, have been submitted to and approved in writing by the Council and all tree and shrub planting shall be carried out in accordance with those details and at those times. Reason: To ensure the provision, establishment, and maintenance of a high standard of landscape. Please describe which part of the condition this application relates to: This Landscape Proposal presents a design scheme prepared by a qualified landscape architect, and will provide for the provision and establishment of a high standard of landscape. TSA Covering Letter Landscaping Proposal Site Location Plan Decision Notice
-
LA06/2026/0780/DC Awaiting decision
Cordners,13 Conway Square, Newtownards, BT23 4DA
Discharge of Condition 2 of previously approved application LA06/2025/1089/F which states:- No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by Ards and North Down Borough Council (ANDBC) in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: • The identification and evaluation of archaeological remains within the site; • Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; • Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and •Preparation of the digital, documentary and material archive for deposition. Reason: As required by Section 61 of the Planning Act (Northern Ireland) to ensure that archaeological remains within the application site are properly identified, and protected or appropriately recorded. Archaeological Impact assessment and Programme of Works proposed development works at Cordners, 13 Conway Square, Newtownards BT23 4DA
-
LA06/2026/0678/DC Decided
Lands to the rear of 38 High Street, Donaghadee
Partial Discharge of Condition 5 Of Planning Approval LA06/2017/0959/F No site works of any nature, or development shall take place until a programme of archaeological work has been implemented, in accordance with a written scheme and programme prepared by a qualified archaeologist, submitted by the applicant and approved by the Council. The programme should provide for the identification and evaluation of archaeological remains within the site, for mitigation of the impacts of development, through excavation recording or by preservation of remains, and for preparation of an archaeological report. Reason: to ensure that archaeological remains within the application site are properly identified and protected or appropriately recorded. This report presents a written scheme and programme prepared by a qualified archaeologist, and will provide for the identification and evaluation of any potential archaeological remains within the site. Documents provided: TSA Covering Letter Archaeological Programme of Works prepared by Alan Reilly, NAC Ltd. Site location Plan Decision Notice
-
LA06/2026/0656/DC Decided
Lands to and South of Nos 37-77 Court Street and Nos 1-11 Canal Row, situated within Bawn Wall and bounded by the Canal, Newtownards
Discharge of condition 15 of planning approval LA06/2023/2434/F Which States: "On completion of the remediation and prior to the occupation of any dwelling hereby approved, the applicant shall provide to the Council, for approval in writing, a Verification Report. This report shall demonstrate that the remediation measures outlined in the report titled; ‘Contaminated Land Assessment (Phase 1 PRA, Phase 2 GQRA and Outline Remediation Strategy) Lands within the Bawn Wall, Newtownards, referenced P3098-1 and dated November 2023, have been fully implemented. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use and include details of: • Capping system • The methodology and programme of the capping system • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer • Photographs of the clean material being used and placed on the source area, also showing depths being placed • Records and photographs showing the depth of the capping system as required • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use."