Planning application
LA06/2026/0497/DC
Lands at and to the rear of 18 – 52 Main Street (Reeds Rain to TK Maxx), 2 – 34 King Street, 5 -17 Southwell Road, 5 – 41 Queen’s Parade, Marine Gardens car park, the Esplande Gardens, and area around McKee Clock, Bangor
Proposal
Discharge of condition 12 of Planning Approval LA06/2024/0559/F which states ‘The proposed kiosks and shelters indicated as S1-S5 and K1-K4 on Drawing No. 64A shall not exceed 4.25m in height when measured from finished floor level. The internal floor space of the kiosks shall not exceed 20sqm and the footprint of the shelters hereby approved shall not exceed 32sqm. Details of the design and finishes shall be submitted to and approved in writing by the Council prior to commencement of construction of the kiosks and shelters. The development shall be carried out in accordance with the details as subsequently approved.’
As published by the council, reference LA06/2026/0497/DC
Timeline
Dates from the published record
-
5 Jun 2026
Received by Ards and North Down
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Ards and North Down for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
LA06/2025/0914/F Granted
Approx. 46m northwest of 12 Queen's Parade, Marine Gardens, Queen's Parade, Bangor, BT20 3BJ
Erection of art installation with associated lighting and site works within proposed public realm associated with Queen's Parade redevelopment (planning permission reference LA06/2024/0559/F)
-
LA06/2026/0379/A Awaiting decision
1-3 Main Street, Bangor, BT20 5AF
3 Illuminated Shop signs
-
LA06/2026/0107/F Awaiting decision
The King's Quay, 7 - 11 King Street, Bangor, BT20 3AH
Change of use of No. 7 King Street, from residental use to provide an extension to the existing public house and outdoor smoking area on the ground floor, with ancillary storage area on first floor area and Change of Use of first floor area of existing public house from ancillary storage to provide additional seating.
-
LA06/2026/0489/F Awaiting decision
Land North of 35-62 Queen's Parade, South of Bangor Marina, North of Southwell Road and approx 75m South of Pickie Park, Bangor
Children’s play park, 81no. car park spaces, pavilion building (for food and beverage use), associated access, lighting, landscaping and ancillary works
-
LA06/2026/0385/A Granted
8B High Street Bangor BT20 5AY
1 Shop sign (retrospective)
-
LA06/2025/0758/F Awaiting decision
41 Main Street Bangor BT20 5AF
Change of use from shop to Funeral Directors with remembrance hall to be used for ceremonies and rear garage extension (reterospective)(Amended description and application page)
Other conditions applications
In Ards and North Down
-
LA06/2026/0523/DC Decided
Lands to the rear of 23-61 Castle Street, Comber, BT23 5EA
Discharge of Condition 6 of previously approved application LA06/2021/1220/F which states - Prior to the occupation of the proposed development, a Verification Report shall be submitted to and agreed in writing by the Council. This report shall demonstrate that the remediation measures outlined in the Pentland Macdonald report; Contamination Assessment and remediation strategy, Castle Lane, Comber referenced PM19- 1137 and dated December 20219 have been implemented. The Verification Report shall demonstrate the successful completion of remediation works and that the site is now fit for end-use (Residential with Plant Uptake). It must demonstrate that the identified potential pollutant linkages are effectively broken. The Verification Report shall be in accordance with current guidance and best practice. In particular, this Verification Report must demonstrate that: • The final site layout including areas of hardstandlng, gardens and soft landscaped areas are as specified in the Site Plan Proposed Drawing No. 03A. • The emplacement of capping layers across gardens and landscaped areas is as specified: In garden areas- 1m capping layer comprising a capillary break layer of a minimum of 300mm of granular material; overlain by 700mm of clean subsoil and topsoil and in soft landscaped areas- the emplacement of a 0.5m thick capping layer of glean gravel/ subsoil topsoil. All material used in the capping layers must be demonstrably proven suitable for use. • Gas protection measures have been installed in line with a Characteristic Situation 2 scenario which attain a gas protection score of 3.5 (Table 4, B88485) and shall include two or more of the following measures: • Concrete floor slabs; • A proprietary gas resistant membrane installed across the entire footprint of the buildings; • A passively ventilated under floor void. The verification of the gas protection measures shall follow CIRIA C735 Good Practice on the testing and verification of protection systems for buildings against hazardous ground gases. Information Submitted: Verification Report
-
LA06/2026/0656/DC Awaiting decision
Lands to and South of Nos 37-77 Court Street and Nos 1-11 Canal Row, situated within Bawn Wall and bounded by the Canal, Newtownards
Discharge of condition 15 of planning approval LA06/2023/2434/F Which States: "On completion of the remediation and prior to the occupation of any dwelling hereby approved, the applicant shall provide to the Council, for approval in writing, a Verification Report. This report shall demonstrate that the remediation measures outlined in the report titled; ‘Contaminated Land Assessment (Phase 1 PRA, Phase 2 GQRA and Outline Remediation Strategy) Lands within the Bawn Wall, Newtownards, referenced P3098-1 and dated November 2023, have been fully implemented. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use and include details of: • Capping system • The methodology and programme of the capping system • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer • Photographs of the clean material being used and placed on the source area, also showing depths being placed • Records and photographs showing the depth of the capping system as required • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use."
-
LA06/2026/0516/DC Decided
Lands to the rear of Nos. 23-61 Castle Street, Comber, BT23 5EA
Discharge of Condition 12 of previously approved application LA06/2021/1220/F which states:- No residential units shall be occupied until a Landscape Management and Maintenance Plan has been submitted to and approved by the Council in writing. The plan shall set out the period of the plan, long term objectives, management responsibilities, performance measures and maintenance schedules for all areas of landscaping and open space. The landscape management plan shall be carried out as approved in perpetuity. Landscape Management & Maintenance Plan Condition and Discharge of Condition 13. which states:- The long term management and maintenance of the open space, as indicated in blue on Drawing No. 19 shall be undertaken by a management company commissioned by the developer. Details of the arrangements to be put in place to establish the management company and details of the alternative measures which will take effect in the event that the management arrangements break down, must be submitted to and agreed in writing with the Council prior to the occupation of any part of the development hereby permitted Radius Housing letter
-
LA06/2026/0512/DC Decided
Lands to the NW of Kiltonga Industrial Estate SW of Belfast Road and South of Milecross Road Newtownards
Discharge of Condition 20 of previously approved application LA06/2021/1476/F which states:- Prior to the occupation of any dwelling, details of the proposed phased implementation of hard and soft landscaping works must be submitted to and agreed in writing by the Council. The hard and soft landscaping works shall be implemented in accordance with the details and timings agreed in the approved phasing plan. Phase plan to show when we plan to have landscaped areas completed
-
LA06/2026/0645/DC Awaiting decision
Lands at 21 Bridge Road South Helen's Bay
Discharge of Condition 13 of previously approved application LA06/2022/0701/F which states: Prior to any development works commencing on site, the applicant shall submit to the Council for approval in writing an updated Contaminated Land Risk Assessment that has considered and incorporated all available site investigations, data and assessments conducted on this site, and all current and previous correspondence issued by the Environmental Health, Protection and Development Service and the Northern Ireland Environment Agency in relation to land contamination matters present on this site. Reason: In the interests of public health to ensure the site is suitable for use.