Archive · Ards and North Down · 2024
Planning applications in Ards and North Down, June 2024
Ards and North Down recorded 26 planning applications in June 2024, listed newest first. Dates are as received, or as decided where the council publishes no submission date.
Applications, June 2024
Newest first
-
LA06/2024/0578/F Granted
3 Bar Hall Road, Portaferry, Newtownards, BT22 1RQ
Single storey side extension to replace existing conservatory with alteration to and additional fenestration. And erection of external boat store.
-
LA06/2024/0580/F Granted
157 Church Road, Holywood, BT18 9BZ.
Single storey rear extension, first floor extension and dormer to front, flat roof to rear to replace pitched roof.
-
LA06/2024/0579/F Granted
2 Ballymaconnell Road, Bangor, BT20 5PN.
Extension to garage to convert from single storey to two storey with solar panels to dwelling roof.
-
LA06/2024/0588/F Granted
Apartment 3 Carriage Mews, Helen's Bay, BT19 1XA
Change first-floor window to door with addition of balcony
-
LA06/2024/0573/DC Granted
Lands south of the Copelands link roundabout at the Comber bypass
Discharge of Condition no.9 of the planning approval LA06/2019/1252/RM, which state: “Prior to the commencement of development, a phased landscape plan will be submitted to and agreed in writing with council. This phased plan will show the landscaping of the site to be in general conformity with Stamped Approved Drawing Numbers 31 Rev B, 32 REV A,33 Rev B and 34 REV A, date stamped 24 February 2022.”
-
LA06/2024/0566/F Granted
5 Brookvale Avenue Bangor BT19 7ZP
Two storey side extension (Amended Plans)
-
LA06/2024/0569/DC Granted
Lands south of the Copelands link roundabout at the Comber bypass
Discharge of condition 2 & 8 of LA06/2019/1252/RM - submission of a Construction Method Statement and Final Construction Management Plan
-
LA06/2024/0574/LBC Granted
Royal Ulster Yacht Club, 101 Clifton Road, Bangor, BT20 5HY
Replacement Roofing & Repair Works (see Planning Portal for full description) (remaining roof coverings from previous PPM - rosemary clay tile pitched roof coverings, using a minimum of 50% original rosemary tile and 50% 1st quality salvaged rosemary tiles, with crested clay ridge tiles to be set aside for reuse and plain ridge tiles to be replaced with a crested clay tile to match the existing.) Raking and re-pointing of chimneys and remaining historic wall sections, where accessible during roofing works, replacement of failed timber window and localised repairs to existing timber balustrade. Replacement of bitumen felt, flat roof covering, with elastomeric membrane. Replacement of localised internal defective plaster reinstatement works.)
-
LA06/2024/0561/RM Granted
Lands 90m SW of 157 Movilla Road, Newtownards, BT23 8RL
Farm dwelling and detached garage (Amended plans)
-
LA06/2024/0562/F Granted
15 Ardminnan Road Cloughey BT22 1QJ
Demolition of existing rear return and rear/side single storey extension
-
LA06/2024/0553/F Granted
42 Moss Road, Holywood, BT18 9RU
Conversion of outbuildings to residential use with extensions. Change of house type to previous approval LA06/2019/0537/F (retrospective)
-
LA06/2024/0557/F Granted
40 Birch Drive, Bangor, BT19 1RY
Single storey rear extension with rear raised patio
-
LA06/2024/0559/F Granted
Lands at and to the rear of 18 – 52 Main Street (Reeds Rain to TK Maxx), 2 – 34 King Street, 5 -17 Southwell Road, 5 – 41 Queen’s Parade, Marine Gardens car park, the Esplande Gardens, and area around McKee Clock, Bangor, BT20 3BJ
Demolition of existing buildings at 5-12 and 35-41 Queen's Parade, 22-30 Main Street (formerly B & M Bargains), 34-36 Main Street (Oxfam and Hospice shops), 6-34 King Street and 5-17 Southwell Road; minor extension and elevational changes to 40-42 Main Street (Caffe Nero); creation of new means of escape and installation of rooflights to 20 Main Street (Halifax); creation of new bin storage and basement access together with minor facade works to 48 Main Street (TK Maxx); erection of a mixed use development comprising culture and leisure facilities (class D), a 66 bedroom hotel, retail units, food and beverage outlets, offices (class B1- (a)), 137 residential units comprising 113 apartments in 3 blocks and 12 duplex apartments along King Street, creation of a new vehicular access onto Southwell Road to serve undercroft car park comprising 217 spaces together with 14 courtyard spaces and 24 on street, creation of new vehicular access onto King Street to serve residential parking, minor modifications to the Main Street and King Street junction and creation of a two-way street along Southwell Road from the junction with Primrose Street, creation of a new service vehicle access onto Main Street, creation of new public squares and courtyards including new pedestrian access points; and the redevelopment of Marine Gardens Car Park including partial demolition of sea-wall to create a public realm space comprising gardens and lawns, play areas, events spaces, covered shelters, 4 kiosks and 2 pavilions (housing food and beverage operators), together with other ancillary development: Variation of condition No. 2 of LA06/2020/0097/F - Amended phasing of development Variation of condition No. 3 of LA06/2020/0097/F - Minor landscape layout amendments to public realm Variation of condition No. 6 of LA06/2020/0097/F - Minor amendments to hard and soft landscaping within public realm Variation of condition No. 14 of LA06/2020/0097/F - Amendment to drawing references showing plant rooms Variation of condition No. 16 of LA06/2020/0097/F - Amendment to reflect updated drawing reference Variation of condition No. 43 of LA06/2020/0097/F - Amended drainage proposals Variation of condition No. 44 of LA06/2020/0097/F - Amendment to reflect updated drawing reference Variation of condition No. 45 of LA06/2020/0097/F - Amendment to reflect updated drawing reference Variation of condition Nos. of 48, 49, 54 and 56 of LA06/2020/0097/F - Amended phasing of roadworks Variation of condition No. 57 of LA06/2020/0097/F - Amendment to reflect updated drawing reference (UPDATED WORDING FOR CONDITION No. 43) THE FULL PROPOSAL DESCRIPTION CAN BE VIEWED ON THE NIPP IN THE DOCUMENT ENTITLED "FULL PROPOSAL DESCRIPTION'
-
LA06/2024/0547/O Granted
Lands adjoining and 40m south of 1 & 4 Hannay's Hill, Bangor
Farm dwelling & garage
-
LA06/2024/0538/F Granted
Progressive Building Society, 4 Conway Square, Newtownards, BT23 4DD
Replacement of Shop front to match existing. Introduction photovoltaic panels to rear roof.
-
LA06/2024/0530/F Granted
44 Deer Park Road, Portaferry, BT22 1HG
Single storey extension to rear
-
LA06/2024/0515/F Granted
2 Sandhurst Drive, Bangor, BT20 5NX.
Demolition of detached 1.5 storey dwelling with detached garage and replacement detached 1.5 storey and dwelling with integral garage and associated landscaping.
-
LA06/2024/0519/F Granted
85 Hamilton Road, Bangor, BT20 4LN
Demolition of garage with single storey extension to rear and side.
-
LA06/2024/0518/F Granted
145b Abbey Road, Millisle, Newtownards, BT22 2DQ
Roofspace Conversion to provide Ancillary Accommodation, includes Juliet balcony, Dormer window & altering of garage door to window on Front Elevation and additional first-floor window on side elevation
-
LA06/2024/0497/RM Granted
24 Mountstewart Road, Newtownards, BT22 2AL
Proposed dwelling and garage
-
LA06/2024/0498/DC Granted
Lands at and to the rear of 18 – 52 Main Street (Reeds Rain to TK Maxx), 2 – 34 King Street, 5 -17 Southwell Road, 5 – 41 Queen’s Parade, Marine Gardens car park, the Esplande Gardens, and area around McKee Clock
Discharge of conditions 16, 38 and 44 of Planning Approval LA06/2023/1500/F which read: Condition16 - No development, including ground preparation or vegetation clearance, shall take place, with the exception of the establishment of the two site compounds and any archaeological works required under conditions 17 and 18 as shown on phasing drawing No. 58C bearing the date stamp 30 June 2022 and any archaeological works required under conditions 17 and 18 below, until a final Construction and Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Council. This shall reflect all of the mitigation and avoidance measures detailed in the outline CEMP and the Ecological Impact Assessment. The approved CEMP shall be implemented in accordance with the approved details and all works on site shall conform to the approved CEMP, unless otherwise agreed in writing by the Council. The CEMP shall include the following: a) Construction methodology and timings of works; b) Pollution Prevention Plan; including suitable buffers between the location of all construction works, storage of excavated spoil and construction materials, any refuelling, storage of oil/fuel, concrete mixing and washing areas and any watercourses or surface drains present on or adjacent to the site; c) Site Drainage Management Plan; including Sustainable Drainage Systems (SuDS), foul water disposal and silt management measures; d) Water Quality Monitoring Plan; e) Environmental Emergency Plan; f) Details of appropriate mitigation measures to protect hedgehogs; g) Details of updated Japanese knotweed surveys to be carried out and any necessary mitigation and/or management measures required; h) Details of the appointment of an Ecological Clerk of Works (ECoW) and their roles and responsibilities i) A Construction Event Management Plan and Construction Site Traffic Management Plan. Condition 38 - Prior to the commencement of development, a dust management plan shall be submitted to and agreed in writing by the Council. This shall outline the site-specific dust mitigation measures to be employed during demolition and construction phases to minimise the generation and movement of dust from the proposed development to surrounding areas. Condition 44 - Prior to the commencement of any works on site with the exception of the establishment of the two site compounds as shown on Drawing No. 58C bearing the date stamp 30 June 2022 and any archaeological works required under conditions 17 and 18 above, an inspection shall be undertaken to review the site conditions and the potential for any re-occurrence of Japanese knotweed. If Japanese knotweed or other invasive species are found, necessary action shall be taken prior to works commencing on site. Details of these inspections and any action required shall be included in the final Construction Environmental Management Plan (CEMP) referred to in condition16 above. The development shall be carried out in accordance with the approved details.
-
LA06/2024/0496/F Granted
2 Lynne Avenue Bangor BT19 1NZ
Single storey side extension, conversion of attached garage to play room. Formation of new vehicular access and erection of privacy fencing on boundary.
-
LA06/2024/0490/F Granted
22D, Unit 1 Crawfordsburn Road, Newtownards, BT23 4EA
Change of Use from Class B4 (Storage or Distribution Use) to Class D1 (Community & Cultural Use) & Erection of Boundary Fencing (Retrospective)
-
LA06/2024/0484/F Granted
44 Killinchy Rd Comber BT23 5LU
Demolition of existing rear porch and new 1.5-storey rear extension
-
LA06/2024/0488/F Granted
65 Victoria Rd Holywood BT18 9BG
Single storey side extension, demolition of existing garage studio, and alterations to rear return (change of external materials from rednder to cladding with alteration of existing window). (Amended description).
-
LA06/2024/0486/DCA Granted
65 Victoria Rd Holywood BT18 9BG
Demolition of existing side garage, wall beneath existing kitchen window and opening in gable wall to connect proposed laundry room to main dwelling.
Other months in 2024
- January 2024 6
- February 2024 11
- March 2024 17
- April 2024 15
- May 2024 22
- June 2024 26
- July 2024 16
- August 2024 45
- September 2024 41
- October 2024 27
- November 2024 12
- December 2024 14