Planning application
Land Approximately 1.2 Km To The South Of A950 Longside Peterhead Aberdeenshire AB42 0LY
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Consultation under Section 36 of the Electricity Act 1989 for the Installation of Battery Energy Storage System (BESS) with an Installed Capacity of up to 400MW and Associated Works
As published by the council, reference APP/2025/1555
Application record
- Reference
- APP/2025/1555
- Type
- Notification under Electricity Act 1989
- Status
- Decided
- Decision
- Granted As published: No Objection
- Received
- 19 Sep 2025
- Validated
- 19 Sep 2025
- Decided
- 18 May 2026
- Ward
- Central Buchan
- Parish
- Longside & District
- Decision by
- Delegated
- Postcode
- AB42 0LY
Timeline
Dates from the published record
-
19 Sep 2025
Received by Aberdeenshire
-
18 May 2026
Decision issued: No Objection
-
12 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
149 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Aberdeenshire granted permission on 18 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Netherton Hub Land West Of Parkhills Farm Blackhills Peterhead Aberdeenshire
91% historically approved · decision due ~18 Sep
Condition 2b)i, 2b)ii, 2b)iii, 2b)iv, 2b)v, 2b)vi, 2b)vii, 2b)viii, 2b)ix, 2b)x (Development Phase - 400kV and 132KV Substation) of Planning Permission of Planning Permission ref: APP/2024/1714 for Erection of a Strategic Electricity Transmission Hub Including 400kV AC Substation, 132kV AC Substation, 2 HVDC Converter Stations, Transmission Hall, Spares Warehouse, Operations Base and Associated Works
Awaiting decision Conditions 81 docs
Other less common application types
In Aberdeenshire
-
APP/2026/1317 Granted
Mains Of Cowie Stonehaven
Consultation under Section 37 of the Electricity Act 1989 for Change in Pole Height from 8.53m to 14m to Support 11kV Overhead Line
-
APP/2026/1343 Awaiting decision
New Deer To Netherton Hub, Peterhead Tie-In
Consultation under Section 37 of The Electricity Act 1989 for the Installation of 400KV Overhead Lines, 18 Steel Lattice Towers, 2 Temporary Towers and Associated Infrastructure
-
APP/2026/0761 Granted
Glendronach Distillery Forgue Huntly AB54 6DB
Erection of Overhead Line (Retrospective)
-
APP/2024/2146 Granted
Roemex Ltd Badentoy Crescent Badentoy Industrial Estate Portlethen Aberdeenshire AB12 4YD
Storage of Hazardous Substances
-
APP/2025/1786 Granted
132kV Overhead Line From Glendye Wind Farm To Fetteresso Substation
Consultation under Section 37 of The Electricity Act 1989 for the Installation of 132KV Overhead Line and Associated Infrastructure