Planning application
Roemex Ltd Badentoy Crescent Badentoy Industrial Estate Portlethen Aberdeenshire AB12 4YD
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Storage of Hazardous Substances
As published by the council, reference APP/2024/2146
Application record
- Reference
- APP/2024/2146
- Type
- Hazardous Substances Application
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 23 Dec 2024
- Validated
- 3 Feb 2025
- Decided
- 3 Jun 2026
- Ward
- North Kincardine
- Parish
- Portlethen & District
- Decision by
- Delegated
- Postcode
- AB12 4YD
Site history
Applications at this address on the Aberdeenshire register
This site has had 2 applications since 2024: 1 approved, 0 refused.
-
APP/2024/0536 Withdrawn
Roemex Ltd Badentoy Crescent Badentoy Industrial Estate Portlethen Aberdeenshire AB12 4YD
Storage of Hazardous Substances
Timeline
Dates from the published record
-
23 Dec 2024
Received by Aberdeenshire
-
3 Feb 2025
Validated
Checked as complete and ready for consideration.
-
3 Jun 2026
Decision issued: Approved
-
1 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Aberdeenshire granted permission on 3 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Roemex Ltd Badentoy Crescent Badentoy Industrial Estate Portlethen Aberdeenshire AB12 4YD
Storage of Hazardous Substances
Withdrawn Other 10 docs -
Smith International (north Sea) Ltd Badentoy Avenue Badentoy Industrial Estate Portlethen Aberdeen Aberdeenshire AB12 4YB
Proposed Use of Building and Land for (Deposit Return Scheme) Counting Centre
Granted Lawful development 5 docs -
Baker Hughes Badentoy Crescent Badentoy Industrial Estate Portlethen Aberdeenshire
Erection of Nitrogen Tank on Existing Industrial Land
Granted Full applications 5 docs -
One Subsea Badentoy Avenue Badentoy Industrial Estate Portlethen Aberdeenshire AB12 4YB
Erection of Industrial Building (Retrospective)
Granted -
One Subsea Badentoy Avenue Badentoy Industrial Estate Portlethen AB12 4YB
Formation of Washbay
Granted Full applications 15 docs -
Windward Badentoy Limited Badentoy Avenue Badentoy Industrial Estate Portlethen Aberdeenshire AB12 4YB
Erection of Fence and Gate
Granted Full applications 22 docsSmall domestic
Other less common application types
In Aberdeenshire
-
APP/2026/1317 Granted
Mains Of Cowie Stonehaven
Consultation under Section 37 of the Electricity Act 1989 for Change in Pole Height from 8.53m to 14m to Support 11kV Overhead Line
-
APP/2026/1343 Awaiting decision
New Deer To Netherton Hub, Peterhead Tie-In
Consultation under Section 37 of The Electricity Act 1989 for the Installation of 400KV Overhead Lines, 18 Steel Lattice Towers, 2 Temporary Towers and Associated Infrastructure
-
APP/2026/0761 Granted
Glendronach Distillery Forgue Huntly AB54 6DB
Erection of Overhead Line (Retrospective)
-
APP/2025/1786 Granted
132kV Overhead Line From Glendye Wind Farm To Fetteresso Substation
Consultation under Section 37 of The Electricity Act 1989 for the Installation of 132KV Overhead Line and Associated Infrastructure
-
APP/2025/1555 Granted
Land Approximately 1.2 Km To The South Of A950 Longside Peterhead Aberdeenshire AB42 0LY
Consultation under Section 36 of the Electricity Act 1989 for the Installation of Battery Energy Storage System (BESS) with an Installed Capacity of up to 400MW and Associated Works