Planning application
Land East of Horton Road Horton Slough
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Variation (under Section 73a) of planning permission 17/03850/VAR without complying with Condition 38 (Cessation of extraction and infilling operations).
As published by the council, reference 26/00543/VAR
Application record
- Reference
- 26/00543/VAR
- Type
- Variation Under Reg 73
- Status
- Awaiting decision
- Received
- 2 Mar 2026
- Validated
- 2 Mar 2026
- Ward
- Datchet Horton And Wraysbury
- Parish
- Horton Parish
Site history
Applications at this address on the Windsor and Maidenhead register
This site has had 5 applications since 2022: 2 approved, 0 refused.
-
25/03113/NMA Granted
Land East of Horton Road Horton Slough
Non material amendments to planning permission 17/03850/VAR to amend the wording to Condition 12 (Scheme Of Restoration And Landscaping) and Condition 39 (Mineral Extraction And Infilling) and to reinstate Condition 40 (Removal of Plant, Machinery, Buildings And Structures) with an amendment to the wording.
-
23/01294/CONDIT Split decision
Land East of Horton Road Horton Slough
Details required by Condition 6 (LEMP), 10 (Dust Management Plan) and 17 (Complaints procedure) of Planning Permission 22/01492 for Continued use of approximately 12 hectares of land for a proposed inert waste recycling facility, including weighbridge, site offices, welfare facilities and machinery store and workshop; the retention of the raised bunds, existing planted trees and associated landscaping and the existing access; and the erection of a southern bund and associated landscaping.
-
23/00812/NMA Granted
Land East of Horton Road Horton Slough
Non-material amendments to planning permission 17/03850/VAR to revise conditions requiring the removal of raised screening bunds and the existing plant, machinery, buildings and structures (including hard surfacing constructed for any purpose) and related to restoration, landscaping and aftercare scheme.
-
22/01475/VAR Withdrawn
Land East of Horton Road Horton Slough
Variation (under Section 73) of conditions 12 (scheme of restoration and landscaping), 39 (mineral extraction and infilling) and 40 (linked to condition 13) of planning permission 17/03850/VAR for the variation of condition 40 (under Section 73) to allow for continued extraction, infilling and restoration of site for the extraction of sand and gravel and restoration to agricultural land using imported inert fill, creation of a site access road onto Horton Road, erection of a gravel processing plant, site offices and facilities, and formation of settlement ponds approved under (07/00590) (allowed on appeal).
Timeline
Dates from the published record
-
2 Mar 2026
Received by Windsor and Maidenhead
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Windsor and Maidenhead took a median of 55 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
28 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Windsor and Maidenhead for determination, against a statutory target of eight weeks. Over the last year Windsor and Maidenhead decided amendment applications in a median of 46 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land East of Horton Road Horton Slough
Non material amendments to planning permission 17/03850/VAR to amend the wording to Condition 12 (Scheme Of Restoration And Landscaping) and Condition 39 (Mineral Extraction And Infilling) and to reinstate Condition 40 (Removal of Plant, Machinery, Buildings And Structures) with an amendment to the wording.
Granted Amendments 5 docs -
Land East of Horton Road Horton Slough
Variation (under Section 73) of conditions 12 (scheme of restoration and landscaping), 39 (mineral extraction and infilling) and 40 (linked to condition 13) of planning permission 17/03850/VAR for the variation of condition 40 (under Section 73) to allow for continued extraction, infilling and restoration of site for the extraction of sand and gravel and restoration to agricultural land using imported inert fill, creation of a site access road onto Horton Road, erection of a gravel processing plant, site offices and facilities, and formation of settlement ponds approved under (07/00590) (allowed on appeal).
Withdrawn Amendments 30 docs -
Land East of Horton Road Horton Slough
Non-material amendments to planning permission 17/03850/VAR to revise conditions requiring the removal of raised screening bunds and the existing plant, machinery, buildings and structures (including hard surfacing constructed for any purpose) and related to restoration, landscaping and aftercare scheme.
Granted Amendments 9 docs -
Land Beneath Horton Road And Stanwell Road Horton Slough
71% historically approved · decision due ~13 Apr
Installation of underground and ground mounted structures to support electrical connection and communication cables with temporary construction compounds and associated infrastructure and works.
Awaiting decision Full applications 57 docs -
Horton Brook Quarry Horton Road Horton Slough
Screening Opinion from the Council under Regulation 6 (1) of the Environmental Impact Assessment Regulations 2017 ("the EIA Regulations"), to confirm whether or not there is a requirement for an Environmental Impact Assessment ("EIA") in respect of the proposed use of land at Horton Quarry for a permanent waste and recycling facility processing only inert wastes.
Granted Outline 14 docs -
Land East of Horton Road Horton Slough
Details required by Condition 6 (LEMP), 10 (Dust Management Plan) and 17 (Complaints procedure) of Planning Permission 22/01492 for Continued use of approximately 12 hectares of land for a proposed inert waste recycling facility, including weighbridge, site offices, welfare facilities and machinery store and workshop; the retention of the raised bunds, existing planted trees and associated landscaping and the existing access; and the erection of a southern bund and associated landscaping.
Split decision Conditions Trees 10 docs
Other amendment applications
In Windsor and Maidenhead
-
26/01860/VAR Refused
72 - 72B High Street Sunninghill Ascot
Variation (under Section 73A) of planning permission 22/01291/FULL without complying with Condition 8 (Electric Vehicle Charging Point).
-
26/02252/VAR Awaiting decision
18 Forlease Drive Maidenhead SL6 1UD
Variation (under Section 73a) of Condition 4 to substitute those plans approved under 26/00518/FULL for the Garage conversion and single storey front/side extension with amended plans.
-
25/03312/VAR Granted
Land South of Bray Lake Windsor Road Maidenhead
Variation (under Section 73) of Condition 29 (Approved Plans) to substitute those plans approved under 22/01791/OUT for an outline application for access, appearance, layout and scale only to be considered at this stage with all other matters to be reserved for the construction of x99 dwellings with associated vehicular and pedestrian access, car parking, drainage works and open space with amended plans.
-
26/02137/NMA Refused
Woodhaven 8 Dawnay Close Ascot SL5 7PQ
Non material amendments to planning permission 23/02519/FULL as per supporting document.
-
26/01975/VAR Withdrawn
2 And LAnd At 2 Westfield Road Maidenhead SL6 5AU
Variation (under Section 73) of planning permission 25/01013/FULL to remove Condition 15 (BNG).