Planning application
Land East of Horton Road Horton Slough
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Non-material amendments to planning permission 17/03850/VAR to revise conditions requiring the removal of raised screening bunds and the existing plant, machinery, buildings and structures (including hard surfacing constructed for any purpose) and related to restoration, landscaping and aftercare scheme.
As published by the council, reference 23/00812/NMA
Application record
- Reference
- 23/00812/NMA
- Type
- Non-material Amendment
- Status
- Decided
- Decision
- Application Permitted
- Received
- 30 Mar 2023
- Validated
- 30 Mar 2023
- Decided
- 12 May 2023
- Ward
- Datchet Horton And Wraysbury
- Parish
- Horton Parish
- Decision by
- Delegated
Site history
Applications at this address on the Windsor and Maidenhead register
This site has had 5 applications since 2022: 2 approved, 0 refused.
-
26/00543/VAR Awaiting decision
Land East of Horton Road Horton Slough
Variation (under Section 73a) of planning permission 17/03850/VAR without complying with Condition 38 (Cessation of extraction and infilling operations).
-
25/03113/NMA Granted
Land East of Horton Road Horton Slough
Non material amendments to planning permission 17/03850/VAR to amend the wording to Condition 12 (Scheme Of Restoration And Landscaping) and Condition 39 (Mineral Extraction And Infilling) and to reinstate Condition 40 (Removal of Plant, Machinery, Buildings And Structures) with an amendment to the wording.
-
23/01294/CONDIT Split decision
Land East of Horton Road Horton Slough
Details required by Condition 6 (LEMP), 10 (Dust Management Plan) and 17 (Complaints procedure) of Planning Permission 22/01492 for Continued use of approximately 12 hectares of land for a proposed inert waste recycling facility, including weighbridge, site offices, welfare facilities and machinery store and workshop; the retention of the raised bunds, existing planted trees and associated landscaping and the existing access; and the erection of a southern bund and associated landscaping.
-
22/01475/VAR Withdrawn
Land East of Horton Road Horton Slough
Variation (under Section 73) of conditions 12 (scheme of restoration and landscaping), 39 (mineral extraction and infilling) and 40 (linked to condition 13) of planning permission 17/03850/VAR for the variation of condition 40 (under Section 73) to allow for continued extraction, infilling and restoration of site for the extraction of sand and gravel and restoration to agricultural land using imported inert fill, creation of a site access road onto Horton Road, erection of a gravel processing plant, site offices and facilities, and formation of settlement ponds approved under (07/00590) (allowed on appeal).
Timeline
Dates from the published record
-
30 Mar 2023
Received by Windsor and Maidenhead
-
12 May 2023
Decision issued: Application Permitted
-
12 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Windsor and Maidenhead granted permission on 12 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land East of Horton Road Horton Slough
71% historically approved · decision due ~27 Apr
Variation (under Section 73a) of planning permission 17/03850/VAR without complying with Condition 38 (Cessation of extraction and infilling operations).
Awaiting decision Amendments 28 docs -
Land East of Horton Road Horton Slough
Non material amendments to planning permission 17/03850/VAR to amend the wording to Condition 12 (Scheme Of Restoration And Landscaping) and Condition 39 (Mineral Extraction And Infilling) and to reinstate Condition 40 (Removal of Plant, Machinery, Buildings And Structures) with an amendment to the wording.
Granted Amendments 5 docs -
Land East of Horton Road Horton Slough
Variation (under Section 73) of conditions 12 (scheme of restoration and landscaping), 39 (mineral extraction and infilling) and 40 (linked to condition 13) of planning permission 17/03850/VAR for the variation of condition 40 (under Section 73) to allow for continued extraction, infilling and restoration of site for the extraction of sand and gravel and restoration to agricultural land using imported inert fill, creation of a site access road onto Horton Road, erection of a gravel processing plant, site offices and facilities, and formation of settlement ponds approved under (07/00590) (allowed on appeal).
Withdrawn Amendments 30 docs -
Land Beneath Horton Road And Stanwell Road Horton Slough
71% historically approved · decision due ~13 Apr
Installation of underground and ground mounted structures to support electrical connection and communication cables with temporary construction compounds and associated infrastructure and works.
Awaiting decision Full applications 57 docs -
Horton Brook Quarry Horton Road Horton Slough
Screening Opinion from the Council under Regulation 6 (1) of the Environmental Impact Assessment Regulations 2017 ("the EIA Regulations"), to confirm whether or not there is a requirement for an Environmental Impact Assessment ("EIA") in respect of the proposed use of land at Horton Quarry for a permanent waste and recycling facility processing only inert wastes.
Granted Outline 14 docs -
Land East of Horton Road Horton Slough
Details required by Condition 6 (LEMP), 10 (Dust Management Plan) and 17 (Complaints procedure) of Planning Permission 22/01492 for Continued use of approximately 12 hectares of land for a proposed inert waste recycling facility, including weighbridge, site offices, welfare facilities and machinery store and workshop; the retention of the raised bunds, existing planted trees and associated landscaping and the existing access; and the erection of a southern bund and associated landscaping.
Split decision Conditions Trees 10 docs
Other amendment applications
In Windsor and Maidenhead
-
26/01860/VAR Refused
72 - 72B High Street Sunninghill Ascot
Variation (under Section 73A) of planning permission 22/01291/FULL without complying with Condition 8 (Electric Vehicle Charging Point).
-
26/02252/VAR Awaiting decision
18 Forlease Drive Maidenhead SL6 1UD
Variation (under Section 73a) of Condition 4 to substitute those plans approved under 26/00518/FULL for the Garage conversion and single storey front/side extension with amended plans.
-
25/03312/VAR Granted
Land South of Bray Lake Windsor Road Maidenhead
Variation (under Section 73) of Condition 29 (Approved Plans) to substitute those plans approved under 22/01791/OUT for an outline application for access, appearance, layout and scale only to be considered at this stage with all other matters to be reserved for the construction of x99 dwellings with associated vehicular and pedestrian access, car parking, drainage works and open space with amended plans.
-
26/02137/NMA Refused
Woodhaven 8 Dawnay Close Ascot SL5 7PQ
Non material amendments to planning permission 23/02519/FULL as per supporting document.
-
26/01975/VAR Withdrawn
2 And LAnd At 2 Westfield Road Maidenhead SL6 5AU
Variation (under Section 73) of planning permission 25/01013/FULL to remove Condition 15 (BNG).