Planning application
26/00177/PNADD7
Frank Parkinson Building Sparsholt College Hillside Road Sparsholt Hampshire
Proposal
Replacement Roof
As published by the council, reference 26/00177/PNADD7
Timeline
Dates from the published record
-
29 Jan 2026
Received by Winchester
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Winchester for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
24/01566/DIC Granted
Sparsholt College Westley Lane Sparsholt Winchester Hampshire SO21 2NF
Original application: 24/00248/FUL Condition: 4 (external lighting).
-
26/00354/HOU Awaiting decision
2 Westley Cottages Hillside Road Sparsholt Winchester Hampshire SO21 2NE
Proposed Extension & Alterations
-
21/00584/HOU Granted
1 Westley Cottages Hillside Road Sparsholt SO21 2NE
For the construction of an Oak framed garage with a room above
Other outline applications
In Winchester
-
26/01193/SCREEN Decided
Land To The West Of Courtenay Road Winchester Hampshire
EIA Screening Opinion in relation to the proposed development comprises the erection of up to 158 dwellings (including affordable housing provision), landscaping, parking, public open space, improvement of existing access, drainage and all other necessary on site infrastructure, in accordance with Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017
-
26/00824/SCOPE Decided
Central Winchester Development Tanner Street Winchester Hampshire
This EIA Scoping Report requests a Scoping Opinion of the LPA (in this instance, Winchester City Council) pursuant to Regulation 15 of the EIA Regulations. The EIA Scoping Report suggests a comprehensive scope of work based on the experience of the assembled team of specialists and knowledge of the site. The LPA and consultees are invited to consider the contents of this EIA Scoping Report and comment accordingly within the five-week period prescribed by the EIA Regulations.
-
26/01373/PNADD6 Awaiting decision
The Hollies Curdridge Lane Curdridge Southampton Hampshire SO32 2BH
For the provision of an additional floor to an existing single-storey dwelling resulting in a building with a maximum height of 9m
-
26/00908/PNSOL Granted
Winchester Sport And Leisure Park Bar End Road Winchester Hampshire SO23 9NR
To install a 190.08kWp Solar PV panels on the roof of on Winchester Sports & Leisure Park, consisting of 396 panels.
-
26/00909/PNSOL Granted
Chesil Lodge Chesil Street Winchester Hampshire SO23 0AH
To install a 51.45kWp Solar PV panels on the roof of on Chesil Lodge, consisting of 98 panels.