To install a 51.45kWp Solar PV panels on the roof of on Chesil Lodge, consisting of 98 panels.
As published by the council, reference 26/00909/PNSOL
Timeline
Dates from the published record
-
29 Apr 2026
Received by Winchester
-
30 Apr 2026
Validated
Checked as complete and ready for consideration.
-
16 Jun 2026
Decision issued: Prior Approval Not Required
-
26 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
26/01234/FUL Awaiting decision
Chesil Lodge Chesil Street Winchester Hampshire SO23 0AH
Installation of opaque glazed enamel back fire-rated spandrel panels to all bottom sash windows situated on the south, east and west elevations. The proposed works are intended to reduce solar gain and improve comfort within the building while matching the existing window arrangement and overall aesthetic.
-
26/01118/NMA Decided
Chesil Lodge Chesil Street Winchester Hampshire SO23 0AH
Amendment to 14/02534/FUL to replace existing glazed panes below transoms in residential units with satin opaque glass panels. Replace fixed upper panels with matching opening units (some of the upper panels are already openable)
-
21/02060/DIC Granted
5 Eastcliffe East Hill Winchester SO23 0JB
Discharge of condition 4 (joinery details) of planning application 18/01427/HOU
-
21/00785/TPO Granted
Maple House St Giles Close Winchester SO23 0JJ
G2 - 2No. semi mature Ash Tree, to reduce the lower over extended Eastern lateral limbs growing towards the rear of the house by approximately 1 to 1.5 meters to suitable secondary growth points (as indicated in the attached photo) and remove any major deadwood (diameter >50mm) . To contain the growth management.
-
26/00432/TPO Granted
Kingsland House 54 Chesil Street Winchester Hampshire SO23 0HX
T1 Sycamore - Reduce sides only of Sycamore by up to 2m (to be governed by suitable pruning points) to maintain size in relation to adjacent buildings. T2 Sycamore - Re-pollard top and reduce extended limbs over river to mitigate future failure. T3 Mulberry - Reduce partially heaved tree by 1.5m to mitigate future failure.
-
21/02675/DIC Granted
42 Chesil Street Winchester SO23 0HX
Discharge of conditions 3 and 4 of planning application 21/00127/LIS
Other outline applications
In Winchester
-
26/01193/SCREEN Decided
Land To The West Of Courtenay Road Winchester Hampshire
EIA Screening Opinion in relation to the proposed development comprises the erection of up to 158 dwellings (including affordable housing provision), landscaping, parking, public open space, improvement of existing access, drainage and all other necessary on site infrastructure, in accordance with Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017
-
26/00824/SCOPE Decided
Central Winchester Development Tanner Street Winchester Hampshire
This EIA Scoping Report requests a Scoping Opinion of the LPA (in this instance, Winchester City Council) pursuant to Regulation 15 of the EIA Regulations. The EIA Scoping Report suggests a comprehensive scope of work based on the experience of the assembled team of specialists and knowledge of the site. The LPA and consultees are invited to consider the contents of this EIA Scoping Report and comment accordingly within the five-week period prescribed by the EIA Regulations.
-
26/01373/PNADD6 Awaiting decision
The Hollies Curdridge Lane Curdridge Southampton Hampshire SO32 2BH
For the provision of an additional floor to an existing single-storey dwelling resulting in a building with a maximum height of 9m
-
26/00908/PNSOL Granted
Winchester Sport And Leisure Park Bar End Road Winchester Hampshire SO23 9NR
To install a 190.08kWp Solar PV panels on the roof of on Winchester Sports & Leisure Park, consisting of 396 panels.
-
26/00686/OUT Refused
Land Adjacent Lodge Green Whiteley Lane Titchfield Hampshire
Erection of 2 detached self build houses with detached garages, parking, turning and landscaping.