Planning application
Norlands Otterbourne Road Compton Winchester Hampshire SO21 2RT
Works: Trees Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
1.The development hereby approved will be constructed in accordance with the following plans:-Site Plan- Received 14.10.2024-Summer House- Dwg No. 008E- Received 13.08.2025 2.Within 2 months of the date of this permission, details of a recessive external colour of the outbuilding hereby permitted shall be submitted to and approved in writing by the Local Planning Authority. The works shall then be implemented in accordance with the approved materials within 3 months of the date of their approval and thereafter maintained in that condition. Cream Render 3.A biodiversity mitigation and enhancement plan shall be submitted to and approved in by the Local Planning Authority within 3 months of the decision date of the planning application. The scheme shall be carried out in accordance with the approved details and within 6 months of the decision date of the planning application, and shall thereafter be maintained as specified within the approved scheme. The only trees nearby are NON-indegenous fir trees for the use of screening the M3 from the dwellings Checklist attached 4.The outbuilding hereby permitted shall not be occupied at any time other than for purposes ancillary to the residential use of the existing dwelling. The site shall only be used as a single residential unit and shall not be subdivided, separated or altered in any way so as to create two or more separate residential units. Agreed and confirmed 5.Within 2 months of the date of this permission, details of the external lighting of the outbuilding hereby approved, including the positioning of lighting on the building, level of luminance, direction of lighting and details of any motion sensors or timers, shall be submitted to and approved in writing by the Local Planning Authority. The lighting shall then be implemented in accordance with the approved details within 3 months of the date of the approval of these details and thereafter maintained in accordance with these approved details. No other external
As published by the council, reference 25/02377/DIC
Application record
- Reference
- 25/02377/DIC
- Type
- Details in Compliance
- Status
- Current
- Received
- 24 Nov 2025
- Validated
- 24 Nov 2025
- Ward
- BADGER FARM AND OLIVERS BATTERY WARD
- Parish
- Compton And Shawford
- Postcode
- SO21 2RT
Site history
Applications at this address on the Winchester register
This site has had 2 applications since 2025: 1 approved, 0 refused.
-
26/00409/HOU Granted
Norlands Otterbourne Road Compton Winchester Hampshire SO21 2RT
First floor flat roof side extension to the south elevation
Timeline
Dates from the published record
-
24 Nov 2025
Received by Winchester
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 19 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Winchester took a median of 58 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Winchester for determination, against a statutory target of eight weeks. Over the last year Winchester decided condition discharge and variation applications in a median of 47 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Norlands Otterbourne Road Compton Winchester Hampshire SO21 2RT
First floor flat roof side extension to the south elevation
Granted Householder Extension 14 docsDomestic -
Castello Otterbourne Road Shawford Winchester Hampshire SO21 2DG
2x over mature macvacapa's - Remove both trees to ground level. Northerly tree has a lightning strike from top to base. Storm damaged canopy in both trees. Poor unions with extensive included unions. Utility lines through canopy to North. Extensive major deadwood, close proximity to main road to west, close to properties to east.
Refused Trees 14 docs -
Solis House Otterbourne Road Compton SO21 2DG
T1 Conifer crown lift to 5.5m. Localised crown reduction of 1m to clear roof of annex building with no pruning wound greater than 75mm. T2 Ash, Pollard as managed retreat to approximately 3.5m due to presence of severe Ash die back within the crown. See original application.
Granted Trees 3 docs -
Two Bridges 2 Otterbourne Road Compton SO21 2DG
Single storey pitched/flat roof extension to the side of the building to create kitchen, utility room and family snug room.
Granted Householder Extension 8 docsSmall domestic -
White Gables Otterbourne Road Compton SO21 2RT
Single Storey Side Extension, Two Storey Side & Front Extension following demolition of existing garage, and detached double car barn - revised scheme to previously approved 20/01042/HOU
Granted Householder Extension Demolition 6 docsSmall domestic -
York House Fairfield Road Shawford Winchester Hampshire SO21 2DA
Variation of condition for application 18/01304/HOU (Replacement of hedge to front boundary)
Granted Full applications 8 docs
Other condition discharge and variation applications
In Winchester
-
26/00171/DIC Granted
Shedfield House Dairy Sandy Lane Shedfield Hampshire
Discharge of conditions 4 (drainage) and 5A (Partial discharge of archaeology) of planning application 25/01056/FUL
-
26/01523/S106 Granted
Land At Southwick Road And School Road Wickham Hampshire
Discharge Planning Obligation 1.2 (Open Space Land Scheme) of Schedule 3 of the S106 (dated 17/10/2025) for planning application ref: 24/02803/FUL
-
26/01689/DIC Awaiting decision
Studland House Deane Down Drove Littleton Winchester Hampshire SO22 6PP
Discharge condition 5 (Biodiversity Enhancement and Mitigation Plan) for application 26/00277/HOU
-
26/00775/S106 Granted
Berewood Phase 1 Hambledon Road Denmead Hampshire
Compliance to S106 clauses 7.2.1, 7.2.4, 7.2.5, 7.2.7 in relation to 10/02862/OUT parcel M1
-
26/00779/S106 Granted
Berewood Phase 1 Hambledon Road Denmead Hampshire
Compliance to S106 clauses 7.2.1, 7.2.4, 7.2.5, 7.2.7 in relation to 10/02862/OUT parcel M3