25/02086/SCREEN

Western Court Bishops Sutton Road Bishops Sutton Alresford Hampshire SO24 0AA

Decided Winchester EIA Screening Opinion

Proposal

The proposal is for the construction, operation, maintenance and decommissioning of a ground mounted solar farm with an export capacity of circa 5.4MW, complete with landscaping, associated infrastructure, and the provision of access and operational access tracks.

As published by the council, reference 25/02086/SCREEN

Timeline

Dates from the published record

  1. 10 Oct 2025

    Received by Winchester

  2. 22 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 13 Nov 2025

    Decision issued: EIA Not Required

  4. 26 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 26/00707/FUL Awaiting decision

    Western Court Bishops Sutton Road Bishops Sutton Alresford Hampshire SO24 0AA

    Construction, operation, maintenance, and decommissioning of aground-mounted solar farm with a maximum grid export capacity of up to 5.4 MW complete with landscaping, associated infrastructure, and access provision.

    31 Mar 2026 0m away Full applications
  • 26/00839/LDP Granted

    Alresford Substation Site Bishops Sutton Road Bishops Sutton Hampshire

    The application relates to the installation of 2 no. replacement transformers and the installation of a new 33kV switch-room building adjacent to the existing. Additional works include modification to the existing fencing to extend the current boundaries of the site to the north, within SSEN ownership, these works will remain entirely within SSEN?s ownership, and the site?s operational boundary.

    22 Apr 2026 374m away Lawful development
  • 26/00366/LDP Granted

    Land Lying North Of Whitehill Lane Bishops Sutton SO24 9EJ

    Certificate of Lawful Development for Temporary Works Compound to support essential works

    23 Feb 2026 428m away Lawful development

In Winchester

  • 26/01193/SCREEN Decided

    Land To The West Of Courtenay Road Winchester Hampshire

    EIA Screening Opinion in relation to the proposed development comprises the erection of up to 158 dwellings (including affordable housing provision), landscaping, parking, public open space, improvement of existing access, drainage and all other necessary on site infrastructure, in accordance with Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017

    4 Jun 2026 Outline
  • 26/00824/SCOPE Decided

    Central Winchester Development Tanner Street Winchester Hampshire

    This EIA Scoping Report requests a Scoping Opinion of the LPA (in this instance, Winchester City Council) pursuant to Regulation 15 of the EIA Regulations. The EIA Scoping Report suggests a comprehensive scope of work based on the experience of the assembled team of specialists and knowledge of the site. The LPA and consultees are invited to consider the contents of this EIA Scoping Report and comment accordingly within the five-week period prescribed by the EIA Regulations.

    21 Apr 2026 Outline
  • 26/01373/PNADD6 Awaiting decision

    The Hollies Curdridge Lane Curdridge Southampton Hampshire SO32 2BH

    For the provision of an additional floor to an existing single-storey dwelling resulting in a building with a maximum height of 9m

    2 Jul 2026 Outline
  • 26/00908/PNSOL Granted

    Winchester Sport And Leisure Park Bar End Road Winchester Hampshire SO23 9NR

    To install a 190.08kWp Solar PV panels on the roof of on Winchester Sports & Leisure Park, consisting of 396 panels.

    29 Apr 2026 Outline
  • 26/00909/PNSOL Granted

    Chesil Lodge Chesil Street Winchester Hampshire SO23 0AH

    To install a 51.45kWp Solar PV panels on the roof of on Chesil Lodge, consisting of 98 panels.

    29 Apr 2026 Outline