Planning application

26/00366/LDP

Land Lying North Of Whitehill Lane Bishops Sutton SO24 9EJ

Granted Winchester Lawful Development Certificate-Proposed

Proposal

Certificate of Lawful Development for Temporary Works Compound to support essential works

As published by the council, reference 26/00366/LDP

Timeline

Dates from the published record

  1. 23 Feb 2026

    Received by Winchester

  2. 19 May 2026

    Decision issued: Application Permitted

  3. 26 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About lawful development applications

How this application type works

A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.

More on lawful development applications in our guide

Nearby applications

Within 500 metres

  • 26/00839/LDP Granted

    Alresford Substation Site Bishops Sutton Road Bishops Sutton Hampshire

    The application relates to the installation of 2 no. replacement transformers and the installation of a new 33kV switch-room building adjacent to the existing. Additional works include modification to the existing fencing to extend the current boundaries of the site to the north, within SSEN ownership, these works will remain entirely within SSEN?s ownership, and the site?s operational boundary.

    22 Apr 2026 147m away Lawful development
  • 25/02086/SCREEN Decided

    Western Court Bishops Sutton Road Bishops Sutton Alresford Hampshire SO24 0AA

    The proposal is for the construction, operation, maintenance and decommissioning of a ground mounted solar farm with an export capacity of circa 5.4MW, complete with landscaping, associated infrastructure, and the provision of access and operational access tracks.

    10 Oct 2025 428m away Outline
  • 26/00707/FUL Awaiting decision

    Western Court Bishops Sutton Road Bishops Sutton Alresford Hampshire SO24 0AA

    Construction, operation, maintenance, and decommissioning of aground-mounted solar farm with a maximum grid export capacity of up to 5.4 MW complete with landscaping, associated infrastructure, and access provision.

    31 Mar 2026 428m away Full applications
  • 26/00800/VAR Granted

    The Long Barn The Old Sheep Fair Bishops Sutton Road Alresford Hampshire SO24 9EJ

    Application Reference Number: 19/00619/FUL Date of Decision: 18/07/2019 Condition Number(s): 4/ (Hours of Opening) 2/h/ Space for workshops or events limited to no more than 15 in any calendar year. (See Planning Statement)

    16 Apr 2026 456m away Amendments

In Winchester

  • 26/01101/LDP Granted

    Beriton Heath Road Soberton Southampton Hampshire SO32 3QH

    Confirmation that the use of the land and buildings for agricultural purposes is lawful

    27 May 2026 Lawful development
  • 26/01488/LDP Awaiting decision

    Hampshire Hills Sutton Wood Lane Bighton Alresford Hampshire SO24 9SG

    A Certificate of Lawfulness of Proposed Use or Development (known as an LDC or CLOPUD), under Section 192 (S192) of the Town and Country Planning Act 1990 (the TCPA, as amended), for ?the proposed stationing of a single static caravan in place of a single permanently stationed touring caravan for year-round holiday purposes? at Hampshire Hills Park, as outlined in red on the accompanying Site Location Plan.

    20 Jul 2026 Lawful development
  • 26/01486/LDP Awaiting decision

    Broom Copse Farm Spiers Lane New Alresford Alresford Hampshire SO24 9TY

    a 4m rear and 2x side extensions.

    20 Jul 2026 Lawful development
  • 26/01494/LDP Awaiting decision

    3 Vokes Cottages Down Farm Lane Headbourne Worthy Winchester Hampshire SO23 7LA

    Amalgamation of two dwellings: the proposal seeks to confirm that this does not constitute development.

    20 Jul 2026 Lawful development
  • 26/00813/LDP Refused

    17 Back Street Winchester Hampshire SO23 9SB

    Erection of wooden gazebo.

    20 Apr 2026 Lawful development