Skip to content
PlanIndex Get alerts
Menu

Planning application

Mast Rear Of Bridge Farm Industries Botley Road Curbridge Hampshire

Granted Winchester 22/00518/DIC Details in Compliance

Works: Trees

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

3: Prior to the commencement of development, a Construction Management Plan must be submitted to and approved in writing by the Local Planning Authority. The Plan must include: - Measures to protect the surrounding Barns Farm SINC. - Measures to protect the surrounding trees and landscaping including protective fencing and appointment of supervision. 4: No development shall take place until details of landscape works have been submitted to and approved in writing by the Local Planning Authority and these works shall be carried out as approved within the first planting season following the substantial completion of the development or as otherwise agreed in writing by the Local Planning Authority. These details shall include the following: - written specifications and schedules of trees and plants, noting species, planting sizes and proposed numbers/densities where appropriate. - additional landscaping on the northern boundary of the site adjacent to the footpaths. - implementation programme. 05 The colour of the mast up to the level of the tree height must be RAL 6009 The remainder of the mast structure must be light grey.

As published by the council, reference 22/00518/DIC

Application record

Reference
22/00518/DIC
Type
Details in Compliance
Status
Decided
Decision
Granted As published: Application Permitted
Received
7 Mar 2022
Validated
7 Mar 2022
Decided
25 Mar 2022
Ward
WHITELEY AND SHEDFIELD WARD
Parish
Curdridge PC

Site history

Applications at this address on the Winchester register

This site has had 2 applications since 2021: 2 approved, 0 refused.

  • 21/01799/FUL Granted

    Mast Rear Of Bridge Farm Industries Botley Road Curbridge Hampshire

    Proposed EE Ltd telecommunications mast - Comprising of: The installation of 1No. 27.5m high Swann 1S lattice tower with 6No. antennas, 2No. 0.6m dishes, 3No. ground-based equipment cabinets and ancillary development thereto. All located within a 1.8m chain-link fence on an 8mx6m compound. Additional installation of planting scheme

    Decided 16 Nov 2021 Full applications

Timeline

Dates from the published record

  1. 7 Mar 2022

    Received by Winchester

  2. 25 Mar 2022

    Decision issued: Application Permitted

  3. 1 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Harlequin Group Ltd Agent, registered in Birmingham

Liquidation · incorporated 1993 · Birmingham

274 applications on PlanIndex · across 57 councils · 63% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Winchester granted permission on 25 March 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Winchester

  • 26/01788/DIC Awaiting decision

    Land East Of Darnel Road Waterlooville Hampshire

    Discharge of conditions 7 (Site plan and access visibility splays), 8 (Drainage strategy and catchment layout), 9 (Construction Traffic Management Plan), 11 (Employment and skills plan), 13 (Proposed materials), 25 (Proposed On-Street Parking Control Plan), and 27 (Site sections and Topographic surveys) for application 21/01005/FUL

    Received 27 Aug, published by the council 29 Sep 2026 Conditions
  • 26/00171/DIC Granted

    Shedfield House Dairy Sandy Lane Shedfield Hampshire

    Discharge of conditions 4 (drainage) and 5A (Partial discharge of archaeology) of planning application 25/01056/FUL

    Received 29 Jan, published by the council 26 Jul 2026 Conditions
  • 26/01730/DIC Awaiting decision

    Sutton Scotney Services Southbound A34 Sutton Scotney Winchester Hampshire SO21 3JY

    Discharge Condition 3 (External Sample Details), 4 (Construction Management Plan), 8 (Details of Chemical and Petrol Storage), 9 (Surface water disposal scheme), 10 (Foul water disposal scheme) for application 26/00072/FUL

    Received 20 Aug, published by the council 27 Aug 2026 Conditions
  • 26/01707/DIC Awaiting decision

    Hangar Nurseries Thompsons Lane Owslebury Winchester Hampshire SO21 1JH

    Discharge conditions 5 (Biodiversity gain plan), 6 (Habitat Management and Monitoring Plan), 10 (details of biodiversity enhancement measures) and 12 (Details of surface water drainage measures) for application 26/00036/FUL

    Received 18 Aug, published by the council 26 Aug 2026 Conditions
  • 26/01709/DIC Awaiting decision

    The Happy Farm Winchester Road Waltham Chase Southampton Hampshire SO32 2LL

    Discharge conditions 3 (Materials), 4 (Consult Southern Water), 6 (Construction Environmental Management Plan), 8 (Protective Measures), 11 (Supervision of Construction Activity) and 16 (Flood Resilience and Resistance Strategy) for applications 25/02530/FUL

    Received 18 Aug, published by the council 1 Sep 2026 Conditions