Installation of a new 10kVA generator on new concrete foundation. Power duct to be installed from source to generator. Wide cable trunking to be installed on concrete base. AMF panel to be installed on the new pole fixed to cabinet base. PSU cabinet to be
As published by the council, reference PL/2026/04965
Application record
- Reference
- PL/2026/04965
- Type
- Prior notification: Development by telecoms operators
- Status
- Under Consultation
- Received
- 7 Aug 2026
- Validated
- 7 Aug 2026
- Ward
- By Brook ED
- Parish
- Grittleton CP
- Postcode
- SN14 7NF
Comment by 11 September 2026
The council is taking comments on this application until then. Comments go to Wiltshire through their own planning portal.
Timeline
Dates from the published record
-
7 Aug 2026
Received by Wiltshire
-
12 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Wiltshire took a median of 49 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Wiltshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About telecoms applications
How this application type works
Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.
Nearby applications
Within 500 metres
-
SITE 186 - LAND ADJACENT TO FOSSE GATE, LITTLETON DREW, CHIPPENHAM, SN14 7NE
Sycamore - Side prune and selective branch removal by 1m
Granted Trees 3 docs
Other telecoms applications
In Wiltshire
-
PL/2026/05147 Awaiting decision
Westdown Bungalow, 7 Long Hollow, Edington, Westbury, BA13 4PE
Mole ploughing and HD drilling armored fibre optic cabling to enable connecting nearby properties with a full fibre broadband service.
-
PL/2026/04910 Awaiting decision
Castle Combe Racing Circuit, Castle Combe, Chippenham, Wiltshire, SN14 7EY
Installation of a permanent backup generator.
-
PL/2026/01341 Granted
Land at Midge Hall Nurseries, Royal Wootton Bassett, Swindon, SN4 8ER
The proposed works comprise the removal of existing 12m monopole supporting 3 no. antennas and the installation of a new 17.5m monopole supporting 3 no. antennas on an open headframe, 1 no 300mm transmission dish, 1 no. 600mm transmission dish and ancilla
-
PL/2026/00192 Granted
Land at Four Trees Field, off A4361, Uffcott, SN4 9NA
The upgrade of the existing telecommunications site, comprising the installation of a generator, the internal upgrades of the existing equipment cabinet within the existing fenced compound, and ancillary development thereto
-
PL/2025/09559 Granted
Existing base station, Land at Rushmore Farm, Tollard Royal, SP5 5PT
The upgrade of the existing telecommunications site, comprising the installation of a generator within the existing fenced compound, and ancillary development thereto.