Planning application
A/26/100672/MAJOR
Bakkavor Dobson Park Industrial Estate Dobson Park Way Ince Wigan WN2 2DX
Proposal
Partial demolition of sections of the existing single storey and two storey production areas to the northern and eastern elevations and inclusive of ancillary single storey buildings and structures to the building perimeter and site. Erection of new east gable façade, open canopy, and formation of an extended service yard. Erection of a single storey infill extension to the southwest corner, ground floor infill extension to the northwest corner with new access door openings and external open canopy to the west façade. Remodelling of the existing roof areas and formation of four new penthouse sections. Recladding of the production area roofs and perimeter walls. Installation of 12 raw material external silos, ancillary equipment, and plant containment to the southern building façade
As published by the council, reference A/26/100672/MAJOR
Timeline
Dates from the published record
-
25 Mar 2026
Received by Wigan
-
5 May 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Wigan for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
A/25/099980/FULL Awaiting decision
172 Manchester Road Ince Wigan WN2 2EA
Conversion of existing shops (Use Class E(a) to 3 two storey apartments (Use Class C3), with external alterations to fenestration and render thereto
-
A/26/100945/HH Awaiting decision
23 Dovenby Fold Ince Wigan WN2 2PS
Part single storey, part two storey extension to side following demolition of existing garage
-
A/25/099006/CON Awaiting decision
Land At The Former Enterprise House Wigan Enterprise Park Seaman Way Ince
Condition Discharge application to discharge condition No's : 4 (Affordable Housing), 12 Part 3 ( Remediation Verification), 15 (Travel Plan), 16 (Ecology Pack), 17 (External Lighting), 24 (Birds and Bats), 31 (Drainage Management), 36 (Crime Prevention Measures) in respect of previously approved application : A/23/95287/MAJOR
Other full applications applications
In Wigan
-
A/26/101032/FULL Granted
Leigh Market Hall Spinning Gate Leigh WN7 4PG
External alterations including new full height entrance following demolition of the existing porch entrance structure on Gas Street, replacement roof with PV panels and roof mounted plant and equipment; installation of replacement automated service yard shutter doors; new openings in external elevations to accommodate air vents / mechanical installations; replacement of existing gates / vehicle barrier; and provision of external cycle parking stands
-
A/26/100957/FULL Refused
36 Bryn Street Ince Wigan WN3 4RX
Change of use from a single dwellinghouse (Use Class C3) into a 6 bed, 6 person HMO (Use Class C4) with re-positioning of a first floor window to the side elevation
-
A/26/100483/FULL Withdrawn
Willoughby Farm Meadow Pit Lane Haigh Wigan WN2 1LQ
Change of use of agricultural building to storage use (Use Class B8) with external alterations (Retrospective)
-
A/26/100906/FULL Refused
30 Ellesmere Road Wigan WN5 9LA
Change of use from a 6 bed 6 person House in Multiple Occupation (Use Class C4) to a 7 Bed 7 person House in Multiple Occupation (sui generis)
-
A/26/100916/FULL Refused
199 Darlington Street East Wigan WN1 3EA
Change of use from a single dwellinghouse (Use Class C3) into a 5 bed, 5 person HMO (Use Class C4) and installation of cycle and bin stores together with external alterations to fenestration