Skip to content
PlanIndex Get alerts
Menu

Planning application

Bainbridge Electrical Beezon Head Beezon Road KENDAL LA9 6BW

Decided Westmorland and Furness 2026/1542/FPA Full Application

Works: Windows or glazing

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Change of use from storage and offices (Use Class B8) to an electrical and panel manufacturing facility and offices (Use Class B2). External alterations comprising the infilling of existing openings and the formation of new windows and door openings

As published by the council, reference 2026/1542/FPA

Application record

Reference
2026/1542/FPA
Type
Full Application
Status
Officer Consideration
Decision
Pending
Received
3 Aug 2026
Validated
6 Aug 2026
Ward
Kendal Nether
Parish
Kendal
Decision by
Delegated
Postcode
LA9 6BW

Timeline

Dates from the published record

  1. 3 Aug 2026

    Received by Westmorland and Furness

  2. 6 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 10 Aug 2026

    Added to PlanIndex

  4. 15 Aug 2026

    Status changed to Consultation Started

    Previously Valid.

  5. 31 Aug 2026

    Status changed to Officer Consideration

    Previously Consultation Started.

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Westmorland and Furness

  • 2026/0955/FPA Granted

    Town Head Farm Unthank Skelton PENRITH CA11 9TG

    Agricultural storage building.

    8 May 2026 Full applications
  • 2026/1271/FPA Granted

    Crayston Shap PENRITH CA10 2NU

    Change of use of field barn and attached buildings to create a dwellinghouse with associated operations.

    19 Jun 2026 Full applications
  • 2026/1067/FPA Granted

    Mount Pleasant Farm Brough KIRKBY STEPHEN CA17 4DX

    Proposed general purpose agricultural building to include use as a facility to winter cattle on disused agricultural hardstanding.

    22 May 2026 Full applications
  • 2026/1695/FPA Decided

    Kings Arms Hotel 7 Market Street Kirkby Lonsdale Carnforth LA6 2AU

    Removal of existing fresh air intake fan and grille from front ground-floor kitchen window, reinstatement of the timber window, and relocation of intake ducting through an existing low-level opening.

    27 Aug 2026 Full applications
  • 2026/1691/FPA Decided

    Former Duddon Valley Medical Practice Askew Gate Brow Kirkby-In-Furness LA17 7TE

    Change of use from GP surgery (Use Class E) to a dwellinghouse (Use Class C3) with associated alterations including new and altered window and door openings, a raised rear deck and steps, and landscaping works.

    27 Aug 2026 Full applications