Council hub · London
Westminster planning applications
Page 13 of 315, newest first. The Westminster hub carries the figures, decision times and common questions.
Applications
Page 13 of 315
-
26/05516/FULL Awaiting decision
17 Grosvenor Street London W1K 4QH
Variation of condition 1 of planning permission dated 2nd April 2026 (RN:25/09112/FULL) for the Installation of air source heat pump in modified plant enclosure; green roof and rooflights; modifications to front mansard profile and front elevation. Namely, omission of 3 rooflights over the 4th floor and addition of a dormer window at the 4th floor rear and addition of a mechanical vent and heat recovery unit at the rear of the central flat roof. (Application under section 73 of the Act)
-
26/05621/TDD Awaiting decision
62 Clifton Hill London NW8 0JT
1 x birch and 1 lilac: fell
-
26/05527/FULL Awaiting decision
29 Gloucester Place Mews London W1U 8BF
Refurbishment and reconfiguration of existing dwelling including, alterations to front and rear facade including replacement of garage door with window, installation of new railings, installation of rear rooflights, replacement/ re-positioning of windows and doors, new replacement roof and associated works.
-
26/05543/ADV Awaiting decision
56 Westbourne Grove London W2 5SH
Display of non illuminated fascia sign measuring 0.30m x 0.90m; vinyl on the window; a gold sun logo and hours of operation on the door; and a retractable awning with lettering.
-
26/05538/LBC Awaiting decision
2 Fitzhardinge Street London W1H 6EE
Internal upgrades and repairs. Replacement and relocation of WCs and kitchenettes, introduction of cycle store, showers and end of trip facilities, minor amendments to internal walls and door locations, localised external repair and redecorations and general thermal upgrades including double glazing and replacement plant. (Linked to 26/05537/FULL)
-
26/05537/FULL Awaiting decision
2 Fitzhardinge Street London W1H 6EE
Internal upgrades and repairs. Replacement and relocation of WCs and kitchenettes, introduction of cycle store, showers and end of trip facilities, minor amendments to internal walls and door locations, localised external repair and redecorations and general thermal upgrades including double glazing and replacement plant. (Linked to 26/05538/LBC)
-
26/05534/LBC Decided
Royal College Of Art Kensington Gore London SW7 2EU
Erection of temporary scaffolding, including loading gantry, protection fan, emergency stair, and hoist, to facilitate the RCA Together works at the RCA South Kensington Campus, and associated making good.
-
26/05518/ADFULL Decided
30 - 32 Mortimer Street London W1W 7RE
Details of samples of facing materials including glazing and elevations and roof plans annotated to show where the materials are to be located pursuant to Condition 3 of planning permission dated 24th April 2025 (RN:25/01023/FULL)
-
26/05521/ADV Awaiting decision
Savile Row London
Display of Christmas decorations lighting along the length of Savile Row for temporary period from 06 November 2026 until 06 November 2031.
-
26/05535/ADLBC Decided
14 Cunningham Place London NW8 8JT
Detail of paving to the front garden annotated and to including a photograph of the sample material; pursuant to condition5(ii) of listed Building consent dated 12th June 2026 (26/02615/LBC)
-
26/05539/FULL Awaiting decision
30 Carlton Hill London NW8 0JY
Erection of extension at lower ground floor level to rear, replacement ground floor rear extension and extension of terrace at ground floor level, creation of rear first floor terrace, formation of roof light to existing side extension ,replacement windows, installation PV panels at roof level, external wall insulation with render finish, external hard and soft landscaping works, installation of a ASHP and other associated works.
-
26/05519/LBC Decided
Lyric Theatre 29 Shaftesbury Avenue London W1D 7ES
Installation of a telecommunications cable within a Grade II listed building to provide fibre connectivity.
-
26/05533/LBC Awaiting decision
7 - 14 Coventry Street London W1D 7DH
Installation of external light fixtures and fittings to the Coventry Street and Rupert Street elevations, and associated works. (Linked with 26/05532/FULL)
-
26/05532/FULL Awaiting decision
7 - 14 Coventry Street London W1D 7DH
Installation of external light fixtures and fittings to the Coventry Street and Rupert Street elevations, and associated works. (Linked with 26/05533/LBC)
-
26/05536/ADLBC Awaiting decision
The Ritz Hotel 150 - 156 Piccadilly London W1J 9BR
Details of external metalwork including the gates and screens to the ground floor of the new Arlington Street façade pursuant to Condition 6 (II) of Listed Building Consent dated 12th March 2026 (RN25/07529/LBC)
-
26/05529/LBC Awaiting decision
Flat 1 91 York Street London W1H 4QE
The addition of two juliet balconies and french windows at rear ground floor level. (Linked to 26/05528/FULL)
-
26/05528/FULL Awaiting decision
Flat 1 91 York Street London W1H 4QE
The addition of two juliet balconies and french windows at rear ground floor level. (Linked to 26/05529/LBC)
-
26/05526/LBC Awaiting decision
14 - 20 Norfolk Square London W2 1RU
Replace existing dilapidated timber rooflights with Velux conservation rooflights. (Linked with 16 - 20 Norfolk Square London)
-
26/05525/FULL Awaiting decision
14 - 20 Norfolk Square London W2 1RU
Replace existing dilapidated timber rooflights with Velux conservation rooflights. (Linked with 26/05526/LBC)
-
26/05517/ADFULL Decided
30 - 32 Mortimer Street London W1W 7RE
Details of samples of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 20th February 2025 (RN:24/09057/FULL).
-
26/05513/ADFULL Decided
17 - 21 South Audley Street London W1K 2NY
Detailed drawings of the new glazed roof pursuant to condition 12 (B) of planning permission dated 30th April 2026 (RN:26/01377/FULL)
-
26/05619/ADLBC Decided
17 - 21 South Audley Street London W1K 2NY
Detailed drawings of the new glazed roof pursuant to condition 2 (B) of listed building consent dated 30th April 2026 (RN: 26/01378/LBC)
-
26/05524/LBC Awaiting decision
Holiday Villa Hotel 35 - 39 Leinster Gardens London W2 3AN
Internal refurbishment and reconfiguration comprising the selective removal and alteration of internal walls to facilitate the revised hotel layout; removal of later twentieth-century alterations; rationalisation of floor levels; replacement and reconfiguration of lift and secondary stair arrangements; retention, repair and restoration of surviving historic fabric, including original staircases, chimney breast features and basement vaults; reinstatement of front lightwells; associated structural works; and all other ancillary works in connection with the continued use of the property as a hotel (Class C1). (Linked with 26/05523/FULL)
-
26/05523/FULL Awaiting decision
Holiday Villa Hotel 35 - 39 Leinster Gardens London W2 3AN
External extensions and alterations to the existing hotel (Use Class C1) comprising of comprehensive restoration of the external elevations of the listed building, including the reinstatement of original lightwells; demolition of the existing rear extension and construction of a replacement rear extension; demolition and reconstruction of the roof to provide a new mansard roof; and alongside other associated works. (Linked with 26/05524/LBC)
-
26/05514/ADFULL Decided
48 Gloucester Place Mews London W1U 8BD
Details of amended design of carriage doors to the left-hand ground-floor opening; sash window with sidelights and infill beneath, to the right-hand ground-floor opening; upgrading of the existing front sash windows to accommodate double glazing (and methodology statement); conservation rooflights; and casement windows pursuant to Condition 5 of planning permission dated 24 July 2026 (26/02870/FULL).
-
26/05510/ADFULL Decided
Paddington Green Police Station 4 Harrow Road London W2 1XJ
Details of external windows, communal entrances, duplex entrances, doors, screen, louvres and balustrading; window reveals, frames, cills, headers, colonnades and soffits; shop fronts, entrances and openings; balconies and communal terraces; and louvred gates pursuant to condition 19 (parts c,d,e,h, and i) of planning permission dated 30 April 2025 (RN: 24/06376/FULL).
-
26/05506/FULL Awaiting decision
British Broadcasting Corporation Delaware Road London W9 2LG
Variation of condition 1 of planning permission dated 12 February 2015 (RN:24/08378/FULL) for the Retention, partial demolition and alteration of the existing building for use as film and music studios (continued Class E use). Works include a partial basement excavation, replacement of the existing roof, installation of new plant and external amenity spaces to the rear, façade and access alterations, highway works and all other works associated with the development. Internal works to include the restoration and alteration of studios MV1-3, removal and alteration of roof trusses, construction of a new studio space and entrance lobby, and removal of studios MV4-7, in order to construct new studio, editing, staff welfare, plant, and office spaces. Namely, alterations to the layout and approach to Studio MV1 to retain more trusses and the original ceiling height, alterations to the approach to the original trusses along the second floor of the building, with all original trusses now retained or adapted, revised plant arrangements resulting in internal and external layout alterations, revised layout to the southern "visual" wing of the building to provide more compartmentalised office space and redistribution of floors to account for the loss of useable area above studio MV1, revised rooflight positioning to reflect the new internal layout, relocation of the external terrace area further to the south; and consequential internal and external design alterations to correspond to the revised approach including minor changes to back of house locations, circulation spaces and amenity areas.
-
26/05511/ADFULL Decided
12 Hereford Road London W2 4AA
Details of windows and external doors, roof louvres, dormers, external cornice, projecting moulding to head of first floor window reveal and contextual photographs of a sample panel of brickwork pursuant to conditions 4 and 6 of planning permission dated 19 March 2025 (RN: 24/08242/FULL).
-
26/05507/LBC Awaiting decision
17 - 21 South Audley Street London W1K 2NY
Removal of lower floorboards, installation of a new floor build-up, refurbishment and reinstatement of existing historic floorboards, and associated works to the Library/Lounge and Stair 03 at ground floor level.
-
26/05512/ADLBC Decided
18 Belgrave Mews West London SW1X 8PX
Details of before and after photos of trial panel/s of the proposed masonry cleaning method/s pursuant to condition 3 of listed building consent dated 05 June 2026 (RN: 26/01147/LBC).
-
26/05520/ADLBC Decided
16 Maida Avenue London W2 1SR
Details of Methodology for terrazzo repair and Methodology and justification for approach to mosaic restoration; pursuant to condition 3 (parts 3 and 5) of listed building consent dated 9th October 2023 (23/01897/LBC)
-
26/05491/FULL Awaiting decision
17 Alexander Street London W2 5NT
Installation of air source heat pump unit within the rear garden and ancillary works.
-
26/05480/FULL Awaiting decision
9 Arncliffe 22 Greville Place London NW6 5JG
Replacement of single glazed crittal windows and patio door with double glazed crittal windows in the south east facade.
-
26/05468/FULL Awaiting decision
Carnaby Street London W1F 9PB
Installation of planters along Carnaby Street, Great Marlborough Street and Lowndes Court for a temporary period of 2 years.
-
26/05613/TDD Awaiting decision
London Business School Sussex Place Regent's Park London NW1 4SA
1 x failed weeping willow: fell
-
26/05685/TPO Awaiting decision
64 Inverness Terrace London W2 3LB
T1- London Plane (Platunus x Hispanica) Pollard back to most previous reduction points, removing approximately 3-4 metres of growth. Standard Management Plan T2-London Plane (Platunus x Hispanica) Pollard back to most previous reduction points, removing approximately 3-4 metres of growth. Standard Management Plan
-
26/05500/LBC Awaiting decision
21 Princes Gate London SW7 1PT
Replacement of floor coverings and floor/ceiling structure at third floor rear balcony, structural strengthening works in rear building wall and works to second floor ceiling under balcony.
-
26/05472/TPO Awaiting decision
60 Inverness Terrace London W2 3LB
T3- Lime (Tilia Cordata) Pollard back to most previous reduction points, removing approximately 3metres of growth. Standard Management Plan.
-
26/05498/TCA Awaiting decision
The Queens Chapel Of The Savoy Savoy Hill London WC2R 0DA
T1, T2 & T3 London Plane Trees (Platanus ? hispanica), Garden Proposed works: Reduce crown by approximately 2?3 metres in all aspects Returning to previous pollard points (re-pollard) Resulting dimensions: Final height approximately 11?12 metres, maintaining previous pollard framework Justification: Routine cyclical maintenance of previously pollarded trees To prevent excessive crown weight and risk of structural failure To contain size within appropriate bounds for the garden setting To manage light levels and leaf litter affecting surrounding area Compliance: All works to be carried out in accordance with BS 3998:2010 ? Recommendations for Tree Work T4 Mulberry (Morus spp.), Garden Proposed works: Formative crown reduction of up to 1 metre to maintain overall balance and shape Height to remain unchanged Current height: Approx. 4 metres Justification: Light formative pruning to encourage strong branch structure Maintain ornamental form and prevent asymmetry Improve long-term health and reduce likelihood of weak limb attachments T5 Fig Tree (Ficus carica), Garden Proposed works: Reduce height by approximately 2.5 metres Reduce lateral spread by 1?2 metres Current height: Approx. 6?7 metres Resulting dimensions: Final height approx. 4?4.5 metres, width reduced accordingly Justification: Routine maintenance to contain size within garden space To improve access and light levels Promote healthy regrowth and fruit production Prevent encroachment onto neighbouring boundaries or structures
-
26/05469/NMA Decided
Underground Car Park Cavendish Square London W1G 0PG
Amendments to planning permission dated 24th May 2022 (RN:19/08460/FULL) for Demolition and erection of above ground structures in conjunction with the use of an underground car park (Sui Generis) as a flexible mixed use commercial development comprising uses within the following use classes A1-A5, B1,B2, B8, C1, C2, D1, and D2 along with the excavation of a 4th basement level, new entrances and associated landscaping and highways works to provide up to 25,953 sqm (GIA) of floorspace. Namely, a series of updated drawings relating to the southern entrance, gardeners pavilion, northeast pavilion, and the extent of pavement lights and grilles.
-
26/05466/AADV Decided
Fenwicks 58 - 63 New Bond Street London W1S 1RJ
Details of inset commercial advertisements to be displayed in panels pursuant to condition 2 of advertisement consent dated 25 June 2026 (26/03294/ADV).
-
26/05499/LBC Awaiting decision
43 Eaton Place London SW1X 8BX
Variation of condition 9 and 11 of listed building consent dated 26th February 2026 (RN: 25/06843/LBC) for the replacement of the existing fourth floor (mansard) level single glazed windows, installation of a new security camera atop the mansard and minor amendments to internal alterations previously approved under RN: 24/08517/LBC, including retention of structural works, new areas of suspended ceiling, amendments to lighting and electrical layouts, replacement and/or retention of pre-existing wall linings/boxing/bulkheads, alterations to openings and new areas of floor coverings (part retrospective); Namely, to allow an extension for the submission of details confirming works have been undertaken in accordance with the requirements of the details set out under Conditions 9 and 11 until 31 November 2026.
-
26/05497/ADV Decided
St James's Market London
Display of Christmas decorations at St James's Market, including six cross street decorations on Norris Street and Carlton Street, one floor mounted decoration and wall mounted decoration for a temporary period from 6 October 2026 to 12 January 2027.
-
26/05614/TDD Awaiting decision
53 Avenue Road NW8 6HR
1 x Ceanothus (T5): removal
-
26/05475/PASPV Awaiting decision
Garage 14 Warwick Place London W9 2PX
Installation of two roof-mounted solar panels with battery storage to provide an independent power supply for the existing garage.
-
26/05502/FULL Awaiting decision
1 Clifton Hill London NW8 0QE
Replacement of all existing windows, modifications to retrospective fenestration arrangements including alterations to two ground floor extension window, alterations to change one existing casement window to a sash window and the repositioning of one first floor window, replacement of entrance and garage doors.
-
26/05496/ADV Decided
Waterloo Place London
Display of 10m Christmas tree at Waterloo Place for temporary period from 2 November 2026 until 9 January 2027.
-
26/05503/ADLBC Awaiting decision
17 - 21 South Audley Street London W1K 2NY
Detailed drawings with method statements where indicated of the new and retained floor, ceiling and wall construction and coverings with detailed build ups and locations proposed impact on existing historic fabric e.g. joists, floor construction, new bathrooms and kitchens showing detailed coordinated servicing and proposed impact on existing historic fabric e.g. joists, floor construction, ventilation and reflected ceiling plans showing light fittings etc and coordinated integrated services, indicating new or retained existing ceiling constructions pursuant to condition 6.2, 6.3 and 6.10 of listed building dated 14th March 2023 (RN:22/05005/LBC)
-
26/05493/LBC Awaiting decision
Flat 3 Carysfort House West Halkin Street London SW1X 8JS
Replacement of single glazed windows at the ground floor flat front elevation, with slimline double glazed windows in matching style.
-
26/05492/FULL Awaiting decision
Flat 3 Carysfort House West Halkin Street London SW1X 8JS
Replacement of single glazed windows at the ground floor flat front elevation, with slimline double glazed windows in matching style.