Skip to content
PlanIndex Get alerts
Menu

Planning application

St Marys Hospital South Wharf Road London W2 1BL

Awaiting decision Westminster 26/06811/FULL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of a VIE oxygen tank, including associated infrastructure and ancillary works (retrospective).

As published by the council, reference 26/06811/FULL

Application record

Reference
26/06811/FULL
Category
Full applications
Status
Pending
Received
6 Oct 2026
Validated
6 Oct 2026
Postcode
W2 1BL

Site history

Applications at this address on the Westminster register

This site has had 8 applications since 2025.

  • 26/07082/ADFULL Awaiting decision

    St Marys Hospital South Wharf Road London W2 1BL

    Details of Habitat and Management Monitoring Plan and Biodiversity Net Gain pursuant to discharge of condition 38 and informative 14 of planning permission dated 31st July 2026 (RN: 25/08914/FULL)

    Submitted 16 Oct 2026
  • 26/06377/ADFULL Awaiting decision

    St Marys Hospital South Wharf Road London W2 1BL

    Details of a pre-commencement condition survey of the canal wall, a written scheme of historic building investigation, a conservation strategy, a method statement and tree protection plan, and a demolition logistics plan pursuant to discharge of conditions 11(A), 15(B), 20, 35 and 46(A) of planning permission dated 31st July 2026 (RN: 25/08914/FULL),

    Submitted 17 Sep 2026
  • 26/05740/EIASCO Awaiting decision

    St Marys Hospital South Wharf Road London W2 1BL

    Request for a scoping opinion under Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the St Mary's Hospital Masterplan redevelopment including demolition of existing buildings, works to listed buildings to provide approximately 34,500 sqm of Class E and Class C1 floorspace, construction of new hospital buildings providing approximately 158,000 sqm of floorspace together with a heliport, construction of new buildings providing approximately 210,000 sqm of Class E and Class C1 floorspace, and associated public realm improvements.

    Submitted 20 Aug 2026
  • 26/05723/ADFULL Awaiting decision

    St Marys Hospital South Wharf Road London W2 1BL

    Details of the maintenance and management of the sustainable drainage scheme including a full CCTV survey prior to above ground work (excluding demolition), details to show that the proposed development will achieve full 'Secured by Design' Accreditation, details of an updated version of the Whole Life Carbon Assessment prior to commencement of any work on site including all works of deconstruction and demolition, details of a Circular Economy Statement, details of a site investigation and remediation strategy and details of the depth and area and overall volume of the of the new soils which you propose to use to create an adequate rooting environment for new tree planting and landscaping at ground level, including details of the drainage layer and other components, the soil specification and profile, the way that the proposed areas of soil will be connected to existing soil, and how the trees will be irrigated and maintained pursuant to condition 3(IV), 14(A), 23(A), 24(A), 26(Phase 2 and Phase 3), 37 of planning permission dated 31st July 2026 (RN:25/08914/FULL)

    Submitted 20 Aug 2026
  • 26/02001/TELNOT Decided

    St Marys Hospital South Wharf Road London W2 1BL

    The removal of 1no. existing antenna and installation of 1no. new antenna and associated ancillary works thereto. Queen Elizabeth the Queen Mother Building (QEQM Building)

    Decided 31 Mar 2026 Telecoms
  • 26/02003/TELNOT Decided

    St Marys Hospital South Wharf Road London W2 1BL

    Removal of 6No. existing antennas (top Height at 50.10m AGL), and 15 ERSs; the installation of 6No. antennas (top height to 50.42m AGL), and 12 ERSs on the existing poles, 2No. antennas (Top height 50.42m AGL) and 4 ERSs on proposed new support pole, Upgrade of the equipment within the existing cabin and development works thereto.

    Decided 31 Mar 2026 Telecoms
  • 25/08914/FULL Awaiting decision

    St Marys Hospital South Wharf Road London W2 1BL

    Works to The Bays building comprising demolition of the existing roof, internal floors, internal walls and ground floor slab; retention of, and alteration to, the existing external walls and facade; and construction of new four-storey vertical extension, plus a roof level including a rooftop terrace, to provide a mixed-use building comprising: Exhibition, education and multifunctional space; Healthcare research laboratories and consulting rooms with associated clinical spaces; and/or Offices, workspace and meeting space. Demolition of existing portacabin, waste store, Vacuum Insulated Evaporator tank and compound; construction of a 2-storey ancillary pavilion structure; new public realm; new hard and soft landscaping; works to the canal wall; together with provision of servicing, refuse storage, cycle parking, plant equipment and all other associated works. Collectively to be known as the Fleming Centre (Sui Generis use).

    Submitted 8 Dec 2025 Full applications

Timeline

Dates from the published record

  1. 6 Oct 2026

    Received by Westminster

  2. 8 Oct 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 1 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 86 days over the applications it decided in the last year.

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • St Marys Hospital South Wharf Road London W2 1BL

    26/05740/EIASCO Submitted 20 Aug 2026 50 yards away

    89% historically approved · decision due ~15 Oct

    Request for a scoping opinion under Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the St Mary's Hospital Masterplan redevelopment including demolition of existing buildings, works to listed buildings to provide approximately 34,500 sqm of Class E and Class C1 floorspace, construction of new hospital buildings providing approximately 158,000 sqm of floorspace together with a heliport, construction of new buildings providing approximately 210,000 sqm of Class E and Class C1 floorspace, and associated public realm improvements.

    Awaiting decision Demolition
  • St Marys Hospital South Wharf Road London W2 1BL

    26/05723/ADFULL Submitted 20 Aug 2026 50 yards away

    89% historically approved · decision due ~15 Oct

    Details of the maintenance and management of the sustainable drainage scheme including a full CCTV survey prior to above ground work (excluding demolition), details to show that the proposed development will achieve full 'Secured by Design' Accreditation, details of an updated version of the Whole Life Carbon Assessment prior to commencement of any work on site including all works of deconstruction and demolition, details of a Circular Economy Statement, details of a site investigation and remediation strategy and details of the depth and area and overall volume of the of the new soils which you propose to use to create an adequate rooting environment for new tree planting and landscaping at ground level, including details of the drainage layer and other components, the soil specification and profile, the way that the proposed areas of soil will be connected to existing soil, and how the trees will be irrigated and maintained pursuant to condition 3(IV), 14(A), 23(A), 24(A), 26(Phase 2 and Phase 3), 37 of planning permission dated 31st July 2026 (RN:25/08914/FULL)

    Awaiting decision Demolition
  • St Marys Hospital South Wharf Road London W2 1BL

    26/07082/ADFULL Submitted 16 Oct 2026 50 yards away

    89% historically approved · decision due ~14 Dec

    Details of Habitat and Management Monitoring Plan and Biodiversity Net Gain pursuant to discharge of condition 38 and informative 14 of planning permission dated 31st July 2026 (RN: 25/08914/FULL)

    Awaiting decision
  • St Marys Hospital South Wharf Road London W2 1BL

    26/06377/ADFULL Submitted 17 Sep 2026 50 yards away

    89% historically approved · decision due ~26 Nov

    Details of a pre-commencement condition survey of the canal wall, a written scheme of historic building investigation, a conservation strategy, a method statement and tree protection plan, and a demolition logistics plan pursuant to discharge of conditions 11(A), 15(B), 20, 35 and 46(A) of planning permission dated 31st July 2026 (RN: 25/08914/FULL),

    Awaiting decision Demolition Trees
  • St Marys Hospital South Wharf Road London W2 1BL

    26/02001/TELNOT Submitted 26 Feb 2026 50 yards away

    The removal of 1no. existing antenna and installation of 1no. new antenna and associated ancillary works thereto. Queen Elizabeth the Queen Mother Building (QEQM Building)

    Decided Telecoms 3 docs
  • St Marys Hospital South Wharf Road London W2 1BL

    26/02003/TELNOT Submitted 16 Feb 2026 50 yards away

    Removal of 6No. existing antennas (top Height at 50.10m AGL), and 15 ERSs; the installation of 6No. antennas (top height to 50.42m AGL), and 12 ERSs on the existing poles, 2No. antennas (Top height 50.42m AGL) and 4 ERSs on proposed new support pole, Upgrade of the equipment within the existing cabin and development works thereto.

    Decided Telecoms 4 docs

In Westminster

  • 26/05984/FULL Decided

    41 Sutherland Street London SW1V 4JX

    Replacement of front, side and rear windows with double glazed timber framed sash windows and replacement of a door with a double glazed timber framed door.

    Received 2 Sep, published by the council 11 Sep 2026 Full applications
  • 26/06134/FULL Decided

    Flat 10H Hyde Park Mansions Cabbell Street London NW1 5BG

    Replacement of front and rear second floor level windows with slim-profile double-glazed panels, retaining the existing window and door frames.

    Received 8 Sep, published by the council 15 Sep 2026 Full applications
  • 26/07258/FULL Awaiting decision

    16A Croxley Road London W9 3HL

    Installation of air to air heat pumps to offices and bedrooms.

    Received 22 Oct, published by the council 23 Oct 2026 Full applications
  • 26/07193/FULL Awaiting decision

    98 Victoria Street London SW1E 5JL

    Shopfront alterations. (Linked with 26/07194/ADV)

    Received 21 Oct, published by the council 22 Oct 2026 Full applications
  • 26/07187/FULL Awaiting decision

    Ground Floor Flat 151 Portnall Road London W9 3BN

    Erection of a single storey rear extension.

    Received 21 Oct, published by the council 22 Oct 2026 Full applications