Planning application
20 Conduit Street London W1S 2XW
Relates to 25/06305/LBC
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of replacement ground floor primary office entrance door; Retention of fanlight and recolouring of building number signage and replacement of intercom.(Linked to 25/06305/LBC)
As published by the council, reference 25/06304/FULL
Application record
- Reference
- 25/06304/FULL
- Type
- Full Planning Permission Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 4 Sep 2025
- Validated
- 4 Sep 2025
- Decided
- 28 Oct 2025
- Ward
- West End
- Decision by
- Delegated Decision
- Postcode
- W1S 2XW
Site history
Applications at this address on the Westminster register
This site has had 6 applications since 2025: 2 approved, 0 refused.
-
26/05636/ADFULL Decided
20 Conduit Street London W1S 2XW
Details of conservation rooflights, new rear door, and new rear window pursuant to condition 4 of planning permission dated 27.05.2026 (RN:26/02022/FULL). (Linked with 26/05630/ADLBC)
-
26/05630/ADLBC Decided
20 Conduit Street London W1S 2XW
Detailed drawings of the Conservation Rooflights, new Rear Door, and new rear window; Pursuant to condition 2 of Listed Building Consent dated 27th May 2026 (26/02023/LBC)
-
26/02023/LBC Awaiting decision
20 Conduit Street London W1S 2XW
Internal alterations at fifth floor level, installation of two conservation style rooflights at roof level, installation of one rear casement window at fifth floor level, replacement of existing maintenance access door with new glazed door, replacement of damaged roof tiles and installation of insulation; and removal and installation of two new MVHR extract and intake roof cowls. (Linked to 26/02022/FULL)
-
26/02022/FULL Awaiting decision
20 Conduit Street London W1S 2XW
Installation of two conservation style rooflights at roof level, installation of one rear casement window at fifth floor level, replacement of existing maintenance access door with new glazed door, replacement of damaged roof tiles and installation of insulation; and removal and installation of two new MVHR extract and intake roof cowls. (Linked to 26/02023/LBC)
-
25/06305/LBC Granted
20 Conduit Street London W1S 2XW
Installation of replacement ground floor primary office entrance door; Retention of fanlight and recolouring of building number signage and replacement of intercom. (Linked to 25/06304/FULL)
Timeline
Dates from the published record
-
4 Sep 2025
Received by Westminster
-
28 Oct 2025
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
25/06305/LBC Granted
20 Conduit Street London W1S 2XW
Installation of replacement ground floor primary office entrance door; Retention of fanlight and recolouring of building number signage and replacement of intercom. (Linked to 25/06304/FULL)
1 later application on the register refers to this one:
-
25/06305/LBC Granted
20 Conduit Street London W1S 2XW
Installation of replacement ground floor primary office entrance door; Retention of fanlight and recolouring of building number signage and replacement of intercom. (Linked to 25/06304/FULL)
Who's behind it
Company information only, from the register and Companies House
Savills (UK) Ltd Agent, registered in London
Active · incorporated 1991 · London
982 applications on PlanIndex · across 138 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 28 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
20 Conduit Street London W1S 2XW
Installation of replacement ground floor primary office entrance door; Retention of fanlight and recolouring of building number signage and replacement of intercom. (Linked to 25/06304/FULL)
Granted Heritage and listed buildings 13 docs -
20 Conduit Street London W1S 2XW
90% historically approved · decision due ~21 May
Internal alterations at fifth floor level, installation of two conservation style rooflights at roof level, installation of one rear casement window at fifth floor level, replacement of existing maintenance access door with new glazed door, replacement of damaged roof tiles and installation of insulation; and removal and installation of two new MVHR extract and intake roof cowls. (Linked to 26/02022/FULL)
Awaiting decision Heritage and listed buildings Loft or dormer Roofing +1 21 docs -
20 Conduit Street London W1S 2XW
89% historically approved · decision due ~13 Oct
Details of conservation rooflights, new rear door, and new rear window pursuant to condition 4 of planning permission dated 27.05.2026 (RN:26/02022/FULL). (Linked with 26/05630/ADLBC)
Decided Loft or dormer Windows or glazing -
20 Conduit Street London W1S 2XW
89% historically approved · decision due ~13 Oct
Detailed drawings of the Conservation Rooflights, new Rear Door, and new rear window; Pursuant to condition 2 of Listed Building Consent dated 27th May 2026 (26/02023/LBC)
Decided Loft or dormer Windows or glazing -
20 Conduit Street London W1S 2XW
87% historically approved · decision due ~21 May
Installation of two conservation style rooflights at roof level, installation of one rear casement window at fifth floor level, replacement of existing maintenance access door with new glazed door, replacement of damaged roof tiles and installation of insulation; and removal and installation of two new MVHR extract and intake roof cowls. (Linked to 26/02023/LBC)
Awaiting decision Full applications Loft or dormer Roofing +1 26 docs -
Sofia House 19 Conduit Street London W1S 2BH
89% historically approved · decision due ~14 Oct
Details of the pre-demolition audit in accordance with section 4.6 of the GLA's adopted Circular Economy; pursuant to condition 12 of Planning Permission dated 31 July 2026 (26/02841/FULL)
Awaiting decision Demolition
Other full applications
In Westminster
-
26/06295/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Installation of a new shopfront with Medication Dispensing Outlet.
-
26/06297/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Alterations to rear elevation at basement level comprising replacement window and installation of double opening door.
-
26/06294/FULL Awaiting decision
15 Eaton Mews South London SW1W 9HP
Installation of railings and sliding lantern light at main roof level in connection with the use of the roof as a terrace.
-
26/06317/FULL Awaiting decision
124 Hamilton Terrace London NW8 9UT
Replacement of existing first-floor sash windows to the front and rear elevations with traditionally detailed painted timber, slim-profile double-glazed sash windows. (Linked to 26/06318/LBC)
-
26/06273/FULL Awaiting decision
9A Grosvenor Square London W1K 5AE
Installation of natural Portland Stone paving to two front entrances. (Linked to 26/05473/LBC)