Skip to content
PlanIndex Get alerts
Menu

Planning application

13 Park Place Villas London W2 1SP

Awaiting decision Westminster 26/05505/LBC Heritage and listed buildings

Works: Extension Loft or dormer Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of an air source heat pump, solar slates, heat recovery ventilation system valves, alterations to fenestration and internal alterations including installation of a sprinkler system, installation of heat recovery ventilation system, internal wall insulation, over boarding of first and second floor hallway walls with fire resistant plasterboard and laying of fire resistant blanket between joists in addition to works previously approved works under RN. 26/02939/FULL and 26/02940/LBC which permitted replacement of lower ground floor rear extension; enlargement of existing two-storey side extension; works to loft level including installation of rooflights; alterations to fenestration; landscaping works; internal alterations to all floors and other minor works. (Linked to 26/05504/FULL)

As published by the council, reference 26/05505/LBC

Application record

Reference
26/05505/LBC
Category
Heritage and listed buildings
Status
Pending
Received
12 Aug 2026
Validated
12 Aug 2026
Postcode
W2 1SP

Timeline

Dates from the published record

  1. 12 Aug 2026

    Received by Westminster

  2. 14 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 7 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • 13 Park Place Villas London W2 1SP

    26/05299/LBC Submitted 5 Aug 2026 0m away

    90% historically approved · decision due ~30 Sep

    Excavation of basement with front lightwell covered with grille and rear rooflight; repaving and part-rebuilding of existing lightwell; replacement pot guards to ground floor front windows; associated landscaping works; and, works previously approved works under planning permission RN 26/02939/FULL and listed building consent RN 26/02940/LBC which permitted replacement of lower ground floor rear extension; enlargement of existing two-storey side extension; works to loft level including installation of rooflights; alterations to fenestration; landscaping works; internal alterations to all floors and other minor works. (Linked with 26/05298/FULL)

    Awaiting decision Heritage and listed buildings Extension Loft or dormer +1
  • 13 Park Place Villas London W2 1SP

    26/05298/FULL Submitted 5 Aug 2026 0m away

    87% historically approved · decision due ~30 Sep

    Excavation of basement with front lightwell covered with grille and rear rooflight; repaving and part-rebuilding of existing lightwell; replacement pot guards to ground floor front windows; associated landscaping works; and, works previously approved works under planning permission RN 26/02939/FULL and listed building consent RN 26/02940/LBC which permitted replacement of lower ground floor rear extension; enlargement of existing two-storey side extension; works to loft level including installation of rooflights; alterations to fenestration; landscaping works; internal alterations to all floors and other minor works. (Linked with 26/05299/LBC)

    Awaiting decision Full applications Extension Loft or dormer +1
  • 13 Park Place Villas London W2 1SP

    26/05504/FULL Submitted 12 Aug 2026 0m away

    87% historically approved · decision due ~7 Oct

    Installation of an air source heat pump, solar slates, heat recovery ventilation system valves, alterations to fenestration and internal alterations including installation of a sprinkler system, installation of heat recovery ventilation system, internal wall insulation, over boarding of first and second floor hallway walls with fire resistant plasterboard and laying of fire resistant blanket between joists in addition to works previously approved works under RN. 26/02939/FULL and 26/02940/LBC which permitted replacement of lower ground floor rear extension; enlargement of existing two-storey side extension; works to loft level including installation of rooflights; alterations to fenestration; landscaping works; internal alterations to all floors and other minor works. (Linked to 26/05505/LBC)

    Awaiting decision Full applications Extension Loft or dormer +1
  • 13 Park Place Villas London W2 1SP

    25/07553/FULL Submitted 17 Oct 2025 8m away

    Replacement of lower ground floor rear extension; enlargement of existing two-storey side extension; works to loft level including installation of rooflights; and internal alterations to all floors. (Linked to 25/07554/LBC)

    Refused Full applications Extension Loft or dormer 23 docs
  • 13 Park Place Villas London W2 1SP

    25/07554/LBC Submitted 17 Oct 2025 8m away

    Replacement of lower ground floor rear extension; enlargement of existing two-storey side extension; works to loft level including installation of rooflights; and internal alterations to all floors. (Linked to 25/07553/FULL)

    Refused Heritage and listed buildings Extension Loft or dormer 17 docs
  • 13 Park Place Villas London W2 1SP

    26/02939/FULL Submitted 5 May 2026 11m away

    87% historically approved · decision due ~30 Jun

    Replacement of lower ground floor rear extension; enlargement of existing two-storey side extension; works to loft level including installation of rooflights; alterations to fenestration; internal alterations to all floors and other minor works. [Linked to 26/02940/LBC]

    Awaiting decision Full applications Extension Loft or dormer +1 15 docs

In Westminster

  • 26/06025/LBC Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06024/FULL)

    3 Sep 2026 Heritage and listed buildings
  • 26/05971/LBC Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Automation of door at principal floor level.

    1 Sep 2026 Heritage and listed buildings
  • 26/05962/LBC Awaiting decision

    Royal Albert Hall Kensington Gore London SW7 2AP

    Variation of condition 2 of listed building consent dated 26 March 2024 (RN: 24/00820/LBC) for the: Erect temporary access scaffolding platform at high level in the auditorium to inspect the condition of the plaster ceilings and main cornices. NAMELY, to allow the gantry to remain in place until December 2028.

    1 Sep 2026 Heritage and listed buildings
  • 26/05970/LBC Awaiting decision

    Norman Shaw Building South Victoria Embankment London SW1A 2HZ

    Replacement and installation of 16 electronic access control systems to Norman Shaw South

    1 Sep 2026 Heritage and listed buildings
  • 26/05943/LBC Awaiting decision

    1 Barton Street London SW1P 3NG

    Use of the building as F1(a) Education, along with associated internal and external alterations. (Linked with 26/05942/FULL)

    1 Sep 2026 Heritage and listed buildings