Planning application
30 Chepstow Road London W2 5BE
Works: Windows or glazing
Relates to 26/05167/ADFULL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details of stair to basement, railings to front garden lightwell, new windows and doors, and structural assessment of front vault structure pursuant to condition 3 of listed building consent dated 15 July 2024 (RN: 23/08925/LBC) [Linked to 26/05167/ADFULL]
As published by the council, reference 26/05247/ADLBC
Application record
- Reference
- 26/05247/ADLBC
- Status
- Pending
- Received
- 31 Jul 2026
- Validated
- 5 Aug 2026
- Postcode
- W2 5BE
Site history
Applications at this address on the Westminster register
This site has had 6 applications since 2022: 2 approved, 0 refused.
-
26/05167/ADFULL Awaiting decision
30 Chepstow Road London W2 5BE
Details of tree protection method statement / stair to basement, railings to front garden lightwell, new windows and doors, and structural assessment of front vault structure pursuant to conditions 5 and 6 of planning permission dated 15 July 2024 (RN: 23/08924/FULL) [Linked to 26/05247/ADLBC]
-
26/04058/ADLBC Decided
30 Chepstow Road London W2 5BE
Details of paving materials, stone copings, internal & external doors and glazing and guttering pursuant to condition 3 (parts 2, 3, 4 and 6 only) of listed building consent dated 20 May 2025 (RN: 24/08019/LBC). (Linked with 26/04036/ADFULL)
-
26/04036/ADFULL Decided
30 Chepstow Road London W2 5BE
Details of paving materials, stone copings, external doors and glazing and guttering pursuant to condition 4 (parts 2, 3, 4 and 6 only) of planning permission dated 20 May 2025 (RN: 24/08018/FULL). (Linked with 26/04058/ADLBC)
-
25/08112/ADLBC Granted
30 Chepstow Road London W2 5BE
Details of the new brickwork (showing brick type, bond, mortar method, and material specification) (sample panel) and details of the internal pipes routes to replace external, demonstrating avoidance of fabric and features of significance. (drawings at 1:20, 1:10 or as appropriate) pursuant to condition 3 (parts (1) and (5) only) of listed building consent dated 15th August 2024 (RN:23/06807/LBC)
-
22/04213/LBC Granted
30 Chepstow Road London W2 5BE
Repair and renewal of the existing lead covered tented front canopy; cleaning of the existing stone balcony and repainting of the associated railings; reinstatement of natural stone paving to the front path and steps to match neighbouring properties
Timeline
Dates from the published record
-
31 Jul 2026
Received by Westminster
-
5 Aug 2026
Validated
Checked as complete and ready for consideration.
-
9 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 86 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
26/05167/ADFULL Awaiting decision
30 Chepstow Road London W2 5BE
Details of tree protection method statement / stair to basement, railings to front garden lightwell, new windows and doors, and structural assessment of front vault structure pursuant to conditions 5 and 6 of planning permission dated 15 July 2024 (RN: 23/08924/FULL) [Linked to 26/05247/ADLBC]
1 later application on the register refers to this one:
-
26/05167/ADFULL Awaiting decision
30 Chepstow Road London W2 5BE
Details of tree protection method statement / stair to basement, railings to front garden lightwell, new windows and doors, and structural assessment of front vault structure pursuant to conditions 5 and 6 of planning permission dated 15 July 2024 (RN: 23/08924/FULL) [Linked to 26/05247/ADLBC]
What happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster's median decision took 86 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Westminster's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
66 Chepstow Road London W2 5BE
88% historically approved · decision due ~4 Nov
Replacement of front and rear windows with vacuum glazing and slightly narrower glazing bars; replacement of front and basement access doors with new front door, fanlight and frame (vacuum-glazed) and new (vacuum-glazed) basement access door. (Linked with 26/05852/LBC)
Awaiting decision Full applications Windows or glazing -
66 Chepstow Road London W2 5BE
90% historically approved · decision due ~4 Nov
Replacement of front and rear windows with vacuum glazing and slightly narrower glazing bars; replacement of front and basement access doors with new front door, fanlight and frame (vacuum-glazed) and new (vacuum-glazed) basement access door. (Linked with 26/06175/FULL)
Awaiting decision Heritage and listed buildings Windows or glazing -
30 Chepstow Road London W2 5BE
89% historically approved · decision due ~30 Sep
Details of tree protection method statement / stair to basement, railings to front garden lightwell, new windows and doors, and structural assessment of front vault structure pursuant to conditions 5 and 6 of planning permission dated 15 July 2024 (RN: 23/08924/FULL) [Linked to 26/05247/ADLBC]
Awaiting decision Windows or glazing Trees -
30 Chepstow Road London W2 5BE
Details of paving materials, stone copings, internal & external doors and glazing and guttering pursuant to condition 3 (parts 2, 3, 4 and 6 only) of listed building consent dated 20 May 2025 (RN: 24/08019/LBC). (Linked with 26/04036/ADFULL)
Decided Windows or glazing -
30 Chepstow Road London W2 5BE
Details of the new brickwork (showing brick type, bond, mortar method, and material specification) (sample panel) and details of the internal pipes routes to replace external, demonstrating avoidance of fabric and features of significance. (drawings at 1:20, 1:10 or as appropriate) pursuant to condition 3 (parts (1) and (5) only) of listed building consent dated 15th August 2024 (RN:23/06807/LBC)
Granted Conditions 20 docs -
30 Chepstow Road London W2 5BE
89% historically approved · decision due ~14 Aug
Details of paving materials, stone copings, external doors and glazing and guttering pursuant to condition 4 (parts 2, 3, 4 and 6 only) of planning permission dated 20 May 2025 (RN: 24/08018/FULL). (Linked with 26/04058/ADLBC)
Decided Windows or glazing