Planning application
25/08112/ADLBC
30 Chepstow Road London W2 5BE
Proposal
Details of the new brickwork (showing brick type, bond, mortar method, and material specification) (sample panel) and details of the internal pipes routes to replace external, demonstrating avoidance of fabric and features of significance. (drawings at 1:20, 1:10 or as appropriate) pursuant to condition 3 (1) and (5) of planning permission dated 15th August 2024 (RN:23/06807/LBC)
As published by the council, reference 25/08112/ADLBC
Timeline
Dates from the published record
-
6 Nov 2025
Received by Westminster
-
14 Nov 2025
Validated
Checked as complete and ready for consideration.
-
20 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
26/03519/LBC Awaiting decision
66 Chepstow Road London W2 5BE
Amend cornices and add ceiling roses as set out in consented works: 25/03948/LBC; alterations to the building by installing new fireplace in reception room; new furniture in the rear office; new cupboards in the master bedroom; new opening from the master bedroom to the bathroom (closing up the outer door) and new bathroom arrangement.
-
22/03888/LBC Granted
42 Chepstow Road London W2 5BE
Repairs to the brickwork and stucco facade to the right side of the front elevation from ground to parapet level.
-
26/04449/LBC Awaiting decision
Ground Flat 39 Chepstow Road London W2 5BP
Internal layout alterations (Retrospective)
-
26/03424/LBC Awaiting decision
79B Hereford Road London W2 5BB
Replacement of double-glazed timber framed two windows with a 4mm thin toughened single glazed timber framed windows at rear elevation. Linked with 26/03423/FULL
-
26/03423/FULL Awaiting decision
79B Hereford Road London W2 5BB
Replacement of double-glazed timber framed two windows with a 4mm thin toughened single glazed timber framed windows at rear elevation. Linked with 26/03424/LBC
-
25/07991/TCA Awaiting decision
85 Hereford Road London W2 5BB
1 x tree of heaven (rear): crown reduction to previous, most recent reduction points.
Other conditions applications
In Westminster
-
26/04967/ADLBC Withdrawn
Royal Institute Of British Architects 66 Portland Place London W1B 1AD
Details of installation of services and related fixtures pursuant to condition 8 (partial) of listed building consent dated 10 June 2025 (RN: 25/01205/LBC)
-
26/04860/ADLBC Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 7(E) of listed building consent dated 12th February 2021 (RN: 19/07816/LBC)
-
26/04843/ADLBC Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site pursuant to Condition 6(m) of listed building consent dated 12th February 2021 (19/07816/LBC).
-
26/04998/ADLBC Awaiting decision
17 - 21 South Audley Street London W1K 2NY
Detailed drawings of Bathroom and Kitchen details for apartments 01, 02, 08, 09, 10 and 11 and Reflected ceiling plans for Apartment 1 powder room and bathroom, Apartment 2 powder room and bathrooms, Apartment 8 power room and bathroom, Apartment 9 bathrooms, Apartment 10 bathroom and shower room, and Apartment 11 bathrooms pursuant to partial discharge of conditions 6.3 and 6.10 of listed building consent dated 14th March 2023 (RN: 22/05005/LBC).
-
26/04992/ADLBC Awaiting decision
17 - 21 South Audley Street London W1K 2NY
Detailed drawings of wall construction to new apartments pursuant to partial discharge of condition 6.2 of listed building consent dated 14th March 2023 (RN: 22/05005/LBC).