Planning application
26/05064/ADFULL
Development Site At 19 To 24 Dering Street London W1S 1BL
Proposal
Detailed of uperstructure works, detailed plans and elevations of the roof, including the proposed equipment and the layout of photovoltaic (PV) panels pursuant to condition 29 of Planning Permission dated 18th October 2024 (RN:23/07483).
As published by the council, reference 26/05064/ADFULL
Timeline
Dates from the published record
-
28 Jul 2026
Received by Westminster
-
4 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00212/ADFULL Granted
Development Site At 19 To 24 Dering Street London W1S 1BL
Details of an updated Whole Life Carbon report prior to the commencement of any construction works pursuant to Condition 19 (part b) of planning permission dated 18 October 2024 (RN: 23/07483/FULL)
-
26/02435/ADFULL Awaiting decision
Development Site At 19 To 24 Dering Street London W1S 1BL
Details of Circular Economy Statement, pursuant to condition 20 of planning permission dated 18 October 2024 (RN 23/07483/FULL)
-
25/06340/ADFULL Granted
Development Site At 19 To 24 Dering Street London W1S 1BL
Details of Code of Construction Practice pursuant to condition 3 (A) of planning permission dated 18th October 2024 (RN:23/07483/FULL)
-
25/06749/NMA Granted
Development Site At 19 To 24 Dering Street London W1S 1BL
Amendments to planning permission dated 18th October 2024 (RN:23/07483/FULL) for Part demolition, part redevelopment and extension to provide a building of two basements, ground and five upper floors, setback sixth floor and setback seventh floor with roof plant and terraces, accommodating accommodating Commercial, business and service (Class E) use and associated ancillary spaces. Namely, for various adjustments to detailed design elements such as retains the desired extent of the existing foundations, basement, structural frame and floor slabs up to third floor, aligns and loads all new structural and facade elements concentrically onto the retained existing structure and foundations, and; accurately interfaces with neighbouring party walls, roofs and parapets.
-
26/00411/ADV Awaiting decision
311 Oxford Street London W1C 2HP
Display of double-sided LED advertisement screen, measuring 1338 x 2100 x 245mm
-
25/09314/ADFULL Awaiting decision
6 Dering Street London W1S 1AD
Details of sound insulation measures pursuant to Condition 4 of prior approval dated 09 May 2025 (RN: 25/01912/P3JPA).
Other full applications applications
In Westminster
-
26/05054/ADFULL Awaiting decision
82 Margaret Street London W1W 8LH
Detailed planting scheme and an associated biodiversity management plan; pursuant to condition 24 of planning permission dated 10th November 2025 (25/02820/FULL)
-
26/05052/FULL Awaiting decision
23 York Street London W1U 6PF
Internal reconfiguration and refurbishment of the existing residential building to improve the layout of six self-contained flats, together with associated internal alterations, minor external alterations to the rear elevation, replacement of windows and doors where shown, and associated mechanical, electrical and fire safety works. (Linked with 26/05053/LBC)
-
26/05069/FULL Awaiting decision
Stanhope House Stanhope Place London W2 2HH
Replacement of balcony balustrade and cornice flashing repairs. (Linked with 26/05070/LBC)
-
26/05078/ADFULL Awaiting decision
63 Blandford Street London W1U 7HR
Details of written photographic specification of the materials; exterior of the new extension; new windows, rooflights, and doors; new roof balustrade to rear; and new solar panels pursuant to conditions 4 and 5 of planning permission dated 03 November 2025 (RN: 25/04449/FULL).
-
26/05075/ADFULL Awaiting decision
86 Horseferry Road London SW1P 2EE
Details of a Building Research Establishment methods ('BREEAM') rating of 'Excellent' (or equivalent independent assessment) pursuant to condtion 12 of Planning Permission dated 9th September 2024 (RN:24/04890).