Skip to content
PlanIndex Get alerts
Menu

Planning application

25/06340/ADFULL

Development Site At 19 To 24 Dering Street London W1S 1BL

Granted Westminster Approval of Details (Full PP)

Proposal

Details of Code of Construction Practice pursuant to condition 3 (A) of planning permission dated 18th October 2024 (RN:23/07483/FULL)

As published by the council, reference 25/06340/ADFULL

Timeline

Dates from the published record

  1. 5 Sep 2025

    Received by Westminster

  2. 17 Sep 2025

    Decision issued: Application Permitted

  3. 21 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00212/ADFULL Granted

    Development Site At 19 To 24 Dering Street London W1S 1BL

    Details of an updated Whole Life Carbon report prior to the commencement of any construction works pursuant to Condition 19 (part b) of planning permission dated 18 October 2024 (RN: 23/07483/FULL)

    15 Jan 2026 0m away Full applications
  • 26/02435/ADFULL Awaiting decision

    Development Site At 19 To 24 Dering Street London W1S 1BL

    Details of Circular Economy Statement, pursuant to condition 20 of planning permission dated 18 October 2024 (RN 23/07483/FULL)

    14 Apr 2026 0m away Full applications
  • 25/06749/NMA Granted

    Development Site At 19 To 24 Dering Street London W1S 1BL

    Amendments to planning permission dated 18th October 2024 (RN:23/07483/FULL) for Part demolition, part redevelopment and extension to provide a building of two basements, ground and five upper floors, setback sixth floor and setback seventh floor with roof plant and terraces, accommodating accommodating Commercial, business and service (Class E) use and associated ancillary spaces. Namely, for various adjustments to detailed design elements such as retains the desired extent of the existing foundations, basement, structural frame and floor slabs up to third floor, aligns and loads all new structural and facade elements concentrically onto the retained existing structure and foundations, and; accurately interfaces with neighbouring party walls, roofs and parapets.

    19 Sep 2025 13m away Amendments
  • 26/00411/ADV Awaiting decision

    311 Oxford Street London W1C 2HP

    Display of double-sided LED advertisement screen, measuring 1338 x 2100 x 245mm

    23 Jan 2026 26m away Advertising
  • 25/09314/ADFULL Awaiting decision

    6 Dering Street London W1S 1AD

    Details of sound insulation measures pursuant to Condition 4 of prior approval dated 09 May 2025 (RN: 25/01912/P3JPA).

    23 Dec 2025 26m away Full applications
  • 26/04345/ADFULL Awaiting decision

    19 Dering Street London W1S 1AH

    Details of completed Appendix A checklist from the Code of Construction Practice pursuant to 3 of planning permission dated 18 October 2024 (RN: 23/07483/FULL).

    1 Jul 2026 27m away Full applications

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications