Planning application
49 Queen's Gardens London W2 3AA
Works: Extension Loft or dormer Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of a mansard roof extension with rooflights & rear balcony. provision of rear balconies at ground and first floor levels. removal of extension within rear lightwell. extension of the rear wing at first floor (mezzanine) and second floor levels, fenestration enhancements including new windows, stucco repairs and partial rebuilding of rear extensions, including internal alterations at all levels. (Linked with 26/05051/LBC)
As published by the council, reference 26/05050/FULL
Application record
- Reference
- 26/05050/FULL
- Category
- Full applications
- Status
- Pending
- Received
- 28 Jul 2026
- Validated
- 10 Aug 2026
- Postcode
- W2 3AA
Timeline
Dates from the published record
-
28 Jul 2026
Received by Westminster
-
10 Aug 2026
Validated
Checked as complete and ready for consideration.
-
11 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 61 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
49 Queen's Gardens London W2 3AA
90% historically approved · decision due ~5 Oct
Erection of a mansard roof extension with rooflights & rear balcony. provision of rear balconies at ground and first floor levels. removal of extension within rear lightwell. extension of the rear wing at first floor (mezzanine) and second floor levels, fenestration enhancements including new windows, stucco repairs and partial rebuilding of rear extensions, including internal alterations at all levels. (Linked with 26/05050/FULL)
Awaiting decision Heritage and listed buildings Extension Loft or dormer +1 -
51 Queen's Gardens London W2 3AA
90% historically approved · decision due ~21 Aug
Installation of full fibre cabling and ancillary works to front elevation and communal internal spaces.
Awaiting decision Heritage and listed buildings -
Basement Flat 40 Queen's Gardens London W2 3AA
90% historically approved · decision due ~16 Jul
Replacement of existing floor tiles in front light well and stairs with new tiles (Linked with 26/03353/FULL)
Awaiting decision Heritage and listed buildings 7 docs -
Basement Flat 40 Queen's Gardens London W2 3AA
87% historically approved · decision due ~16 Jul
Replacement of existing floor tiles in front light well and stairs with new tiles (Linked with 26/03354/LBC)
Awaiting decision Full applications 7 docs -
Flat 3 37 Queen's Gardens London W2 3AA
Internal alterations relating to the amalgamation of three flats.
Granted Heritage and listed buildings New dwelling 19 docsSeveral homes -
51 Queen's Gardens London W2 3AA
Installation of double glazing to the front windows of the basement flat overlooking the basement lightwell; installation of light-coloured porcelain tiles to the basement floor area and to the stair treads, risers and landing on the external stair leading from the pavement level to basement (Retrospective); and removal of the solid concrete / masonry wall providing guarding to the external stair leading from the pavement level down to basement level. (Linked with 25/06899/FULL).
Granted Heritage and listed buildings Windows or glazing 14 docs
Other full applications applications
In Westminster
-
26/06024/FULL Awaiting decision
House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA
Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)
-
26/06017/FULL Awaiting decision
38 Lauderdale Mansions Lauderdale Road London W9 1NE
Installation of an external AC Unit / Heat Pump at roof level.
-
26/05938/FULL Awaiting decision
24 Vincent Square London SW1P 2NJ
Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.
-
26/05935/FULL Awaiting decision
47 Hereford Road London W2 5AH
Installation of one number new external condenser unit to the southerly elevation service alley.
-
26/05959/FULL Awaiting decision
Basement And Ground Floor 50 New Bond Street London W1S 1BJ
Installation of three new condensers on the roof, within an existing designated plant area.