Skip to content
PlanIndex Get alerts
Menu

Planning application

19 Leinster Terrace London W2 3ET

Awaiting decision Westminster 26/04935/FULL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of commercial kitchen ventilation equipment, including kitchen extract system, supply air system, filtration equipment, associated internal and external ductwork, roof level discharge terminals, support brackets and ancillary plant in connection with the existing commercial premises.

As published by the council, reference 26/04935/FULL

Application record

Reference
26/04935/FULL
Category
Full applications
Status
Pending
Received
23 Jul 2026
Validated
20 Aug 2026
Postcode
W2 3ET

Timeline

Dates from the published record

  1. 23 Jul 2026

    Received by Westminster

  2. 20 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 15 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 29 Leinster Terrace London W2 3ET

    25/05793/COADV Submitted 15 Aug 2025 10m away

    Display of internally illuminated fascia sign measuring 5.8m X 0.63m and non illuminated projecting sign measuring 0.5m X 0.5m (Linked with 25/05792/COFUL)

    Granted Advertising 16 docs
  • 29 Leinster Terrace London W2 3ET

    25/05792/COFUL Submitted 15 Aug 2025 10m away

    Shopfront repair and redecorations including repainting, tiling to pilasters; replacement of awning; and repairs to existing forecourt tiles. (Linked with 25/05793/COADV)

    Granted Full applications Windows or glazing 24 docs
  • 11A Porchester Terrace London W2 3TH

    25/09167/TPO Submitted 18 Dec 2025 30m away

    1 x cherry (front): fell

    Granted Trees 7 docs
  • 11A Porchester Terrace London W2 3TH

    26/03471/TPO Submitted 27 May 2026 33m away

    100% historically approved · decision due ~22 Jul

    1 x cherry (front): fell; no replacement planting condition.

    Awaiting decision Trees 7 docs
  • 17 Leinster Terrace London W2 3EU

    25/04724/FULL Submitted 9 Jul 2025 34m away

    Installation of new retractable awning; relocation of hanging baskets to the front of the Leinster Arms pub front; and other associated works. Linked with 25/04725/LBC

    Withdrawn Full applications 27 docs
  • 17 Leinster Terrace London W2 3EU

    25/04725/LBC Submitted 9 Jul 2025 34m away

    Installation of new retractable awning; relocation of hanging baskets to the front of the Leinster Arms pub front; and other associated works. Linked with 25/04724/FULL

    Withdrawn Heritage and listed buildings 26 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications