Planning application
25/04724/FULL
17 Leinster Terrace London W2 3EU
Proposal
Installation of new retractable awning; relocation of hanging baskets to the front of the Leinster Arms pub front; and other associated works. Linked with 25/04725/LBC
As published by the council, reference 25/04724/FULL
Timeline
Dates from the published record
-
9 Jul 2025
Received by Westminster
-
22 Jul 2025
Validated
Checked as complete and ready for consideration.
-
5 Nov 2025
Decision issued: Application Withdrawn
-
29 Jul 2026
Added to PlanIndex
What withdrawal means
The process from here
The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.
The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/04725/LBC Withdrawn
17 Leinster Terrace London W2 3EU
Installation of new retractable awning; relocation of hanging baskets to the front of the Leinster Arms pub front; and other associated works. Linked with 25/04724/FULL
-
26/03635/ADLBC Awaiting decision
72 - 74 Lancaster Gate London W2 3NH
Details of new and altered windows and rooflights, including secondary glazing; pursuant to condition 3(b) of Listed Building Consent dated 14th December 2023 (RN 23/00772/LBC)
-
26/04558/ADLBC Awaiting decision
72 - 74 Lancaster Gate London W2 3NH
Details of new and altered railings and gates; pursuant to condition 4(b) of Listed Building Consent dated 17th September 2024 (24/02800/LBC)
-
26/04559/ADLBC Awaiting decision
72 - 74 Lancaster Gate London W2 3NH
Details of new external lighting; pursuant to condition 3(g) of Listed Building Consent dated 14th December 2023 (23/00772/LBC) (Linked app: 26/04566/ADFULL)
-
26/04557/ADLBC Awaiting decision
72 - 74 Lancaster Gate London W2 3NH
Details of new and altered railings and gates; pursuant to condition 3(d) of Listed Building Consent dated 14th December 2023 (23/00772/LBC) (Linked app: 26/04565/ADFULL)
-
25/06588/LBC Awaiting decision
72 - 74 Lancaster Gate London W2 3NH
Internal amendments, including a firefighting shaft, smoke ventilation system, changes to windows and rooflights, attenuation of MEP equipment, resulting in changes to vaults below Lancaster Gate and Leinster Terrace and other minor layout changes to apartments and communal areas. (Linked app: 25/06596/NMA)
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.