Planning application
26/04739/ADFULL
2 Clifton Hill London NW8 0QG
Proposal
Details of of a Whole Life Carbon Assessment and full details of the pre-demolition audit pursuant to condition 8 and 9 of planning permission dated 19th June 2026 (RN:25/05807/FULL)
As published by the council, reference 26/04739/ADFULL
Timeline
Dates from the published record
-
15 Jul 2026
Received by Westminster
-
21 Jul 2026
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/06454/ADFULL Granted
2 Clifton Hill London NW8 0QG
Details of a biodiversity management plan and trees - method statement pursuant to Condition 8 and 10 of planning permission dated 23 July 2025 (RN25/03618/FULL)
-
26/01380/TCA Awaiting decision
16 Clifton Hill London NW8 0QG
FRONT OF HOUSE T1-Fig(Ficus carica) -crown thin by 15% with emphasis on inbound house side to allow more air/light through canopy All works are for routine maintenance.
-
25/06424/ADFULL Granted
18 Clifton Hill London NW8 0QG
Details of location of the proposed slot drains and Arboricultural Method Statement and Tree Protection Plan pursuant to Conditions 3 and 9 of planning permission dated 15 November 2024 (RN24/03846/FULL)
-
26/00328/TCA Awaiting decision
12 Clifton Hill London NW8 0QG
Tree Work Please find details of work to be carried out. T2: Ash To pollard to previous reduction points. T3:Lime To crown reduce to previous, most recent reduction points, retaining shortened furnishing growth and at least 50% of fine branch structure for crown continuity. Removing all epicormics growth from the main trunk. T4: Magnolia To thin upper reaches of the crown by 20% only. T5: Magnolia To thin upper reaches of the crown by 20% only.
-
26/03493/ADFULL Awaiting decision
18 Clifton Hill London NW8 0QG
Details of hard and soft landscaping scheme pursuant to condition 8 of planning permission dated 15 November 2024 (RN: 24/03846/FULL)
-
26/02192/TCA Awaiting decision
22 Clifton Hill London NW8 0QG
T2 Sycamore. Carry out a crown reduction to previous pruning points as casts large shade area over court yard garden. current height of 13m approx will be 11-11.5m after pruning Spread is no more than 6m and will be 5m approx after pruning
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.