Skip to content
PlanIndex Get alerts
Menu

Planning application

26/04351/ADFULL

10 Upbrook Mews London W2 3HG

Awaiting decision Westminster Approval of Details (Full PP)

Proposal

Details of sample of the obscure glazing pursuant to condition 5 of planning permission dated 18 April 2023 (RN: 22/07278/FULL)

As published by the council, reference 26/04351/ADFULL

Timeline

Dates from the published record

  1. 1 Jul 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/05193/ADFULL Granted

    29 Upbrook Mews London W2 3HG

    Details of a sample of the obscure glazing, detailed drawings of the privacy screen at roof level and details of a sample of the slate used to clad the front and rear roof slopes must be natural grey slate pursuant to condition 5,6 and 7 of planning permission dated 24th June 2024 (RN:25/02311/FULL)

    25 Jul 2025 15m away Full applications
  • 25/05958/CLLB Granted

    Flat 1 17 Devonshire Terrace London W2 3DW

    Internal cleaning and repairs to address water damage to affected walls and floors including removal and replacement of skirting boards and architrave; replacement of internal floor coverings with timber plank floor covering and ceramic floor tiles; works to internal solid walls to remove and replace ceramic wall tiles from en-suite bathroom; and redecorate walls, ceilings, joinery and pipework.

    15 Aug 2025 47m away
  • 26/02136/LBC Awaiting decision

    80 Gloucester Terrace London W2 3HH

    Construction of box to conceal pipework on front elevation at basement floor level. (Retrospective) (Linked to 26/02135/FULL)

    31 Mar 2026 55m away Heritage and listed buildings
  • 26/02135/FULL Awaiting decision

    80 Gloucester Terrace London W2 3HH

    Construction of box to conceal pipework on front elevation at basement floor level. (Retrospective) (Linked to 26/02136/LBC)

    31 Mar 2026 55m away Full applications
  • 26/00995/LBC Awaiting decision

    27 Gloucester Mews London W2 3HE

    Alterations to basement flat and alterations to the lower ground floor elevation window and door at 72 Gloucester Terrace. [Linked to 26/00994/FULL]

    17 Feb 2026 55m away Heritage and listed buildings
  • 25/08057/LBC Awaiting decision

    Basement Flat 68 Gloucester Terrace London W2 3HH

    Installation of an internal ensuite shower room and utility cupboard within the existing under-pavement vault. (Retrospective)

    5 Nov 2025 56m away Heritage and listed buildings

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications