Skip to content
PlanIndex Get alerts
Menu

Planning application

20 Devonshire Terrace London W2 3DW

Awaiting decision Westminster 26/00924/FULL Full applications

Relates to 26/00925/LBC

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Replacement mechanical equipment to front vault an boiler flue upgrade; replacement front door; and associated works. (Linked to 26/00925/LBC)

As published by the council, reference 26/00924/FULL

Application record

Reference
26/00924/FULL
Category
Full applications
Status
Pending
Received
13 Feb 2026
Validated
5 Aug 2026
Postcode
W2 3DW

Site history

Applications at this address on the Westminster register

This site has had 2 applications since 2026.

  • 26/00925/LBC Awaiting decision

    20 Devonshire Terrace London W2 3DW

    Replacement mechanical equipment to front vault an boiler flue upgrade; replacement front door; and associated works. (Linked to 26/00924/FULL)

    Submitted 13 Feb 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 13 Feb 2026

    Received by Westminster

  2. 5 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 9 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 30 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 26/00925/LBC Awaiting decision

    20 Devonshire Terrace London W2 3DW

    Replacement mechanical equipment to front vault an boiler flue upgrade; replacement front door; and associated works. (Linked to 26/00924/FULL)

    Submitted 13 Feb 2026 Heritage and listed buildings

1 later application on the register refers to this one:

  • 26/00925/LBC Awaiting decision

    20 Devonshire Terrace London W2 3DW

    Replacement mechanical equipment to front vault an boiler flue upgrade; replacement front door; and associated works. (Linked to 26/00924/FULL)

    Submitted 13 Feb 2026 Heritage and listed buildings

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 85 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 20 Devonshire Terrace London W2 3DW

    26/00925/LBC Submitted 13 Feb 2026 0m away

    90% historically approved · decision due ~30 Sep

    Replacement mechanical equipment to front vault an boiler flue upgrade; replacement front door; and associated works. (Linked to 26/00924/FULL)

    Awaiting decision Heritage and listed buildings
  • Flat 1 17 Devonshire Terrace London W2 3DW

    25/05958/CLLB Submitted 15 Aug 2025 2m away

    Internal cleaning and repairs to address water damage to affected walls and floors including removal and replacement of skirting boards and architrave; replacement of internal floor coverings with timber plank floor covering and ceramic floor tiles; works to internal solid walls to remove and replace ceramic wall tiles from en-suite bathroom; and redecorate walls, ceilings, joinery and pipework.

    Granted 11 docs
  • 29 Upbrook Mews London W2 3HG

    25/05193/ADFULL Submitted 25 Jul 2025 31m away

    Details of a sample of the obscure glazing, detailed drawings of the privacy screen at roof level and details of a sample of the slate used to clad the front and rear roof slopes must be natural grey slate pursuant to condition 5,6 and 7 of planning permission dated 24th June 2024 (RN:25/02311/FULL)

    Granted Full applications Windows or glazing 11 docs
  • 10 Upbrook Mews London W2 3HG

    26/04351/ADFULL Submitted 1 Jul 2026 31m away

    89% historically approved · decision due ~26 Aug

    Details of sample of the obscure glazing pursuant to condition 5 of planning permission dated 18 April 2023 (RN: 22/07278/FULL)

    Decided Windows or glazing
  • Flat 9 121 Gloucester Terrace London W2 3HB

    26/04227/FULL Submitted 26 Jun 2026 46m away

    87% historically approved · decision due ~27 Aug

    Installation of slimline double-glazed windows to the front and rear. Internal alterations. [Linked to 26/04228/LBC]

    Awaiting decision Full applications Windows or glazing 21 docs
  • Flat 9 121 Gloucester Terrace London W2 3HB

    26/04228/LBC Submitted 26 Jun 2026 46m away

    90% historically approved · decision due ~27 Aug

    Installation of slimline double-glazed windows to the front and rear; internal refurbishments. [Linked to 26/04227/FULL]

    Awaiting decision Heritage and listed buildings Windows or glazing 17 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications