Skip to content
PlanIndex Get alerts
Menu

Planning application

29 Upbrook Mews London W2 3HG

Granted Westminster 25/05193/ADFULL Approval of Details (Full PP)

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details of a sample of the obscure glazing, detailed drawings of the privacy screen at roof level and details of a sample of the slate used to clad the front and rear roof slopes must be natural grey slate pursuant to condition 5,6 and 7 of planning permission dated 24th June 2024 (RN:25/02311/FULL)

As published by the council, reference 25/05193/ADFULL

Application record

Reference
25/05193/ADFULL
Type
Approval of Details (Full PP)
Status
Decided
Decision
Granted As published: Application Permitted
Received
25 Jul 2025
Validated
3 Sep 2025
Decided
8 Sep 2025
Ward
Lancaster Gate
Decision by
Delegated Decision
Postcode
W2 3HG

Timeline

Dates from the published record

  1. 25 Jul 2025

    Received by Westminster

  2. 3 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 8 Sep 2025

    Decision issued: Application Permitted

  4. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Gateley Smithers Purslow Agent, registered in Birmingham

Active · incorporated 1978 · Birmingham

109 applications on PlanIndex · across 51 councils · 99% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 8 September 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 10 Upbrook Mews London W2 3HG

    26/04351/ADFULL Submitted 1 Jul 2026 50 yards away

    89% historically approved · decision due ~26 Aug

    Details of sample of the obscure glazing pursuant to condition 5 of planning permission dated 18 April 2023 (RN: 22/07278/FULL)

    Decided Windows or glazing
  • 10 Upbrook Mews London W2 3HG

    26/05590/ADFULL Submitted 17 Aug 2026 50 yards away

    Details of a sample of the obscure glazing pursuant to condition 5 of planning permission dated 18.04.2023 (RN:22/07278/FULL)

    Granted Windows or glazing
  • 20 Devonshire Terrace London W2 3DW

    26/00925/LBC Submitted 13 Feb 2026 50 yards away

    90% historically approved · decision due ~30 Sep

    Installation of replacement boiler flue and replacement front door. (Part retrospective) (Linked to 26/00924/FULL)

    Decided Heritage and listed buildings
  • 20 Devonshire Terrace London W2 3DW

    26/00924/FULL Submitted 13 Feb 2026 50 yards away

    88% historically approved · decision due ~30 Sep

    Installation of replacement boiler flue and replacement front door. (part retrospective) (Linked to 26/00925/LBC)

    Decided Full applications
  • 15A Devonshire Terrace London W2 3DW

    26/03576/FULL Submitted 1 Jun 2026 50 yards away

    Erection of an infill extension to basement courtyard to form new bedroom and internal alterations. (Linked with 26/03577/LBC)

    Decided Full applications Extension
  • Flat 1 17 Devonshire Terrace London W2 3DW

    25/05958/CLLB Submitted 15 Aug 2025 50 yards away

    Internal cleaning and repairs to address water damage to affected walls and floors including removal and replacement of skirting boards and architrave; replacement of internal floor coverings with timber plank floor covering and ceramic floor tiles; works to internal solid walls to remove and replace ceramic wall tiles from en-suite bathroom; and redecorate walls, ceilings, joinery and pipework.

    Granted 11 docs

In Westminster

  • 26/07528/FULL Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)

    Received 5 Nov, published by the council 6 Nov 2026 Full applications
  • 26/05200/FULL Decided

    1 The Court House 165 Seymour Place London W1H 4PU

    Installation of waterproofing system to the existing lead flat roofs

    Received 3 Aug, published by the council 28 Aug 2026 Full applications
  • 26/07521/FULL Awaiting decision

    Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ

    Installation of one external condenser unit

    Received 4 Nov, published by the council 6 Nov 2026 Full applications
  • 26/07508/FULL Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07472/FULL Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)

    Received 3 Nov, published by the council 6 Nov 2026 Full applications