Skip to content
PlanIndex Get alerts
Menu

Planning application

26/04288/FULL

18 Clifton Villas London W9 2PH

Awaiting decision Westminster Full Planning Permission Application

Proposal

Replacement of roof finishes

As published by the council, reference 26/04288/FULL

Timeline

Dates from the published record

  1. 29 Jun 2026

    Received by Westminster

  2. 1 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/01297/TCA Awaiting decision

    6A Clifton Villas London W9 2PH

    T1 Magnolia: Fell to ground level Small tree outgrown location T2 Amelanchier: Fell dead T3 Magnolia Grandiflora: Reduce by 1.5-2m To maintain at current dimensions

    2 Mar 2026 17m away Trees
  • 26/01074/TDD Awaiting decision

    8 Clifton Villas London W9 2PH

    1 x bay (rear): fell

    17 Feb 2026 17m away Trees
  • 25/05729/TPO Granted

    17 Clifton Villas London W9 2PH

    1 x lime (T1, front): crown reduce to previous, most recent reduction points, retaining shortened furnishing growth and at least 50% of fine branch structure for crown continuity.

    14 Aug 2025 17m away Trees
  • 25/07111/P3JPA Awaiting decision

    Ground Floor 8 Bristol Gardens London W9 2JG

    Notification for Prior Approval for the change the use of existing ground floor unit into Residential use under the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) Schedule 2, Part 3, Class MA.

    2 Oct 2025 29m away Prior approval
  • 26/03610/TCA Awaiting decision

    13 Clifton Villas London W9 2PH

    T1 Lime: Reduce the crown by approximately 30% (2 to 3 metres) from the height and lateral spread, pruning back to suitable previous reduction points. Remove basal growth and lower secondary branches up to approximately 3 metres above ground level. Justification: The Lime has previously been managed through cyclical crown reduction and has now produced substantial regrowth beyond the previous pruning points. The proposed works are required to maintain the tree at a suitable size for its location, reduce shading to neighbouring gardens and surrounding amenity areas, and prevent further encroachment into adjacent spaces. Removal of basal growth and lower branches will improve clearance beneath the canopy, enhance access and visibility, and create a more appropriate relationship between the tree and surrounding garden areas. The works will retain the tree's overall health, structure and amenity value whilst continuing an established management regime and ensuring the crown remains proportionate to its setting.

    2 Jun 2026 31m away Trees
  • 26/04053/FULL Awaiting decision

    22 Clifton Villas London W9 2PH

    Alterations to an end-of-terrace dwelling comprising the enlargement and increase in number of rooflights at roof level; installation of air-conditioning condensers within the roof valley; removal of the existing glazed roof lantern and replacement with a low-pitch mono-pitched glazed roof at lower ground floor level, including raising the existing flat roof level; replacement of existing windows on a like-for-like basis to match the existing appearance; and raising the height of the boundary wall to Bristol Gardens while maintaining the existing design and detailing.

    19 Jun 2026 41m away Full applications

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications