Planning application
26/04222/FULL
Second Floor Flat 141 Portnall Road London W9 3BN
Proposal
Erection of rear dormer roof extension and formation of third floor roof terrace to second floor flat, including installation of rooflights and associated external alterations.
As published by the council, reference 26/04222/FULL
Timeline
Dates from the published record
-
25 Jun 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/09036/FULL Awaiting decision
Second Floor Flat 163 Portnall Road London W9 3BN
Refurbishment of top floor maisonette, including the demolition and rebuilding of existing rear terrace conservatory, new rear loft dormer, and new metal balustrade to existing roof terrace.
-
26/04529/FULL Awaiting decision
103 Bravington Road London W9 3AS
Modification of existing single storey rear extension and removal of chimney stack.
-
26/02106/FULL Awaiting decision
Second Floor Flat 141 Portnall Road London W9 3BN
Erection of rear dormer roof extension and formation of third floor roof terrace to second floor flat, including installation of rooflights.
-
25/07360/FULL Awaiting decision
Ground Floor Flat 162 Fernhead Road London W9 3EL
Erection of a single-storey ground floor rear extension.
-
25/07635/FULL Awaiting decision
186 Ashmore Road London W9 3DE
Single-storey infill extension, rear dormer extension with front roof lights and the conversion from a single dwelling house into three self-contained flats with the provision of refuse and cycle storage
-
26/00743/FULL Granted
151A Ashmore Road London W9 3DA
Erection of a rear side infill extension, alteration to rear fenestration and replacement of the roof of the existing single storey rear extension.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.