Planning application
186 Ashmore Road London W9 3DE
Works: New dwelling Extension Loft or dormer Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of single-storey full width rear extension at ground floor level; erection of rear dormer extension with front roof lights; conversion from a single dwelling house into three self-contained flats (Use Class C3); installation of refuse and cycle storage in front and rear gardens.
As published by the council, reference 25/07635/FULL
Application record
- Reference
- 25/07635/FULL
- Type
- Full Planning Permission Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 21 Oct 2025
- Validated
- 29 Oct 2025
- Decided
- 4 Mar 2026
- Ward
- Queen's Park
- Decision by
- Complex Delegated Decision
- Postcode
- W9 3DE
Timeline
Dates from the published record
-
21 Oct 2025
Received by Westminster
-
29 Oct 2025
Validated
Checked as complete and ready for consideration.
-
4 Mar 2026
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Redwoods Projects Ltd Agent, registered in London
Active · incorporated 2018 · London
553 applications on PlanIndex · across 24 councils · 67% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
21 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 4 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
151A Ashmore Road London W9 3DA
Erection of a rear side infill extension, alteration to rear fenestration and replacement of the roof of the existing single storey rear extension.
Granted Full applications Extension Windows or glazing 16 docsSmall domestic -
Ground Floor Flat 151 Portnall Road London W9 3BN
88% historically approved · decision due ~16 Dec
Erection of a single storey rear extension.
Awaiting decision Full applications ExtensionSmall domestic -
Second Floor Flat 163 Portnall Road London W9 3BN
89% historically approved · decision due ~12 Nov
Details of photographs of the facing materials pursuant to condition 3 of planning permission dated 26 August 2026 (RN: 25/09036/FULL)
Awaiting decision -
Second Floor Flat 141 Portnall Road London W9 3BN
88% historically approved · decision due ~26 Nov
Erection of a rear dormer roof extension and the installation of three rooflights to front roof slope.
Awaiting decision Full applications Extension Loft or dormer -
Second Floor Flat 141 Portnall Road London W9 3BN
88% historically approved · decision due ~20 Aug
Erection of rear dormer roof extension and formation of third floor roof terrace to second floor flat, including installation of rooflights and associated external alterations.
Awaiting decision Full applications Extension Loft or dormer -
Second Floor Flat 141 Portnall Road London W9 3BN
88% historically approved · decision due ~25 May
Erection of rear dormer roof extension and formation of third floor roof terrace to second floor flat, including installation of rooflights.
Awaiting decision Full applications Extension Loft or dormer 17 docs
Other full applications
In Westminster
-
26/07528/FULL Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)
-
26/05200/FULL Decided
1 The Court House 165 Seymour Place London W1H 4PU
Installation of waterproofing system to the existing lead flat roofs
-
26/07521/FULL Awaiting decision
Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ
Installation of one external condenser unit
-
26/07508/FULL Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)
-
26/07472/FULL Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)