Skip to content
PlanIndex Get alerts
Menu

Planning application

26/04097/FULL

Development Site At Olympia Mews And 28 To 34 Queensway London

Awaiting decision Westminster Full Planning Permission Application

Proposal

Variation of condition 4, 16, 23, 31, 39, 40, 41, 42, 43 of planning permission dated 23rd July 2024 (RN:23/07119/FULL) for the Variation of Condition 1 (approved plans) of planning permission dated 11 May 2022 (RN:18-09727-FULL) as amended by two non-material amendments (23/04588/NMA & 23/06258/NMA) for Demolition of existing buildings at Nos 28-34 Queensway and Olympia Mews and redevelopment of site by erection of a six storey, plus basement level, building comprising Class E retail floor space and residential flats (Class C3) and erection of a replacement two storey building for use as Class E office floorspace, together with associated landscaping. Namely, Introduction of greater flexibility of use of the Olympia Mews building, variation of condition 16 to become a compliance condition in relation to noise assessment, variation of condition 23 (parts B and C) to become a compliance condition in relation to conservation method statement, variation of conditions 31, 41, 42, 43, with submission of relevant information to amend this to become a compliance condition, in relation to all planting and soft landscaping across the scheme, cariation of condition 39 and 40, with submission of relevant information to amend this to become a compliance condition, in relation to tree protection and arboricultural monitoring, minor design changes to three apartments in the scheme and minor design changes to the communal garden area, and landscaping strategy.

As published by the council, reference 26/04097/FULL

Timeline

Dates from the published record

  1. 22 Jun 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/05122/FULL Refused

    Flat 7 36 Queensway London W2 3RX

    Installation of window to roof slope; Installation of door and railings around the rear outrigger to create terrace at top floor level.

    23 Jul 2025 10m away Full applications
  • 25/07030/NMA Awaiting decision

    Development Site At Olympia Mews And 28 To 34 Queensway London

    Amendment to planning permission dated 23rd July 2024 (RN 23/07119/FULL) for the Variation of Condition 1 (approved plans) of planning permission dated 11 May 2022 (RN:18-09727-FULL) as amended by two non-material amendments (23/04588/NMA & 23/06258/NMA) for Demolition of existing buildings at Nos 28-34 Queensway and Olympia Mews and redevelopment of site by erection of a six storey, plus basement level, building comprising Class E retail floor space and residential flats (Class C3) and erection of a replacement two storey building for use as Class E office floorspace, together with associated landscaping; NAMELY, to amend the approved ground floor plan to allow for changes to the substation access point so this can keep in line with UKPN requirements the replacement of the currently approved two sets of double doors with a single larger set of double doors for the substation.

    30 Sep 2025 18m away Amendments
  • 26/04682/EEN Awaiting decision

    Our Lady Queen Of Heaven Church 46 Queensway London W2 3RS

    Upgrade and install additional external lighting to the front façade to enhance the front elevation.

    14 Jul 2026 26m away
  • 26/02769/LBC Awaiting decision

    Basement 15 Inverness Terrace London W2 3JL

    Internal works associated with the creation of lower ground flats A & B (retrospective works completed 2011)

    27 Apr 2026 30m away Heritage and listed buildings
  • 26/04680/EEN Awaiting decision

    Our Lady Queen Of Heaven Church 46 Queensway London W2 3RS

    Refurbishment of the basement hall including remedial works to damp plaster, reconfiguration of toilet facilities, refurbishment of kitchen and decorations. Investigations into basement floor joists.

    9 Jul 2026 47m away
  • 26/03511/FULL Awaiting decision

    Our Lady Queen Of Heaven Church 46 Queensway London W2 3RS

    Installation of additional external lighting to the front facade; and other associated works. Linked with 26/03512/LBC

    28 May 2026 49m away Full applications

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications