Awaiting decision Westminster 26/03961/FULL Full applications

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of two existing shopfronts to 200 and 202 Baker Street, replacement with new, proposed timber shopfronts.

As published by the council, reference 26/03961/FULL

Application record

Reference
26/03961/FULL
Category
Full applications
Status
Pending
Received
16 Jun 2026
Validated
17 Jun 2026
Postcode
NW1 5RZ

Timeline

Dates from the published record

  1. 16 Jun 2026

    Received by Westminster

  2. 17 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 12 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 91 days over the applications it decided in the last year.

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 2 Station Approach Marylebone Road London NW1 5LD

    26/03397/ADV Submitted 22 May 2026 50 yards away

    82% historically approved · decision due ~17 Jul

    Display of a non-illuminated projecting sign measuring 0.6m x 0.6m.

    Awaiting decision Advertising 9 docs
  • Madame Tussauds Marylebone Road London NW1 5LR

    25/05717/FULL Submitted 14 Aug 2025 50 yards away

    Replacement of existing doors and surrounding walls on Madame Tussauds' Allsop Place elevation.

    Granted Full applications 23 docs
  • 7 Station Approach Marylebone Road London NW1 5LD

    26/04802/LBC Submitted 17 Jul 2026 50 yards away

    Installation of a telecommunications cable internally and externally to station operations office.

    Decided Heritage and listed buildings
  • 8 Station Approach Marylebone Road London NW1 5LD

    25/07454/LBC Submitted 15 Oct 2025 50 yards away

    90% historically approved · decision due ~10 Dec

    Replacement timber shopfronts to nos 1 and 8 Station Approach and respraying of former luggage lift shutter. (Linked with 25/06325/FULL).

    Decided Heritage and listed buildings 23 docs
  • 8 Station Approach Marylebone Road London NW1 5LD

    25/06325/FULL Submitted 5 Sep 2025 50 yards away

    Replacement timber shopfronts to nos 1 and 8 Station Approach and respraying of former luggage lift shutter. (Linked with 25/07454/LBC)

    Decided Full applications 22 docs
  • 3 - 4 Station Approach Marylebone Road London NW1 5LD

    26/04700/ADV Submitted 14 Jul 2026 50 yards away

    82% historically approved · decision due ~8 Sep

    Display of a double-sided advertisement panel consisting of 2 LED screens both measuring 2370mm x 1338mm attached to the bus shelter (0133/3405) on Marylebone Road between junctions with Allsop Place and Baker Street.

    Awaiting decision Advertising

In Westminster

  • 26/07528/FULL Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)

    Received 5 Nov, published by the council 6 Nov 2026 Full applications
  • 26/05200/FULL Decided

    1 The Court House 165 Seymour Place London W1H 4PU

    Installation of waterproofing system to the existing lead flat roofs

    Received 3 Aug, published by the council 28 Aug 2026 Full applications
  • 26/07521/FULL Awaiting decision

    Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ

    Installation of one external condenser unit

    Received 4 Nov, published by the council 6 Nov 2026 Full applications
  • 26/07508/FULL Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07472/FULL Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)

    Received 3 Nov, published by the council 6 Nov 2026 Full applications