Skip to content
PlanIndex Get alerts
Menu

Planning application

11 - 17 Seymour Street London W1H 7JW

Awaiting decision Westminster 26/03935/FULL Full applications

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

External refurbishment of the Leonard Hotel comprising replacement of existing entrance steps with limestone, alterations to the front entrance doors through the introduction of glazing and panes, erection of a small canopy above the restaurant entrance, and replacement of the existing canopy in burgundy. (Linked to 26/03936/LBC)

As published by the council, reference 26/03935/FULL

Application record

Reference
26/03935/FULL
Category
Full applications
Status
Pending
Received
15 Jun 2026
Validated
18 Aug 2026
Postcode
W1H 7JW

Timeline

Dates from the published record

  1. 15 Jun 2026

    Received by Westminster

  2. 18 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 13 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 11 - 17 Seymour Street London W1H 7JW

    26/03936/LBC Submitted 15 Jun 2026 0m away

    90% historically approved · decision due ~13 Oct

    External refurbishment of the Leonard Hotel comprising replacement of existing entrance steps with limestone, alterations to the front entrance doors through the introduction of glazing and panes, erection of a small canopy above the restaurant entrance, and replacement of the existing canopy in burgundy. (Linked to 26/03935/FULL)

    Awaiting decision Heritage and listed buildings Windows or glazing
  • 1 Seymour Street London W1H 7JW

    26/05709/ADV Submitted 20 Aug 2026 0m away

    85% historically approved · decision due ~30 Oct

    Display of non illuminated other sign measuring 2.315m X 1.712m, 12.59m X 0.32m and internally illuminated other sign 1.24m X 3.27m,

    Awaiting decision Advertising
  • 16 Bryanston Street London W1H 7EF

    25/05733/FULL Submitted 14 Aug 2025 31m away

    Flexible use of part lower ground, ground and first floors as retail, gymnasium, office, medical (Class E); gallery, education, conference (Class F1); Members Club, showroom, or events space (Sui Generis) use. (1-9 Seymour Street).

    Granted Full applications 15 docs
  • 4 Bryanston Street London W1H 7BY

    25/07844/LBC Submitted 29 Oct 2025 36m away

    90% historically approved · decision due ~24 Dec

    Installation of replacement plant equipment. (Linked to 25/07843/FULL)

    Awaiting decision Heritage and listed buildings 24 docs
  • 4 Bryanston Street London W1H 7BY

    25/07843/FULL Submitted 29 Oct 2025 36m away

    87% historically approved · decision due ~24 Dec

    Installation of replacement plant equipment. (Linked to 25/07844/LBC)

    Awaiting decision Full applications 24 docs
  • 4 Bryanston Street London W1H 7BY

    25/07348/ADLBC Submitted 10 Oct 2025 37m away

    Detailed drawings of new timber doors to Portman Street pursuant to Condition 3 of listed building consent dated 21st August 2025 (RN:25/04007/LBC).

    Granted Conditions 4 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications