Planning application
26/03683/CLLB
100 Pall Mall London SW1Y 5NQ
Proposal
DOFF clean of external elevations; Localised roof slate replacements; Localised leadwork repair/replacement to areas that have been damaged at 6th floor terrace; Gutter repairs; Lightwell elevational tile replacements; Mansafe system replacement; Lightwell bird netting replacement; Fenestration repairs and decorations; and Metalwork decorations and localised repairs.
As published by the council, reference 26/03683/CLLB
Timeline
Dates from the published record
-
4 Jun 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Westminster is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
2025/3947 Withdrawn
Battersea Power Station
Erection of interim building facades at Lower Ground, Upper Ground for temporary Retail (Use (Class E(a)) and erection of demountable lift core at podium level for a period of five years. Together with hard and soft landscaping, servicing and access arrangements
-
25/07317/LBC Awaiting decision
100 Pall Mall London SW1Y 5NQ
Internal alterations to first floor, including the adjustment of internal partition walls and relocation of electrics and lighting.
-
26/01498/ADV Refused
29 Pall Mall London SW1Y 5LP
Display of two non-illuminated flags mounted on projecting poles affixed to the front elevation at ground floor level, positioned either side of the main entrance.
-
26/01081/LBC Awaiting decision
89 - 91 Pall Mall London SW1Y 5HS
Refurbishment of first floor banqueting rooms: Committee Room, Mall Room, Small Mall Room and Segrave Room.
-
26/04789/LBC Awaiting decision
89 - 91 Pall Mall London SW1Y 5HS
Installation of glass safety balustrades around the existing squash court area.
-
26/04788/LBC Awaiting decision
89 - 91 Pall Mall London SW1Y 5HS
Addition of handrails to improve accessibility in to the existing swimming pool.