Planning application

26/03683/CLLB

100 Pall Mall London SW1Y 5NQ

Awaiting decision Westminster Cert of Law - Prposed works to LB

Proposal

DOFF clean of external elevations; Localised roof slate replacements; Localised leadwork repair/replacement to areas that have been damaged at 6th floor terrace; Gutter repairs; Lightwell elevational tile replacements; Mansafe system replacement; Lightwell bird netting replacement; Fenestration repairs and decorations; and Metalwork decorations and localised repairs.

As published by the council, reference 26/03683/CLLB

Timeline

Dates from the published record

  1. 4 Jun 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Westminster is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • 2025/3947 Withdrawn

    Battersea Power Station

    Erection of interim building facades at Lower Ground, Upper Ground for temporary Retail (Use (Class E(a)) and erection of demountable lift core at podium level for a period of five years. Together with hard and soft landscaping, servicing and access arrangements

    3 Nov 2025 6m away
  • 25/07317/LBC Awaiting decision

    100 Pall Mall London SW1Y 5NQ

    Internal alterations to first floor, including the adjustment of internal partition walls and relocation of electrics and lighting.

    9 Oct 2025 8m away Heritage and listed buildings
  • 26/01498/ADV Refused

    29 Pall Mall London SW1Y 5LP

    Display of two non-illuminated flags mounted on projecting poles affixed to the front elevation at ground floor level, positioned either side of the main entrance.

    9 Mar 2026 42m away Advertising
  • 26/01081/LBC Awaiting decision

    89 - 91 Pall Mall London SW1Y 5HS

    Refurbishment of first floor banqueting rooms: Committee Room, Mall Room, Small Mall Room and Segrave Room.

    20 Feb 2026 43m away Heritage and listed buildings
  • 26/04789/LBC Awaiting decision

    89 - 91 Pall Mall London SW1Y 5HS

    Installation of glass safety balustrades around the existing squash court area.

    17 Jul 2026 56m away Heritage and listed buildings
  • 26/04788/LBC Awaiting decision

    89 - 91 Pall Mall London SW1Y 5HS

    Addition of handrails to improve accessibility in to the existing swimming pool.

    17 Jul 2026 56m away Heritage and listed buildings