Skip to content
PlanIndex Get alerts
Menu

Planning application

52 Oxford Street London W1D 1BG

Awaiting decision Westminster 26/03650/CLOPUD Certificate of Lawfulness (proposed)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Use of basement and ground floors as a restaurant (Use Class E(b)).

As published by the council, reference 26/03650/CLOPUD

Application record

Reference
26/03650/CLOPUD
Type
Certificate of Lawfulness (proposed)
Status
Pending
Received
4 Jun 2026
Validated
4 Jun 2026
Ward
West End
Postcode
W1D 1BG

Site history

Applications at this address on the Westminster register

This site has had 3 applications since 2026.

  • 26/04124/ADV Awaiting decision

    52 Oxford Street London W1D 1BG

    Display of internally illuminated fascia signs measuring 0.55m x 2.48m and 0.16m x 2.83m at Rathbone Place façade; internally illuminated face sign measuring 0.65m x 2.48m and three internally illuminated sings behind the shopfront glazing measuring 0.16m x 0.98m, 0.16m x 1.00m, and .16m x 0.44m at Oxford Street façade; two non-illuminated hanging signs each measuring 0.74m x 0.74m; and an internally illuminated fascia sign above entrance measuring 1.79m x 2.17m. (Linked with 26/04123/FULL)

    Submitted 23 Jun 2026 Advertising
  • 26/04123/FULL Decided

    52 Oxford Street London W1D 1BG

    Shopfront alterations and associated works.

    Submitted 23 Jun 2026 Full applications

Timeline

Dates from the published record

  1. 4 Jun 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 30 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 65 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided lawful development applications in a median of 78 days. More in our guide to how long planning decisions take.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 52 Oxford Street London W1D 1BG

    26/04124/ADV Submitted 23 Jun 2026 0m away

    84% historically approved · decision due ~24 Aug

    Display of internally illuminated fascia signs measuring 0.55m x 2.48m and 0.16m x 2.83m at Rathbone Place façade; internally illuminated face sign measuring 0.65m x 2.48m and three internally illuminated sings behind the shopfront glazing measuring 0.16m x 0.98m, 0.16m x 1.00m, and .16m x 0.44m at Oxford Street façade; two non-illuminated hanging signs each measuring 0.74m x 0.74m; and an internally illuminated fascia sign above entrance measuring 1.79m x 2.17m. (Linked with 26/04123/FULL)

    Awaiting decision Advertising Windows or glazing 11 docs
  • 36 - 38 Hanway Street London W1T 1UP

    25/07080/FULL Submitted 2 Oct 2025 5m away

    External alterations including replacement windows, replacement roof coverings, new doors and other associated works. (Site include 36-38, 42-44 Hanway Street & 50 Oxford Street)

    Granted Full applications Roofing Windows or glazing 53 docs
  • 50 Oxford Street London W1D 1BG

    25/08047/ADV Submitted 5 Nov 2025 7m away

    84% historically approved · decision due ~2 Jan

    Display of a non-illuminated vinyl graphics applied to the window area (Hanway Street side elevation) measuring 7.44m x 2.49m.

    Awaiting decision Advertising Windows or glazing 3 docs
  • 52 Oxford Street London W1D 1BG

    26/04123/FULL Submitted 23 Jun 2026 9m away

    87% historically approved · decision due ~18 Aug

    Shopfront alterations and associated works.

    Decided Full applications Windows or glazing
  • Ground Floor Ashbrook House 3-5 Rathbone Place London W1T 1HJ

    22/05128/ADV Submitted 28 Jul 2022 20m away

    Display of two internally illuminated signs measuring 0.8m x 4.75m and 0.3m x 0.5m and one internally illuminated projecting sign measuring 0.9m x 1.2m

    Granted Advertising 7 docs
  • 6 Rathbone Place London W1T 1HL

    06/03498/FULL Submitted 8 May 2006 30m away

    External alterations to the front elevation.

    Granted Full applications 6 docs

In Westminster

  • 26/06158/CLOPUD Awaiting decision

    2 Hamilton Gardens London NW8 9PT

    Erection of replacement, enlarged single storey ground floor rear extension.

    9 Sep 2026 Lawful development
  • 26/06080/CLEUD Awaiting decision

    91 Gloucester Place London W1U 6JG

    Certificate of lawfulness for an existing use or development to confirm that the development authorised by full planning permission ref. 22/08385/FULL & listed building consent (RN 22/08386/LBC) has lawfully commenced as a result of the works evidenced.

    7 Sep 2026 Lawful development
  • 26/06044/CLOPUD Awaiting decision

    9 Abinger Mews W9 3SP

    Proposed loft conversion with rear dormer and 3 front rooflights to existing mid-terraced house.

    3 Sep 2026 Lawful development
  • 26/06035/CLOPUD Awaiting decision

    30 Ashworth Road W9 1JY

    Erection of new garden retaining wall and erection of new garden timber fence to match the height of existing fence.

    3 Sep 2026 Lawful development
  • 26/05871/CLEUD Awaiting decision

    32 Cambridge Street London SW1V 4QH

    Confirmation of the lawful implementation of planning permission dated 13 August 2021 (RN: 21/04143/FULL) has commenced before the expiry of the three year time period and may, therefore, lawfully be carried out and completed.

    27 Aug 2026 Lawful development